UK Water Projects Online

UK Water Projects Online

UK Water Projects 2017 Edition

UK Water Projects Virtual Edition

Be Listed on Water Projects Online

Contact UK Water Projects

Process Plant & Equipment

 

Water Company

Edition

Innovations & Technologies

Consultants

Civil Engineers

Process  Engineers

Plant & Equipment

Process Plant & Equipment ►► Aquasystems International NV

Aquasystems International NV

Aquasystems International NV specialise in the design, supply and installation of a comprehensive range of aeration, mixing and decanting equipment for wastewater treatment, which includes :

►  AQUA TURBO® AER-AS, F & FES direct drive surface aerators; floating & fixed mounted, low speed aerators, submersible aerators, downdraft mixers, submersible mixers, direct drive combined aerator/mixer and AQUA DECANTTM floating open and mechanically closed decanters AD-MC.

►  AQUA TURBO® newly developed products include scum mixing and removal equipment such as the FRED and FRMD devices and also the Foam Breaker type FB are now available for any problems associated with floatable materials.

►  Aquasystems International NV has available for immediate hire a comprehensive range of floating aerators and mixers.

Aquasystems International NV also produce a wide range of Mixers ideal for Waste Water including the highly efficient Aqua Turbo MIX-GS. This stainless steel helical type mixers uses less than 3 watts per m3 mixing energy in a typical Anoxic Zone application. The MIX-GS can be bridge mounted or submersible. Aquasystems produce Foam Breakers, Scum removal systems and decanters for SBR applications all in stainless steel.

Thanks to Aquasystems wide product range, the right aerator or mixer type and selection can be made for each application. The company has over 10,000 installations world-wide and an international reputation for supplying high quality/performance equipment, based on own design such as, the SCREWPELLER®, the AQUA DECANT®, the FREDTM.

Aquasystems International NV has a UK office in Wilmslow, Cheshire, managed by Peter Wood tel 07939 096048 and the headquarters are in Halle, Belgium.

     

 

Contact

Index of case studies

   

 

Aquasystems International NV
The Beeches, 4a Beechfield Ave
Wilmslow
Cheshire SK9 6LX

Tel: 01625 531944

Fax: 01625 537477
pwood@aquaturbo.demon.co.uk
www.aquaturbo.be

The links below detail projects featured in the UK Water Projects publication with which Aquasystems International NV were involved

All Wastewater Treatment & Sewerage Projects

Five Fords WwTW

Dwr Cymru Welsh Water

2012

Lampeter WwTW

Dwr Cymru Welsh Water

2013

Coalport STW

Severn Trent Water

2012-13 (V)

Rushmoor STW

Severn Trent Water

2013

Stoke Bardolph STW

Severn Trent Water

2013

Wanlip STW - Sludge Project

Severn Trent Water

2014

Ashford WwTW

Southern Water

2013

Brighton & Hove WwT Scheme (Handover & Completion)

Southern Water

2014

Brighton & Hove WwT Scheme (Commissioning to Operations)

Southern Water

2013

Pennington WwTW

Southern Water

2013

Oxford STW  - Sludge Stream Upgrade

Thames Water

2014

Oxford STW - Thermal Hydrolysis Plant

Thames Water

2013

Ellesmere Port & Oldham CHP

United Utilities

2013

Oldham and Royton Integrated Strategy (ORIS)

United Utilities

2015

Runcorn WwTW - Phase II

United Utilities

2013-14 (V)

Blackburn Meadows WwTW - Bio-Energy Digester

Yorkshire Water

2013

Blackburn Meadows WwTW - FFD Scheme

Yorkshire Water

2012

Woodhouse Mill WwTW

Yorkshire Water

2013

Woodhouse Mill WwTW

Yorkshire Water

2012-13 (V)


Wastewater Treatment Works

Five Fords WwTW

Dwr Cymru Welsh Water

2012

Lampeter WwTW

Dwr Cymru Welsh Water

2013

Coalport STW

Severn Trent Water

2012-13 (V)

Rushmoor STW

Severn Trent Water

2013

Stoke Bardolph STW

Severn Trent Water

2013

Ashford WwTW

Southern Water

2013

Brighton & Hove WwT Scheme (Handover & Completion)

Southern Water

2014

Brighton & Hove WwT Scheme (Commissioning to Operations)

Southern Water

2013

Pennington WwTW

Southern Water

2013

Oldham and Royton Integrated Strategy (ORIS)

United Utilities

2015

Runcorn WwTW - Phase II

United Utilities

2013-14 (V)

Blackburn Meadows WwTW - FFD Scheme

Yorkshire Water

2012

Woodhouse Mill WwTW

Yorkshire Water

2013

Woodhouse Mill WwTW

Yorkshire Water

2012-13 (V)


Sludge Treatment

Five Fords WwTW

Dwr Cymru Welsh Water

2012

Rushmoor STW

Severn Trent Water

2013

Stoke Bardolph STW

Severn Trent Water

2013

Wanlip STW - Sludge Project

Severn Trent Water

2014

Oxford STW  - Sludge Stream Upgrade

Thames Water

2014

Oxford STW - Thermal Hydrolysis Plant

Thames Water

2013

Blackburn Meadows WwTW - Bio-Energy Digester

Yorkshire Water

2013

Woodhouse Mill WwTW

Yorkshire Water

2013


All Water Treatment & Supply Projects

Bristol Resilience - Durdham Down Combined Main

Bristol Water

2013

Purton & Littleton WTWs - Surface Aeration

Bristol Water

2015

Bough Beech WTW

Sutton & East Surrey Water

2012


Renewable Energy Projects

Five Fords WwTW

Dwr Cymru Welsh Water

2012

Oxford STW  - Sludge Stream Upgrade

Thames Water

2014

Oxford STW - Thermal Hydrolysis Plant

Thames Water

2013

Ellesmere Port & Oldham CHP

United Utilities

2013

Blackburn Meadows WwTW - Bio-Energy Digester

Yorkshire Water

2013


UK Water Projects - 2015 Edition

Purton & Littleton WTWs - Surface Aeration

Bristol Water

2015

Oldham and Royton Integrated Strategy (ORIS)

United Utilities

2015


UK Water Projects - 2014 Edition

Wanlip STW - Sludge Project

Severn Trent Water

2014

Brighton & Hove WwT Scheme (Handover & Completion)

Southern Water

2014

Oxford STW  - Sludge Stream Upgrade

Thames Water

2014


UK Water Projects - 2013 Edition

Bristol Resilience - Durdham Down Combined Main

Bristol Water

2013

Lampeter WwTW

Dwr Cymru Welsh Water

2013

Rushmoor STW

Severn Trent Water

2013

Stoke Bardolph STW

Severn Trent Water

2013

Ashford WwTW

Southern Water

2013

Brighton & Hove WwT Scheme (Commissioning to Operations)

Southern Water

2013

Pennington WwTW

Southern Water

2013

Oxford STW - Thermal Hydrolysis Plant

Thames Water

2013

Ellesmere Port & Oldham CHP

United Utilities

2013

Blackburn Meadows WwTW - Bio-Energy Digester

Yorkshire Water

2013

Woodhouse Mill WwTW

Yorkshire Water

2013


UK Water Projects - 2013-2014 Virtual Edition

Runcorn WwTW - Phase II

United Utilities

2013-14 (V)


UK Water Projects - 2012 Edition

Five Fords WwTW

Dwr Cymru Welsh Water

2012

Blackburn Meadows WwTW - FFD Scheme

Yorkshire Water

2012


UK Water Projects - 2012-2013 Virtual Edition

Coalport STW

Severn Trent Water

2012-13 (V)

Woodhouse Mill WwTW

Yorkshire Water

2012-13 (V)

UK Water Projects Online

▲ TOP ▲

UK Water Projects Online