UK Water Projects Online

UK Water Projects Online

UK Water Projects 2017 Edition

UK Water Projects Virtual Edition

Be Listed on Water Projects Online

Contact UK Water Projects

Process Plant & Equipment

Water Company

Edition

Innovations & Technologies

Consultants

Civil Engineers

Process  Engineers

Plant & Equipment

Process Plant & Equipment ►► MeasurIT Technologies Ltd

MeasurIT Technologies Ltd

MeasurIT Technologies Ltd are the official UK and Ireland stockist and distributor for the Red Valve and Tideflex products. MeasurIT staff are factory-trained and supported by RedValve, the parent company of Tideflex Technologies, which manufactures the valves in the USA. We have decades of extensive experience with Tideflex products installations. We offer design, specification, installation and troubleshooting advice on all our Tideflex products. Please feel free to reach out to us at any stage of your project life cycle. Tideflex Check Valves are cost-effective because they have a long life span and require no maintenance. Consider the Tideflex track record when making TOTEX decisions for your drainage asset management.

The Tideflex duckbill check valve is a revolutionary design for back flow prevention in drain and sewer systems for wastewater and stormwater drainage. Tideflex non-return valves are the original duckbill valves consisting of a one-piece rubber matrix of numerous natural and synthetic elastomers and ply reinforcement, similar in construction to a truck tyre. The one-way valves operate using line pressure and back pressure to open and close, so no outside energy source is required.

Tideflex check valves are a simple and reliable alternative to ineffective drainage flap valves and tidal flap valves because they are constructed out of reinforced rubber. Therefore there are no moving parts that can corrode, warp or freeze. Tideflex valves will handle large obstructions without jamming, and there is no gate to be stuck open. This provides peace of mind for stormwater and combined sewer overflow systems designed to provide flood protection for low-lying areas.

     

Photographs

Contact

Index of case studies

   

 

►  Process Engineering

MeasurIT Technologies Ltd

35-45 Parr Street

Liverpool

L1 4JN

Tel: 0151 324 0021
0151 808 0631
info@measurit.com
www.measurit.com

The links below detail projects featured in the UK Water Projects publication with which MeasurIT Technologies Ltd were involved

All Wastewater Treatment & Sewerage Projects

Hartridge UID Scheme

Dwr Cymru Welsh Water

2013-14 (V)

Belle Greve Wastewater Centre Phase IV - Long Sea Outfall

Guernsey Water

2016

Bangor Sewerage Improvement Scheme

Northern Ireland Water

2014

Holywood Sewer Network Improvements Project

Northern Ireland Water

2015

Maghera & Dungiven WwTWs

Northern Ireland Water

2012

Newry Road Wastewater Pumping Station

Northern Ireland Water

2014

Boat of Garten WwTW

Scottish Water

2015

Cowdenbeath Wetlands

Scottish Water

2014

Welshpool STW

Severn Trent Water

2014

Truro DG5 Flooding Scheme

South West Water

2015-16 (V)

Thanet Sewer Rehabilitation Scheme

Southern Water

2015-16 (V)

Kennington Road Flood Alleviation Scheme

Thames Water

2014

Barrow in Furness WwTW Outfall

United Utilities

2015

Barrow WwTW

United Utilities

2014

Liverpool WwTW

United Utilities

2014

Liverpool WwTW - Outfall Extension

United Utilities

2014

Liverpool WwTW

United Utilities

2013

Millom WwTW - Stormwater UV Plant

United Utilities

2013

Preston 32 UIDs

United Utilities

2013

Whitehaven (Parton) Long Sea Outfall

United Utilities

2013

Bridlington Stormwater Outfall

Yorkshire Water

2015

Esholt WwTW - Bio-Energy Installation

Yorkshire Water

2013


Wastewater Treatment Works

Maghera & Dungiven WwTWs

Northern Ireland Water

2012

Boat of Garten WwTW

Scottish Water

2015

Cowdenbeath Wetlands

Scottish Water

2014

Welshpool STW

Severn Trent Water

2014

Barrow WwTW

United Utilities

2014

Liverpool WwTW

United Utilities

2014

Liverpool WwTW

United Utilities

2013

Esholt WwTW - Bio-Energy Installation

Yorkshire Water

2013


Sewerage & Flood Alleviation

Hartridge UID Scheme

Dwr Cymru Welsh Water

2013-14 (V)

Belle Greve Wastewater Centre Phase IV - Long Sea Outfall

Guernsey Water

2016

Bangor Sewerage Improvement Scheme

Northern Ireland Water

2014

Holywood Sewer Network Improvements Project

Northern Ireland Water

2015

Newry Road Wastewater Pumping Station

Northern Ireland Water

2014

Truro DG5 Flooding Scheme

South West Water

2015-16 (V)

Thanet Sewer Rehabilitation Scheme

Southern Water

2015-16 (V)

Kennington Road Flood Alleviation Scheme

Thames Water

2014

Barrow in Furness WwTW Outfall

United Utilities

2015

Liverpool WwTW - Outfall Extension

United Utilities

2014

Millom WwTW - Stormwater UV Plant

United Utilities

2013

Preston 32 UIDs

United Utilities

2013

Whitehaven (Parton) Long Sea Outfall

United Utilities

2013

Bridlington Stormwater Outfall

Yorkshire Water

2015


All Water Treatment & Supply Projects

Elsham WTW

Anglian Water

2013

Clay Lake WTW

Northern Ireland Water

2012

River Strule Abstraction Project

Northern Ireland Water

2014-15 (V)

Overton WTW

Southern Water

2013


UK Water Projects - 2016 Edition

Belle Greve Wastewater Centre Phase IV - Long Sea Outfall

Guernsey Water

2016


UK Water Projects - 2015 Edition

Holywood Sewer Network Improvements Project

Northern Ireland Water

2015

Boat of Garten WwTW

Scottish Water

2015

Barrow in Furness WwTW Outfall

United Utilities

2015

Bridlington Stormwater Outfall

Yorkshire Water

2015


UK Water Projects - 2015-2016 Virtual Edition

Truro DG5 Flooding Scheme

South West Water

2015-16 (V)

Thanet Sewer Rehabilitation Scheme

Southern Water

2015-16 (V)


UK Water Projects - 2014 Edition

Bangor Sewerage Improvement Scheme

Northern Ireland Water

2014

Newry Road Wastewater Pumping Station

Northern Ireland Water

2014

Cowdenbeath Wetlands

Scottish Water

2014

Welshpool STW

Severn Trent Water

2014

Kennington Road Flood Alleviation Scheme

Thames Water

2014

Barrow WwTW

United Utilities

2014

Liverpool WwTW

United Utilities

2014

Liverpool WwTW - Outfall Extension

United Utilities

2014


UK Water Projects - 2014-2015 Virtual Edition

River Strule Abstraction Project

Northern Ireland Water

2014-15 (V)


UK Water Projects - 2013 Edition

Elsham WTW

Anglian Water

2013

Overton WTW

Southern Water

2013

Liverpool WwTW

United Utilities

2013

Millom WwTW - Stormwater UV Plant

United Utilities

2013

Preston 32 UIDs

United Utilities

2013

Whitehaven (Parton) Long Sea Outfall

United Utilities

2013

Esholt WwTW - Bio-Energy Installation

Yorkshire Water

2013


UK Water Projects - 2013-2014 Virtual Edition

Hartridge UID Scheme

Dwr Cymru Welsh Water

2013-14 (V)


UK Water Projects - 2012 Edition

Clay Lake WTW

Northern Ireland Water

2012

Maghera & Dungiven WwTWs

Northern Ireland Water

2012

UK Water Projects Online

▲ TOP ▲

UK Water Projects Online