UK Water Projects Online

UK Water Projects Ltd, PO Box 141, Lancaster LA1 5GZ

    mail@ukwaterprojects.com

UK Water Projects 2014 Edition

UK Water Projects Virtual Edition

Be Listed on Water Projects Online

Contact UK Water Projects

Process Plant & Equipment

 

Water Company

Edition

Innovations & Technologies

Consultants

Civil Engineers

Process  Engineers

Plant & Equipment

Process Plant & Equipment ►► VAG Valves UK

Process Plant & Equipment

►  Valves, Actuators and Controls

VAG Valves UK

VAG manufactures Valves and Penstocks that play an important role wherever the medium is being treated, moved, stored, controlled or distributed. Boasting over 140 years of manufacturing experience and extensive engineering expertise, Valves and Penstocks manufactured by VAG are installed throughout the world.

No matter whether the requirement is in the Water, Waste Water, Dams & Hydro, Pressure Management or Power Plant sector, VAG valves are the accomplished partner with one of the world’s largest product portfolios of Valves and Penstocks from 50mm up to 4000mm.

The comprehensive product range includes; Butterfly, Gate, Needle, Free discharge, Pilot operated PRV, Non-return/Check, Air Valves and Penstocks as well as a complete range of pipe jointing components.

VAG is certified with over 160 global standards. We take pride in offering many added values to our customers, this all comes as part of the VAG service and we welcome any enquiry you may have in the future.

     

 

Contact

Index of case studies

   

 

VAG Valves UK

Unit 4, Museum Business Park

Woodhead Road

Glasgow G53 7NN

Tel: 0141 881 5578
Fax: 0141 881 0655
enquiry-uk@vag-group.com
www.vag-armaturen.com

The links below detail projects featured in the UK Water Projects publication with which VAG Valves UK were involved

Sort case studies by

►  All Wastewater Treatment & Sewerage

  Wastewater Treatment Works

  Sludge Treatment

  Sewerage & Flood Alleviation

►  All Water Treatment & Supply

  Water Treatment Works

  Reservoirs & Storage

  Pipelines & Pumping Stations

►  Renewable Energy

►  River & Coastal and Flood Alleviation

►  Overview

►  Edition

  2014

  2014-2015 Virtual Edition

  2013

  2013-2014 Virtual Edition

  2012

  2012-2013 Virtual Edition

  2011

  2010

  2009

  2008

All Wastewater Treatment & Sewerage Projects

Airdrie Environmental Project

Scottish Water

2012

Loch Ryan WwT Scheme

Scottish Water

2011

Clay Mills STW

Severn Trent Water

2014

Clay Mills STW

Severn Trent Water

2013

Rushmoor STW

Severn Trent Water

2013

Stoke Bardolph STW Centrate Scheme

Severn Trent Water

2014

Stoke Bardolph STW

Severn Trent Water

2013

Wanlip STW - Sludge Project

Severn Trent Water

2014

Budds Farm WwTW

Southern Water

2014

Budds Farm STW - CHP

Southern Water

2008

Basingstoke & Bracknell STWs - NVZ Schemes

Thames Water

2012

Beckton & Crossness STW Schemes

Thames Water

2014

Beckton & Crossness Thermal Hydrolysis Plants

Thames Water

2014

Beckton STW

Thames Water

2013

Beckton STW - Odour Control

Thames Water

2012

Beckton STW - Upgrade

Thames Water

2012

Crossness STW

Thames Water

2013

Crossness STW

Thames Water

2012

Deephams STW

Thames Water

2013

Deephams STW - AMP5/6 Quality Upgrade - Phase 1

Thames Water

2013

Deephams STW - Phosphorous Removal

Thames Water

2012

Deephams WwTW

Thames Water

2011

Ellen’s Green Sewage Pumping Station

Thames Water

2014-15 (V)

Lee Tunnel - TBM Drive & Tunnel Lining

Thames Water

2014

Long Reach STW

Thames Water

2011

Merstham STW

Thames Water

2012

Oxford STW - Thermal Hydrolysis Plant

Thames Water

2013

Blackburn Meadows WwTW - Bio-Energy Digester

Yorkshire Water

2013

Blackburn Meadows WwTW - Bio-Energy Digester

Yorkshire Water

2012-13 (V)

Blackburn Meadows WwTW - FFD Scheme

Yorkshire Water

2012

Bridlington revised Bathing Water Directive Scheme

Yorkshire Water

2014

Calder Vale WwTW

Yorkshire Water

2011

Clifton Rising Main

Yorkshire Water

2014-15 (V)

Cudworth WwTW

Yorkshire Water

2013-14 (V)

Denaby, Mexborough and Burcroft Combined WwT Scheme

Yorkshire Water

2008

Esholt WwTW - Bio-Energy Installation

Yorkshire Water

2013

Esholt STW – Thermal Hydrolysis Plant

Yorkshire Water

2012

FFD Programme – Huddersfield & Spen Valley WwTWs

Yorkshire Water

2010

FFD Programme -  Harrogate South, Naburn & Spen Valley WwTWs

Yorkshire Water

2009

FFD Programme - Knostrop & Neiley WwTWs

Yorkshire Water

2008

Flood Resilience Planning

Yorkshire Water

2013

Hemingborough WwTW

Yorkshire Water

2010

Melbourne WwTW

Yorkshire Water

2009

Monkton Colliery WwTW

Yorkshire Water

2008

Pocklington WwTW

Yorkshire Water

2010

Precast Sewage Pumping Stations

Yorkshire Water

2011

Redacre WwTW

Yorkshire Water

2002

Revised Bathing Water Programme

Yorkshire Water

2011

Scarborough Revised Bathing Water Directive

Yorkshire Water

2013-14 (V)

Scarborough Revised Bathing Water Directive

Yorkshire Water

2012

Seamer & Skirlaugh WwTW

Yorkshire Water

2008

Sutton WwTW

Yorkshire Water

2014

Whitby - Endeavour Wharf Sewer Repair

Yorkshire Water

2011

Woodhouse Mill WwTW

Yorkshire Water

2013

Woodhouse Mill WwTW

Yorkshire Water

2012-13 (V)


Wastewater Treatment Works

Loch Ryan WwT Scheme

Scottish Water

2011

Clay Mills STW

Severn Trent Water

2014

Clay Mills STW

Severn Trent Water

2013

Rushmoor STW

Severn Trent Water

2013

Stoke Bardolph STW Centrate Scheme

Severn Trent Water

2014

Wanlip STW - Sludge Project

Severn Trent Water

2014

Budds Farm WwTW

Southern Water

2014

Beckton & Crossness STW Schemes

Thames Water

2014

Beckton STW

Thames Water

2013

Beckton STW - Odour Control

Thames Water

2012

Beckton STW - Upgrade

Thames Water

2012

Crossness STW

Thames Water

2013

Crossness STW

Thames Water

2012

Deephams STW

Thames Water

2013

Deephams STW - AMP5/6 Quality Upgrade - Phase 1

Thames Water

2013

Deephams STW - Phosphorous Removal

Thames Water

2012

Deephams WwTW

Thames Water

2011

Long Reach STW

Thames Water

2011

Merstham STW

Thames Water

2012

Blackburn Meadows WwTW - FFD Scheme

Yorkshire Water

2012

Bridlington revised Bathing Water Directive Scheme

Yorkshire Water

2014

Calder Vale WwTW

Yorkshire Water

2011

Cudworth WwTW

Yorkshire Water

2013-14 (V)

Denaby, Mexborough and Burcroft Combined WwT Scheme

Yorkshire Water

2008

FFD Programme – Huddersfield & Spen Valley WwTWs

Yorkshire Water

2010

FFD Programme -  Harrogate South, Naburn & Spen Valley WwTWs

Yorkshire Water

2009

FFD Programme - Knostrop & Neiley WwTWs

Yorkshire Water

2008

Hemingborough WwTW

Yorkshire Water

2010

Melbourne WwTW

Yorkshire Water

2009

Monkton Colliery WwTW

Yorkshire Water

2008

Pocklington WwTW

Yorkshire Water

2010

Redacre WwTW

Yorkshire Water

2002

Revised Bathing Water Programme

Yorkshire Water

2011

Scarborough Revised Bathing Water Directive

Yorkshire Water

2013-14 (V)

Scarborough Revised Bathing Water Directive

Yorkshire Water

2012

Seamer & Skirlaugh WwTW

Yorkshire Water

2008

Sutton WwTW

Yorkshire Water

2014

Woodhouse Mill WwTW

Yorkshire Water

2013

Woodhouse Mill WwTW

Yorkshire Water

2012-13 (V)


Sludge Treatment

Clay Mills STW

Severn Trent Water

2014

Stoke Bardolph STW Centrate Scheme

Severn Trent Water

2014

Stoke Bardolph STW

Severn Trent Water

2013

Basingstoke & Bracknell STWs - NVZ Schemes

Thames Water

2012


Sewerage & Flood Alleviation

Airdrie Environmental Project

Scottish Water

2012

Ellen’s Green Sewage Pumping Station

Thames Water

2014-15 (V)

Lee Tunnel - TBM Drive & Tunnel Lining

Thames Water

2014

Clifton Rising Main

Yorkshire Water

2014-15 (V)

Precast Sewage Pumping Stations

Yorkshire Water

2011

Whitby - Endeavour Wharf Sewer Repair

Yorkshire Water

2011


All Water Treatment & Supply Projects

Elsham WTW

Anglian Water

2013

Glencorse WTW

Scottish Water

2010

Church Wilne RGF Media Replacement

Severn Trent Water

2011

Derwent Valley Aqueduct

Severn Trent Water

2011

Mythe WTW Flood Alleviation Scheme

Severn Trent Water

2012

River Ashop and River Noe Silt Issues

Severn Trent Water

2013

Beckton Desalination Plant - Thames Gateway WTW

Thames Water

2010

Acomb Landing WTW

Yorkshire Water

2012

Acomb Landing WTW

Yorkshire Water

2011

Albert WTW

Yorkshire Water

2008

Bullamoor Service Reservoir

Yorkshire Water

2008

Eccup No.1 WTW - Hydroelectric Scheme

Yorkshire Water

2013

Eccup (No.1) WTW

Yorkshire Water

2009

Eccup WTW - Ozone Plant

Yorkshire Water

2009

Ewden & Graincliffe WTWs

Yorkshire Water

2009

Keldgate Critical Service Reservoir

Yorkshire Water

2009

Keldgate WTW

Yorkshire Water

2010

Keldgate WTW

Yorkshire Water

2009

Loftsome Bridge WTW - Wind Energy Scheme

Yorkshire Water

2009

Lower Laithe Reservoir

Yorkshire Water

2012

Marton WTW

Yorkshire Water

2009

Moor Monkton RPS

Yorkshire Water

2009

Riding Wood Reservoir Spillway Improvements

Yorkshire Water

2011

Rivelin WTW

Yorkshire Water

2013

Rivelin WTW

Yorkshire Water

2012

Rodley Fish Pass Scheme

Yorkshire Water

2013

Service Reservoir Bacteriological Remediation Programme

Yorkshire Water

2008

Thornton Steward WTW

Yorkshire Water

2008


Water Treatment Works

Elsham WTW

Anglian Water

2013

Glencorse WTW

Scottish Water

2010

Church Wilne RGF Media Replacement

Severn Trent Water

2011

Beckton Desalination Plant - Thames Gateway WTW

Thames Water

2010

Acomb Landing WTW

Yorkshire Water

2012

Acomb Landing WTW

Yorkshire Water

2011

Albert WTW

Yorkshire Water

2008

Bramley Service Reservoir

Yorkshire Water

2014

Eccup (No.1) WTW

Yorkshire Water

2009

Eccup WTW - Ozone Plant

Yorkshire Water

2009

Ewden & Graincliffe WTWs

Yorkshire Water

2009

Gorple Upper Reservoir Spillway Improvements

Yorkshire Water

2014

Keldgate WTW

Yorkshire Water

2010

Keldgate WTW

Yorkshire Water

2009

Marton WTW

Yorkshire Water

2009

Rivelin WTW

Yorkshire Water

2013

Rivelin WTW

Yorkshire Water

2012

Thornton Steward WTW

Yorkshire Water

2008


Reservoirs & Storage

Bramley Service Reservoir

Yorkshire Water

2014

Bullamoor Service Reservoir

Yorkshire Water

2008

Gorple Upper Reservoir Spillway Improvements

Yorkshire Water

2014

Keldgate Critical Service Reservoir

Yorkshire Water

2009

Lower Laithe Reservoir

Yorkshire Water

2012

Riding Wood Reservoir Spillway Improvements

Yorkshire Water

2011

Service Reservoir Bacteriological Remediation Programme

Yorkshire Water

2008


Pipelines & Pumping Stations

Derwent Valley Aqueduct

Severn Trent Water

2011

River Ashop and River Noe Silt Issues

Severn Trent Water

2013

Moor Monkton RPS

Yorkshire Water

2009

Rodley Fish Pass Scheme

Yorkshire Water

2013


Renewable Energy Projects

Budds Farm STW - CHP

Southern Water

2008

Eccup No.1 WTW - Hydroelectric Scheme

Yorkshire Water

2013

Loftsome Bridge WTW - Wind Energy Scheme

Yorkshire Water

2009

Beckton & Crossness Thermal Hydrolysis Plants

Thames Water

2014

Oxford STW - Thermal Hydrolysis Plant

Thames Water

2013

Blackburn Meadows WwTW - Bio-Energy Digester

Yorkshire Water

2013

Blackburn Meadows WwTW - Bio-Energy Digester

Yorkshire Water

2012-13 (V)

Esholt WwTW - Bio-Energy Installation

Yorkshire Water

2013

Esholt STW – Thermal Hydrolysis Plant

Yorkshire Water

2012


River & Coastal and Flood Alleviation Projects

Mythe WTW Flood Alleviation Scheme

Severn Trent Water

2012

Flood Resilience Planning

Yorkshire Water

2013


UK Water Projects - 2014 Edition

Clay Mills STW

Severn Trent Water

2014

Stoke Bardolph STW Centrate Scheme

Severn Trent Water

2014

Wanlip STW - Sludge Project

Severn Trent Water

2014

Budds Farm WwTW

Southern Water

2014

Beckton & Crossness STW Schemes

Thames Water

2014

Beckton & Crossness Thermal Hydrolysis Plants

Thames Water

2014

Lee Tunnel - TBM Drive & Tunnel Lining

Thames Water

2014

Bramley Service Reservoir

Yorkshire Water

2014

Bridlington revised Bathing Water Directive Scheme

Yorkshire Water

2014

Gorple Upper Reservoir Spillway Improvements

Yorkshire Water

2014

Sutton WwTW

Yorkshire Water

2014


UK Water Projects - 2014-2015 Virtual Edition

Ellen’s Green Sewage Pumping Station

Thames Water

2014-15 (V)

Clifton Rising Main

Yorkshire Water

2014-15 (V)


UK Water Projects - 2013 Edition

Elsham WTW

Anglian Water

2013

River Ashop and River Noe Silt Issues

Severn Trent Water

2013

Eccup No.1 WTW - Hydroelectric Scheme

Yorkshire Water

2013

Rivelin WTW

Yorkshire Water

2013

Rodley Fish Pass Scheme

Yorkshire Water

2013


UK Water Projects - 2012 Edition

Mythe WTW Flood Alleviation Scheme

Severn Trent Water

2012

Acomb Landing WTW

Yorkshire Water

2012

Lower Laithe Reservoir

Yorkshire Water

2012

Rivelin WTW

Yorkshire Water

2012


UK Water Projects - 2011 Edition

Church Wilne RGF Media Replacement

Severn Trent Water

2011

Derwent Valley Aqueduct

Severn Trent Water

2011

Acomb Landing WTW

Yorkshire Water

2011

Riding Wood Reservoir Spillway Improvements

Yorkshire Water

2011


UK Water Projects - 2010 Edition

Glencorse WTW

Scottish Water

2010

Beckton Desalination Plant - Thames Gateway WTW

Thames Water

2010

Keldgate WTW

Yorkshire Water

2010


UK Water Projects - 2009 Edition

Eccup (No.1) WTW

Yorkshire Water

2009

Eccup WTW - Ozone Plant

Yorkshire Water

2009

Ewden & Graincliffe WTWs

Yorkshire Water

2009

Keldgate Critical Service Reservoir

Yorkshire Water

2009

Keldgate WTW

Yorkshire Water

2009

Loftsome Bridge WTW - Wind Energy Scheme

Yorkshire Water

2009

Marton WTW

Yorkshire Water

2009

Moor Monkton RPS

Yorkshire Water

2009


UK Water Projects - 2008 Edition

Albert WTW

Yorkshire Water

2008

Bullamoor Service Reservoir

Yorkshire Water

2008

Service Reservoir Bacteriological Remediation Programme

Yorkshire Water

2008

Thornton Steward WTW

Yorkshire Water

2008

UK Water Projects Online

▲ TOP ▲

UK Water Projects Online