Hollym, Myers Lane, WwTW (2021)
Constructed in 1991, the existing Withernsea Sewage Treatment Works (STW) lies 2km south of the East Yorkshire coastal resort town of Withernsea and was built circa 180m from the cliff edge with an expected asset life in excess of 60 years. Since 1998, coastal erosion rates in the area have increased significantly from historic levels, […]