Van Voskuilen Woudenberg B.V. has recently completed a mains renewal project for Vitens, The Netherlands, with the help of Steve Vick International (SVI) equipment
Wessex Water Services Ltd has used the Steve Vick International (SVI) Hexi Trailer to insert 800m of new PE pipe into an old cast iron main, saving time, money and disruption to road users.
Installation of fish exclusion intake screen compliant with the Eels Regulations
Installation of a surface water drainage system to alleviate the flooding at Beaumaris Castle
Turbine generator installation at Kartepe in Kocaeli Province, Turkey
Amiblu’s Flowtite filament wound pipes provide capacity to withstand high internal pressures and maintain excellent long-term stiffness, corrosion and abrasion resistance
Scottish Water deploy SoundPrint® Acoustic Fibre Optic System to extend the asset life of a strategic water mains4e3r
Glanua was contracted by Uisce Eireann (Irish Water) to design and build a new Wastewater Treatment Plant (WWTP) under the Early Contractor Involvement (ECI) programme.
KEE Process design upgrade solution for Anglian Water using NuDisc® technology
Single jet Pelton renewable energy generation
Hydro International’s UK Wastewater Services, M&N, cuts OPEX costs and carbon footprint
College Avenue WTW supports the Maidenhead water supply infrastructure. It is a strategically important production site and must run constantly and without outages to supply several thousand customers
Design and support for a hydro power house and turbine chamber in centre of Derby
KEE uses ‘Fixed Film’ technology to meet Northern Ireland Waters’ discharge standards at Derrylin
TSL Ltd utilise the slide rail temporary works shoring system from National Trench Safety to achieve rapid progress on the groundworks and civils package
Structural strengthening of culvert using glassfiber reinforced plastic (GRP) non-circular pipe systems
Wastewater pumping solution for industrial lorry park – Dutypoint Ltd deliver outstanding solutions
Yorkshire Water secures cost savings, pollution reduction, energy use reduction and carbon reduction at problematic pumping station site
Aeration & IFAS installation
When United Utilities needed to increase the throughput of Franklaw Water Treatment Works in Lancashire they considered energy recovery as part of the overall design. Water is abstracted from the Thirlmere Aqueduct and conducted to the site through underground pipes. The water treatment process required that downstream of the energy recovery plant there should be […]
Installing soil nails
KEE Process design and manufacture extended NuDisc® 2000 RBC Installation for Spanish village
Steve Vick International’s Contract Service team gifted their time and resources to assist The Friends of Gedling Country Park on an overspill tank installation project
Structural rehabilitation of man-entry GRP culvert relining project
Gilkes twin Jet Turgo for energy recovery from pressurised water systems
Mecana pile cloth media filtration Installation – largest 2-stage Mecana installation in the world
FLI Precast Solutions construct blending chamber and PFET for Welsh Water
MNSS combined screen protects a Thames Water treatment works from rag carry over
SAVECO Environmental are supplying 3 (No.) 57m travelling bridges to Laing O’Rourke for the Beckton STW inlet works grit removal plant
Sulzer supports Ross-shire Engineering Ltd in the delivery of the new filtration standards
LDPE PF Detect leak detectable dual contained hose
LDPE Protectaflex dual contained hose
Replacement and reinforcement of Harrogate’s water supply infrastructure
KEE Process design a single piece plant to meet Severn Trent’s extremely stringent requirements in Hassop
FT Pipeline Systems supplied steel pipes with a 3-layer PE external coating and DWI approved internal coating to MMB and United Utilities for the Hallbank Tunnel Replacement Project
Installation of self-cleaning screens which met the EA screening requirements and allow the hydropower system to operate at higher outputs
Providing support for the installation of a new foul pumping chamber tank in Jersey
Inverlael Hydroelectric Scheme in Wester Ross, Scotland
KEE Process collaborate with Northern Ireland Water on a £5m investment to construct one of the largest RBC sites in Europe
Keltie Water Hydro Scheme at Trossachs National Park, Scotland
Project demonstrating the benefits of combining modern hydropower technology with a GoFlo self-cleaning water intake screen.
A South East Water fresh water reservoir near Sittingbourne in Kent was in need of some repairs to resolve water ingress and extend the life of the structure.
A temporary works solution for major sewer upgrades in Auckland, New Zealand
Upgrade the Water Supply GRID for Bridgewater with a challenging design
Combined Terminodour™ & Regenerative Thermal Oxidiser odour control system in Malta
Installation of new Triton® aeration and mixing units from KEE Process to reduce the carbon footprint and improve plant performance
RPVC & PTFE Protectaflex
Installing sheet piles for sewer and water system upgrade
Installing steel sheet piles for sewer and water system upgrade
Terminodour™ Odour Control System in the Kingdom of Saudi Arabia
Glanua undertake two projects to upgrade Affinity Water’s treatment infrastructure in Northmoor and Amersham to address risks from HS2 construction affecting the chalk aquifer
Phosphorus removal solution for a water utilities company – QuadraTANK™ helps enhance water quality
Ardverikie Estate, Loch Laggan, Scotland
Resilient stormwater management
RAF base equipped with Scotland’s largest Weholite wastewater storage tank
PBJ Engineering undertook a pivotal 3-month design & install project for a state-of-the-art reverse osmosis system in Greater London
A three-year project to provide National Grid with a 5km long, 3.65m diameter tunnel bored 30m under the river bed
Twin Jet Turgo installation at the Loch Lomond Water Supply scheme
Eel Regulations compliance by upgrading the intake with a maximum bar-spacing on the intake of 2mm and water velocity at the screen not exceeding 0.25m/s
LDPE PF detect leak detectable dual contained hose
Stank Burn Hydro Scheme located in Loch Lomond, Scotland
Sheet piled cofferdam for the Birmingham Resilience Project
Xypex was used the western section of the tunnel and as the sole waterproofer for the Hammersmith Connection Tunnel. The Western Section runs from Acton to Carnworth Road in Fulham.
Flooding from rivers, surface water, high tides and groundwater can all affect water company treatment works and pumping stations, with flood waters impacting on their operation and at times stopping them completely.
Terminodour™ and Kombi Skrub odour control system
Turbine generator installed at Wainuiomata WTW, New Zealand
Upgrade of exisiting plant and turbine generator for the Farmers Irrigation District, Oregon, USA
The first Mecana installation in Severn Trent to treat Nereda discharge
A water turbine and pump solution at SiBo Sanitation Works, Kenya, that delivers clean water utilising the energy available within the existing local river
Specialist welding solutions
KEE Process design and manufacture a gravity NuDisc® wastewater treatment plant to replace a decades old treatment system