Featured Projects 2025
The following are the projects nominated to date by the water companies and their project delivery framework partners for inclusion as technical case studies in Water Projects 2024 and/or WaterProjectsOnline.
Whilst all the above have been nominated, we cannot guarantee that the case studies will be submitted in time for the 2024 print edition.

- Sundon Water Treatment Facility

- Cotton Valley WRC
- Grays Sewer Rehabilitation
- Ise Valley Sewer Rehabilitation
- Sleaford WRC - Reed Bed
- Toplers Hill Water Tower

- Harthill Reservoir

- Cardiff & Afan WwTWs CHP Optimisation
- Eign & Rotherwas Phosphorus Removal
- Leominster Phosphorus Removal
- Llyn Celyn Valve Replacement
- Llyn y Fan Fach Reservoir
- Queensferry WwTW Inlet Works & FE Washwater
- Sluvad WTW Manganese Removal

- Campbeltown Flood Alleviation (Argyll & Bute)
- Colwick (Holme Sluice) Fish Pass
- Don Regulators
- Dovecliff Weir
- Holderness FAS - East Hull Pumping Station
- Keadby Terminal Assisted Outfall
- Porthcawl Coastal Scheme (Bridgend CC)
- River Thames Scheme

- Layer to Langford Pipeline

- Ammanford Flood Scheme

- Ballyronan WwTW
- Crescent Link Trunk Main
- Derrychrin WwTW
- Dunore Point Energy Storage
- Lower Woodburn WwPS
- Ravenhill Avenue Flood Alleviation Project
- Stiles Way Trunk Main

- Durham Transfer
- Hexham STW
- Kelloe STW
- Mosswood Run to Waste
- Project Pipeline: County Durham and Tees Valley (Phase 1)
- Springwell Reservoir
- Turnstall Reservoir
- Wark STW
- West Hallington Reservoir

- Argyll SCADA Project
- Bertha Park WwTW
- Bonnycraig (Peebles) WTW
- Borders Cluster
- Braidholm Road Sewer Flood Prevention
- Clatto WTW
- Dunside Reservoir
- Eela Water WTW Ceramic Membrane Plant
- Giffnock Sewer Flooding (Braidholm Road)
- Herricks WTW
- Kerse Clean Water Storage Tank
- Lintrathen WTW
- Loch Katrine Emergency Spillway Repair Works
- Mannofield WTW - UV Disinfection
- Marchmont Road Stormwater Storage
- Saltcoats Rising Main
- Sanday Sludge Treatment

- Hamilton STW Hydro Turbine Project
- Whiteadder Reservoir Hydroelectric Scheme

- Haxey Graizelound STW
- Lower Gornal STW
- Melton Mowbray STW
- Monkmoor STW
- Newthorpe STW
- Roundhill STW
- Streelley to Redhill Pipeline
- Stroud Sewerage Strategy
- Ultraviolet Disinfection Batch
- Witches Oak WTW - Main Works
- Witches Oak WTW - Raw Water Pumping Station

- Alderney WTW
- Event Duration Monitoring
- Exmouth Outfall
- Galmpton Bathing Waters Scheme
- Hawkchurch Storm Tank
- Inlet Enhancement Scheme
- Lamerton P Removal
- Northbridge Eel Screens
- Offwell Storm Tank
- Wilmington P Removal

- Horsham WwTW
- Lingfield WwTW
- Planned Maintenance Project
- Southampton Shellfish Scheme

- East Shefford STW
- Greenwich Pumping Station
- Guildford STW
- Hampton WTW SSF Project
- Tideway Central: Albert & Chelsea Embankment River Walls
- Tideway Central: Albert & Chelsea Riverside Embankments
- Tideway Central: Blackfriars, Victoria & Albert River Walls
- Tideway Central: Commissioning
- Tideway Central: Heathwall Pumping Station
- Tideway Central: Urban Realms
- Tideway Central: Victoria Embankment Foreshore (Tideway)
- WINEP CSO Investigations
- WINEP Urban Pollution Management Studies
- Woodford 50 Mains Rehabilitation

- Arklow WwTP
- Athlone Main Drainage Scheme
- Ballina & Newport WwTP
- Boherbue WwTP
- Tullow WwTP

- Burnley STW
- Bury STW
- Carlisle STW
- Chipping STW
- Chorley STW Wetlands
- Forton Pipeline & STW
- Kendal Outfall
- Macclesfield STW - Nuvoda Mobile Organic Biofilm (MOB) Plant
- Oswestry WTW
- Vyrnwy Aqueduct Modernisation Programme
- West East Link Main (WELM) 150

- Groundwater Impacted Storm Overflows (Nature based Solution)
- Yeovil Pen Mill STW

- Blackburn Meadows STW
- Embsay WTW
- Esholt STW
- Gouthwaite Reservoir Siphons
- Knostrop STW
- P Removal Project Portfolio (Thorne STW | Aldwarke STW | Lundwood STW | Castleford STW)
- Red Doles CSO
- Stockton Lane (York) Clean Water Lining