Hallaton Water Recycling Centre (WRC) is a small rural treatment works located south of Hallaton village in Leicestershire, which plays an important role in treating wastewater from the local community before safely returning treated water to the environment. Accurate flow measurement helps operators better understand site performance, providing valuable data to support efficient wastewater treatment and environmental stewardship. As part of Anglian Water’s AMP8 investment programme, the @one Alliance has delivered a £650,000 improvement scheme to enhance flow monitoring and upgrade return-flow management across the site. The project is part of a wider programme of around 60 schemes being delivered across the Anglian Water region, helping to improve environmental monitoring, strengthen operational resilience, and support the protection of local rivers and watercourses.

The issue

As environmental expectations continue to evolve, water companies are investing in improved monitoring systems that provide greater visibility into how treatment works operate and perform.

At Hallaton WRC, enhancements were required to strengthen the site’s flow monitoring capability and align with the latest Environment Agency guidance on Flow to Full Treatment (FFT). The improvements would help ensure wastewater flows entering the treatment process could be measured and reported as accurately as possible, supporting environmental compliance, operational decision-making, and long-term asset performance.

Modifications to the new flume - Courtesy of @one Alliance

Modifications to the new flume – Courtesy of @one Alliance

Challenges

Delivering these improvements posed several engineering challenges due to a compact site with confined working areas, existing underground services requiring careful planning and coordination, and site access restricted by a narrow entrance.

As all works were undertaken within a live operational treatment facility, maintaining uninterrupted service for customers and safeguarding treatment performance throughout construction remained a key priority.

The solution

Recognising the importance of accurate flow measurement and long-term resilience, Anglian Water commissioned the @one Alliance to develop and deliver a solution that would enhance monitoring capability, improve flow measurement accuracy, and provide greater visibility of site performance.

At the heart of the project is a new flow measurement system installed within the site’s inlet works. This system provides accurate monitoring of the flow rate and volume of wastewater arriving for treatment, giving operational teams improved insight into site performance and supporting environmental reporting requirements.

(left) New flow measurement technology, and (right) modern telemetry equipment delivers real-time operational insights from across the site - Courtesy of @one Alliance

(left) New flow measurement technology, and (right) modern telemetry equipment delivers real-time operational insights from across the site – Courtesy of @one Alliance

In addition to the new monitoring equipment, the site’s return flow arrangements were upgraded. A new sludge return pump skid and associated pipework were installed, together with control systems to manage flows effectively throughout the treatment process and to improve the accuracy of monitoring data.

Overall, the key improvements included:

  • Installation of a new flow measurement flume within the inlet works.
  • Installation of a new storm weir.
  • Installation of a modern ultrasonic flow monitoring system.
  • Installation of a new pump skid and associated mechanical equipment.
  • Approximately 120m of new pipework was installed to divert site return flows downstream of the new flow monitor.
  • Approximately 100m of cable ducts, cable trays and associated electrical infrastructure were installed.
  • New instrumentation and control equipment.
  • Installation of new local control panels and telemetry equipment.
  • Pipework insulation and frost protection measures.
  • Modifications to existing Final Effluent pipework to support the new configuration.

Careful planning ensured that the treatment works remained fully operational throughout construction. Temporary pumping arrangements were implemented during work in live process areas, ensuring wastewater continued to be treated without interruption.

Close collaboration between civil, mechanical and electrical teams enabled the project to be delivered safely within the site’s constrained footprint. Wherever possible, prefabricated components were used to improve efficiency, shorten programme durations and minimise disruption.

The nearly completed new pump skid - Courtesy of @one Alliance

The nearly completed new pump skid – Courtesy of @one Alliance

Hallaton WRC: Supply chain – key participants

  • Client: Anglian Water
  • Project delivery: @one Alliance
  • Principal contractor: Skanska
  • Core drilling: SCS UK Ltd
  • Civil engineering works: DLO
  • Electrical installation: Dodd Group
  • Trace heating & lagging installation: McLatchie Insulations
  • Temporary weir box, steelwork & modifications to FE discharge pipework: March Engineering
  • Asbestos survey & removal: Oracle Solutions
  • Pump skid & weir board supply: Waveney Pumps Ltd
  • Gorman Rupp pump supply: Hydromarque
  • Valves: AVK UK Ltd
  • Pipework: Saint Gobain PAM UK
  • Flume supply: SIRIS Environmental
  • Control panels & electrical: Paktronic Engineering Co. Ltd
  • Instrumentation: Pulsar Measurement
  • Instrumentation: VEGA Controls Ltd

Benefits

The Hallaton scheme delivers long-term benefits for both the environment and the communities served by the site.

The new flow measurement system provides Anglian Water with a more accurate understanding of flows entering treatment, supporting operational decision-making, regulatory reporting and asset management. The upgraded return flow arrangements further enhance process control, helping maintain high standards of treatment performance.

Upgraded return flow infrastructure to improve process control and monitoring accuracy across the site - Courtesy of @one Alliance

Upgraded return flow infrastructure to improve process control and monitoring accuracy across the site – Courtesy of @one Alliance

With modern infrastructure now in place, Hallaton WRC is better positioned to meet future operational requirements while continuing to protect local watercourses and serve the surrounding community.

The scheme also improved the management of site return flows by relocating them downstream of the new FFT flow meter. This ensures return flows are not double-counted, remain within the treatment process, supporting more accurate monitoring, improved operational performance, and enhanced environmental protection.

Environmental protection remained a key consideration during the project’s delivery, and strict controls were maintained to safeguard local watercourses and support reliable treatment performance during construction.

Conclusion

The Hallaton UMON4 Flow Measurement Scheme forms part of Anglian Water’s wider programme of investment in monitoring and process performance across its wastewater asset base. Delivered within the constraints of a live treatment works, the project successfully upgraded flow measurement infrastructure while maintaining continuous operation of the site.

The completed scheme provides a more robust basis for understanding hydraulic performance, supporting both day-to-day operational management and longer-term planning. By improving data quality and strengthening monitoring capability, Hallaton WRC is now better equipped to meet future regulatory requirements while continuing to provide reliable wastewater treatment for the local community.

Hallaton WRC U_MON4 Flow Measurement Scheme

The editor and publishers would like to thank Anglian Water’s @one Alliance for providing the above article for publication. The @one Alliance is a collaboration of eight partner companies that each provide specialist knowledge, allowing the Alliance to deliver complex delivery projects in the most efficient way, reducing the cost to Anglian Water’s customers. The partners are Anglian Water Asset Delivery, Balfour Beatty, Barhale, Binnies, Mott MacDonald Bentley, MWH Treatment, Skanska and Sweco.