Search
Nominate/Submit Case Studies
Job Board
Battersea Shaft Pumping Station (2020)
Keele University Water Management Plan (2020)
Smart Flushing (2020)
Billericay, Danbury & Hollingsworth Road Water Towers (2020)
Water Supply GRID – Conclusion (2019)
Thames Water AMP6 Pressure Management Programme (2019)
Advanced Pressure Management (2013)
(top left) the existing Canklow regulator gate (bottom left) 3D model of the new Canklow Regulator and (right) bathymetry of Woodhouse Mill Washland - Courtesy of JBA-Bentley
Pressure Management Design (2009)
Tall Building Database (2007)
Severn Trent DG2 Small Pumps Project (2017)
Water Supply GRID – Optimiser System (2016)