Aarsleff Ground Engineering Ltd

Newark Waste and Water Improvement Project – Shaft 26

Installing steel sheet piles for sewer and water system upgrade

Courtesy of Aarsleff Ground Engineering Ltd

Severn Trent is investing £60 million to upgrade Newark’s sewerage and water system to help protect homes from sewer flooding. The scheme will provide a reliable water source for decades to come. In 2016, Nick Wallace from Severn Trent explained that more than 12 miles of old piles will be replaced with new, larger ones.

In May 2017, Aarsleff worked on Queens Road in Newark, to facilitate the replacement of a tunnel with one at 1.5m diameter. Here, 28 (No.) sheet piles were installed.

As part of the same scheme, and for the same client, Aarsleff was awarded the contract to construct a sheet piled cofferdam on Harcourt Street. Aarsleff installed 46 (No.) sacrificial steel sheet piles, with pile width 600mm and 12.0m in length. There was a retained height of 10.2m, forming the overall cofferdam. Again, Aarsleff’s work will facilitate the replacement of an old water course.

Courtesy of Aarsleff Ground Engineering Ltd

Courtesy of Aarsleff Ground Engineering Ltd

As Aarsleff was piling in the middle of a residential street, it drove the sheet piles using an ABI leader rig with pre-augering taking place in advance of main works where it utilised a Silent Hydro pile press to reduce the noise and vibration. A 50-tonne capacity crawler crane was employed, operating at a maximum 6m radius to unload and handle piles and hammer.

Aarsleff’s Senior Technical Estimator Ashley Carter said:

“It is a great endorsement of Aarsleff’s work that we have been awarded our second contract for the same scheme in Newark, just 7 months later. There are around 400 homes in Newark that are currently at risk of flooding, demonstrating just how important sheet piling projects like this are in future-proofing our infrastructure and communities.”

Courtesy of Aarsleff Ground Engineering Ltd

Courtesy of Aarsleff Ground Engineering Ltd

  • Scope of works
    • 46 (No.) steel sheet piles
    • Pre-auger
  • Equipment
    • ABI rig
    • Silent hydro pile press
  • Contractor
    • BNM Alliance (an nmcn PLC and Barhale joint venture)
  • Construction period
    • 11th December 2017 – 20th February 2018

 


For more information: Aarsleff Ground Engineering: +44 (0)1636 611140 | www.aarsleff.co.uk