Search
Water Companies
Water & Wastewater
Water Supply Only
Flood Protection & Alleviation
Other
Case Studies
Wastewater Treatment & Sewerage
Water Treatment & Supply
Flood Alleviation
Renewable Energy
River Work
Energy Management
Industrial
Innovations
Process Plant & Equipment
Process Technologies
Smart Systems/Optimisation
Supply Chain
Civil Engineering
Consultants
Plant & Equipment
Process Engineering
Digital Flipbooks
Jobs Board
Civil Engineering
MEICA
Process/Chemical
Water Resources
Mini Case Studies
Company News
Login
Sign In
Sign Up
Nominate/Submit Case Studies
Become a Featured Company
Job Board
Case Study Category:
River Work
Ammanford Flood Risk Management (2024)
Northbridge Eel Regulations Compliance Project (2024)
Holme Sluice Fish Pass Phase 2 (2024)
Don Regulators (2023)
Niagara Weir Stabilisation & Fish Pass (2023)
Llyn Bran Discontinuance (2023)
Matchams Riverbank Stabilisation (2022)
Hampton Loade WTW – Eel Screens (2022)
Southern Water Eel Screens Programme – Construction (2022)
Holme Sluice Fish Pass (2022)
Severn Trent Eels Regulation Compliance (2021)
Cownwy & Marchnant WFD Project (2021)
Belaugh & Waveney Raw Water Intakes (2021)
River Itchen Eel Screens Project (2021)
Lobwood Fish Pass (2020)
Tophill Low Fish Pass (2020)
Loch Venachar Fish Pass (2020)
Southern Water Eel Screens Programme – Design (2020)
Woodhall Park River Restoration (2020)
Hedges Farm River Restoration Project (2020)
Hazards Green WTW – Eel Screens (2019)
Jordans Dam and Wharncliffe Fish Passes (2019)
Blythe & Bourne Fish Passage (2019)
Manor Road Park River Restoration Project (2019)
Brantham Pumping Station (2019)
Battlefield Brook Fish Passage (2019)
Loftsome Bridge WTW – Intake (2019)
Rodley Fish Pass Scheme (2013)
Mid River Colne & Lakes (2015)
River Medway Canoe Trail (2010)
West Thames Navigation Projects (2008)
Heathrow T5 River Diversion (2007)
Glan Usk River Work (2006)
Lumley Raw Water Pumping Station (2018)
Thames Water UPM Scoping Studies (2018)
Protecting Water Voles (2017)
Walton Eel Screens (2017)