Search
Water Companies
Water & Wastewater
Water Supply Only
Flood Protection & Alleviation
Other
Case Studies
Wastewater Treatment & Sewerage
Water Treatment & Supply
Flood Alleviation
Renewable Energy
River Work
Energy Management
Industrial
Innovations
Process Plant & Equipment
Process Technologies
Smart Systems/Optimisation
Supply Chain
Civil Engineering
Consultants
Plant & Equipment
Process Engineering
Digital Flipbooks
Jobs Board
Civil Engineering
MEICA
Process/Chemical
Water Resources
Mini Case Studies
Company News
Login
Sign In
Sign Up
Nominate/Submit Case Studies
Become a Featured Company
Job Board
Case Study Category:
Thermal Hydrolysis
Goddards Green WwTW (2023)
Finham Advanced Anaerobic Digestion (2023)
Stoke Bardolph STW – Anaerobic Digestion (2022)
Strongford STW – THP & LTP (2022)
Cog Moors Advanced Anaerobic Digestion Facility (2021)
Esholt WwTW – Bio-Energy Installation (2013)
Oxford STW – Thermal Hydrolysis Plant (2013)
Oxford STW – Sludge Stream Upgrade (2014)
Colchester Advanced Digestion Project (2014)
Beckton & Crossness THPs (2014)
Esholt STW – Thermal Hydrolysis Plant (2012)
Cardiff & Afan AAD Plants (2011)
Whitlingham & Great Billing Sludge Treatment Centres (2010)
Bran Sands RSTC Advanced Digestion (2009)
Aberdeen Nigg STC (2002)
Minworth STW – Thermal Hydrolysis Plant (2018)
North Wales Sludge Strategy & Five Fords AAD (2018)
Basingstoke Sludge Treatment Centre (2017)
Minworth STW – Thermal Hydrolysis Plant (2017)
Five Fords WwTW (2016)