Search
Water Companies
Water & Wastewater
Water Supply Only
Flood Protection & Alleviation
Other
Case Studies
Wastewater Treatment & Sewerage
Water Treatment & Supply
Flood Alleviation
Renewable Energy
River Work
Energy Management
Industrial
Innovations
Asset Maintenance & Rehabilitation
Process Plant & Equipment
Process Technologies
Smart Systems/Optimisation
Supply Chain
Digital Flipbooks
Jobs Board
Mini Case Studies
Company News
Login
Sign In
Sign Up
Nominate/Submit Case Studies
Become a Featured Company
Job Board
Mini Case Study Category:
Sewers
Kendal Wastewater Treatment Works (WwTW)
Guildford Sewage Treatment Works
Strategic Transfer Sewer Tunnelling – Paisley, Renfrewshire
Sheet Piled Trench and Concrete Culvert – Paradise Street, Liverpool
Sewer Diversion for the Metrolink Second City Crossing – Manchester
River Bank Stabilisation and Sewer Reconstruction – Courtaulds, Preston
River Bank Stabilisation and Pipebridge Replacement – Bridge Farm, Wilmslow
Precast Concrete Culvert Installation – Brooks Lane, Middlewich
Live Sewer Diversion for the Mersey Gateway – Waterloo Road, Widnes
Hospital Sewer Connection – The Spire, Didsbury
Detention Tank, Pumping Station and CSO – Cookesmere Lane, Sandbach
CSO Chambers and Detention Tank – Aqueduct Road and Bolton Road, Blackburn
Caisson Shaft and Sewer Replacement – Upperpassmonds Road, Rochdale
Back Alley Sewer Replacement – Alwyn Street, Liverpool
2300mm Sewer Diversion for the Mersey Gateway – Ditton Road, Widnes
Retainer-Rock® Supports £10m Upgrade at Dronfield Wastewater Treatment Works
Westminster Road, Macclesfield
Morfa Culvert
Liverpool Waters, Stanley Dock – Civil Engineering Projects, Liverpool
New Victoria – Segmental Shaft Sinking, Manchester
Chester Northgate Tunnelling – Chester City Centre
Medlock CSO Screening
St Andrews Landslip Remediation (2025)
Advanced Sewer Profiling & Coordination
Gipsy Patch Lane (Bristol) Sewer Rehabilitation
Preston WwTW