Ballykelly WwTW (2022)
Built in the 1970s, Ballykelly WwTW was designed to serve a population of just under 8,000. However, the closure of the nearby army barracks in 2008 meant the population was halved to around 3,600, leaving the works both biologically and hydraulically oversized. A hybrid solution, comprising conventional and natural wastewater treatment processes, was designed for […]