Search
Nominate/Submit Case Studies
Job Board
Bristol Redland CSO (2004)
Bradford UID Improvement Scheme (2004)
(top left) the existing Canklow regulator gate (bottom left) 3D model of the new Canklow Regulator and (right) bathymetry of Woodhouse Mill Washland - Courtesy of JBA-Bentley
Barnstaple & Bideford CSOs (2004)
Yorkshire Water West Area CSO Programme (2003)
Plymouth WWT Scheme (2003)
CSO Programme (2003)
Llandudno Sewage Flooding Prevention Scheme (2003)
Foord Valley (Folkestone) Flood Alleviation Scheme (2003)
Esk Valley CSOs (2003)
Bath CSOs (2003)
Falmouth CSO Improvements (2002)
Colwyn Bay CSO Improvement Scheme (2002)
Garnswllt WwTW (2002)
Blackpool South Surface Water Strategy (2018)
Morecambe WwTW Catchment Strategy: Part 1 (2018)
Station Road (Queensbury) Sewer Flooding (2018)
Swinstie Pipe Bridge Replacement (2018)
Galgorm Wastewater Pumping Station Upgrade (2018)
Preston WwTW (2018)
South West Water Shellfish Waters NEP AMP6 Programme (2018)
Royton WwTW (2018)
Nine Elms, Battersea Growth & SuDS (2018)
Frome Valley Relief Sewer (2018)
Hagley (Newfield Road) Flood Alleviation (2018)
Pebworth-Long Marston-Stratford upon Avon Transfer (2018)
Killingworth & Longbenton Water Management (2018)
Tideway Central – Overview (2018)
Cambrian RainScape (2017)
Linnet Rise Flood Alleviation scheme (2017)
Heanor Breach Road Flood Alleviation Scheme (2017)
Foreness Point Intertidal Habitat Enhancement Plan (2017)
Tideway Central – Vessel Relocation (2017)
Whitburn Spill Reduction (2017)
Tideway East – Challenges (2016)
SAL 172 Stormwater Storage: Part 2 (2016)
Garendon Green (Loughborough) Flood Alleviation (2016)
Salcombe Sewer Flood Alleviation (2016)
Kelham Road (Newark) Flood Alleviation Scheme (2016)
Fellgate Surface Water Management (2016)
Swalecliffe Habitat Resilience Plan (2016)
Elmvale Row Sewer Flooding Prevention Scheme (2016)
Fleetwood WwTW Stormwater Storage (2015)
Lee Tunnel – Introduction (2011)