Pipex px
Pipex px® are leaders in the off-site build of civil engineered chambers supplied with optional factory fitted rebar reinforcement. Manufactured from advanced thermoplastic materials, Pipex px® chambers are corrosion resistant, fully sealed, fluid and gas tight - the alternative solution to concrete and brick construction.
Our chambers are available in circular or rectangular modular systems for fast track installations in urban areas limiting the need for traffic management and where complex designs prove difficult for traditional build methods. Larger chambers can be supplied in sections for site assembly.
We have a long history working closely with all the UK’s principal water companies, providing fit-for-purpose solutions for modern day construction challenges, these include: Civil engineered chambers, valve chambers, pumping stations, air valve chambers, wash out chambers and manholes. 3D modelling is also available and is not limited to our own product range – we can meet your project requirements, with support for your BIM requirements.
![](https://waterprojectsonline.com/wp-content/uploads/article_photos/2017/2017_thermoplastics_01.jpg)
![](https://waterprojectsonline.com/wp-content/uploads/article_photos/2017/2017_thermoplastics_05.jpg)
![](https://waterprojectsonline.com/wp-content/uploads/article_photos/2017/2017_thermoplastics_03.jpg)
![](https://waterprojectsonline.com/wp-content/uploads/article_photos/2017/2017_thermoplastics_02.jpg)
![](https://waterprojectsonline.com/wp-content/uploads/article_photos/2017/2017_sww_marsh_mills_01-2.jpg)
Marsh Mills WwTW (2017)
South West Water (SWW) has an ODI target to supply 20% of its energy from renewable sources by 2020. This translates to a volume target of 50GWh renewable output within the final year of K6. This project will contribute 9.4GWh towards this 50GWh target by 2020 by optimising six sludge treatment centres (STCs), which operate […]
Renewable Energy
Wastewater Treatment and Sewerage