Search
Water Companies
Water & Wastewater
Water Supply Only
Flood Protection & Alleviation
Other
Case Studies
Wastewater Treatment & Sewerage
Water Treatment & Supply
Flood Alleviation
Renewable Energy
River Work
Energy Management
Industrial
Innovations
Asset Maintenance & Rehabilitation
Process Plant & Equipment
Process Technologies
Smart Systems/Optimisation
Supply Chain
Digital Flipbooks
Jobs Board
Mini Case Studies
Company News
Login
Sign In
Sign Up
Nominate/Submit Case Studies
Become a Featured Company
Job Board
Mini Case Study Category:
Temporary Works & Shoring
Temporary Works Solution Witches Oak Water River Intake Upgrade
Walton Le Dale Wastewater Treatment Works
MGF assists with upgrades to Mile Oak Sewage Treatment Works
Supporting the Construction of a Flow Control Structure
MGF Wall Bridge supports latest AMP7 project
Providing support for the installation of a in situ RC tank in Didcot
Rising Main Replacement with GRiPSHORE
New Victoria – Segmental Shaft Sinking, Manchester
The Airfields, Deeside
Fujiclean Tank Installation – South Cheshire
Double Slide Rail Installation at SmartParc Development, Derby
River Humber Pipeline Replacement
Major Supply Grid Upgrades, Somerset
Major Sewer Upgrades in New Zealand
Installation of New Foul Pumping Station in Jersey
Derby Hydro Power House
Alleviating Flooding at Beaumaris Castle