Purestream Process Solutions
Frampton on Severn WwTW
Two LS15 lamella settlement tanks supplied by Purestream Process Solutions
Frampton on Severn Sewage Treatment Works serves a local population of approximately 1,500 residents. Following ongoing performance challenges at the site, Severn Trent Water engaged Purestream Process Solutions to deliver a treatment solution that improves effluent quality while maintaining environmental compliance.
The project required integrating new treatment equipment into the existing process stream, including installing desludge pumping arrangements and associated electrical infrastructure. Careful planning was essential to ensure that pipework routes maintained operational access across the site while eliminating potential health and safety risks. In addition, the solution needed to provide flexibility for potential future adoption beyond an initial 12-week hire period.
Solution
To meet these requirements, Purestream supplied and installed two LS15 lamella settlement tanks to enhance solids separation and improve overall treatment performance. The package also included two desludge pumps integrated into the live process stream, along with all associated effluent and sludge pipework. Full mechanical and electrical installation works were undertaken to provide a complete turnkey solution.
Outcomes
All equipment was supplied and installed within the client’s required programme and budget. The upgraded treatment process delivers improved solids removal and enhanced treatment efficiency, providing a reliable, robust solution that supports continued site compliance and operational performance.

Two LS15 lamella settlement tanks supplied by Purestream Process Solutions
Key features
- Two LS15 lamella settlement tanks supplied and installed.
- Designed to treat peak flows of 18.3 l/s of screened crude sewage.
- Two desludge pumps integrated into the existing process stream.
- Purestream completed the mechanical and electrical installation.
- Modular design enabling rapid deployment and future operational flexibility.
Project summary
- Client: Severn Trent.
- Location: Frampton on Severn.
- Solution provider: Purestream Process Solutions.
- Duration: 12-weeks.
For More Information, contact us at https://www.purestreamdesign.com