Matlock WwTW
Delivery of the Purestream submerged aerated filter
Matlock Wastewater Treatment Works serves the Matlock area and surrounding catchments, providing wastewater treatment for both domestic and industrial customers. To support ongoing effluent compliance and strengthen biological treatment performance, Severn Trent Water commissioned Purestream Process Solutions to design, supply and install a Submerged Aerated Filter (SAF) unit.
Challenges
The project was developed to help the works consistently achieve Environment Agency ammonia consent standards by increasing biological treatment capacity and maintaining optimal treatment conditions. A key challenge during delivery was arranging the transportation and installation of the treatment unit across a bridge with restricted width and weight limitations, requiring detailed logistical planning and coordination.
Solution
Following careful preparation, Purestream supplied and installed an ST1200 SAF unit in accordance with the client’s requirements. Specialist transport and craneage operations were coordinated to ensure the unit could be safely delivered and positioned within the restricted access area, with all works completed in compliance with relevant lifting and safety regulations.
Outcome
The installed SAF unit provides additional biological treatment capacity, maintaining low ammonia concentrations within the final effluent and supporting continued regulatory compliance. Following upstream treatment processes, flows are directed through the SAF before discharge to the final settlement chamber and subsequent release to the River Derwent. Designed to treat flows of up to 10 litres per second, the system delivers a reliable and efficient enhancement to the site’s existing treatment infrastructure.

Submerged Aerated Filter from Purestream Process Solution at Matlock WwTW
Key features
- ST1200 Submerged Aerated Filter (SAF) supplied and installed.
- Designed to treat flows up to 10 litres/second.
- Supports compliance with Environment Agency ammonia consent standards.
- Delivered despite challenging transport and access restrictions.
- Integrated with existing treatment assets to enhance biological treatment performance.
Project summary
- Client: Severn Trent.
- Location: Matlock, Derbyshire.
- Solution provider: Purestream Process Solutions.
- Duration: 12-weeks.