Customize Consent Preferences

We use cookies to help you navigate efficiently and perform certain functions. You will find detailed information about all cookies under each consent category below.

The cookies that are categorized as "Necessary" are stored on your browser as they are essential for enabling the basic functionalities of the site. ... 

Always Active

Necessary cookies are required to enable the basic features of this site, such as providing secure log-in or adjusting your consent preferences. These cookies do not store any personally identifiable data.

No cookies to display.

Functional cookies help perform certain functionalities like sharing the content of the website on social media platforms, collecting feedback, and other third-party features.

No cookies to display.

Analytical cookies are used to understand how visitors interact with the website. These cookies help provide information on metrics such as the number of visitors, bounce rate, traffic source, etc.

No cookies to display.

Performance cookies are used to understand and analyze the key performance indexes of the website which helps in delivering a better user experience for the visitors.

No cookies to display.

Advertisement cookies are used to provide visitors with customized advertisements based on the pages you visited previously and to analyze the effectiveness of the ad campaigns.

No cookies to display.

Search
Nominate/Submit Case Studies
Job Board

Dutypoint Ltd

Ellesmere Port Lorry Park

Wastewater pumping solution for industrial lorry park - Dutypoint Ltd deliver outstanding solutions

Installation of wastewater pumping station equipment

Formula Truckstop is a premier industrial lorry park in North West England, boasting 120 secure overnight parking bays and outstanding facilities for a comfortable stay. Dutypoint was appointed to this large-scale project to install wastewater pumping station equipment into concrete chambers to ensure the facilities, including toilets, sinks and showers, are clear of wastewater and safe and sanitary for customer use.

No design plan was provided, so specialists from Dutypoint completed a full design of the systems, and overcame challenges to ensure that an efficiently working pumping station could be delivered – meeting the client’s needs and hitting tight deadlines.

The Dutypoint team selected 200 mm ABS Sulzer XFP Heavy-Duty Wastewater Pumps. These heavy-duty commercial wastewater pumps are EX-rated and designed for heavy wastewater applications in larger commercial applications, such as lorry parks on this site. During the installation of the system, several challenges had to be overcome, including very high surface runoff from the attenuation lake and lorry car park, very high flow rates and a tight programme.

The customer was incredibly impressed with the service experience, having received a cracking pump station built to high specification, complete with high-quality pumps, ultrasonic level control and an off-site built baffle plate.

Formula Truckstop in North West England

Formula Truckstop in North West England

 

For more information contact Dutypoint Ltd | 01452 300110 | www.dutypoint.com

About Dutypoint Ltd

Since 1976, Dutypoint has become one of the leading players in fluid technology, trusted by clients in the UK and overseas. Integrity, transparency, accountability and clear communication are crucial to how we do business. We stand by what we say – today and every day. The Dutypoint range includes a variety of industry-leading products, including cold water booster sets and QuadraTANK™.