Search
Nominate/Submit Case Studies
Job Board
Cookstown WwTW (2008)
Chester WwTW (2008)
Cornish Phosphorus Removal Schemes (2008)
Cotton Valley STW (2008)
Dunbar WwTW (2008)
Budds Farm WwTW (2008)
Bristol (Avonmouth) STW – Advanced Sludge Treatment (2008)
Belfast WwTW – Incinerator – Project Omega (2008)
Bristol City Flood Alleviation (2008)
Acomb Crescent FAS (2008)
Wigan WwTW – Inlet Works (2007)
Wanlip STW (2007)
Tobermory STW (2007)
Yeovil Storm Sewer Renovation (2007)
(top left) the existing Canklow regulator gate (bottom left) 3D model of the new Canklow Regulator and (right) bathymetry of Woodhouse Mill Washland - Courtesy of JBA-Bentley
Yorkshire Water Pollution Prevention Pilot (2007)
CHP at United Utilities’ WwTWs (2007)
Sennen & Porthcurno STWs (2007)
Portslade (South Street) FAS (2007)
Budds Farm WwTW (2007)
Stockport WwTW (2007)
Stirling WwTW (2007)
Stewarton WwTW (2007)
Port Wemyss & Portnahaven STW (2007)
Weald Road Tunnel (2007)
New Romney & Greatstone First Time Sewerage Scheme (2007)
Newham STW (2007)
Morfa Bychan WwTW (2007)
Minworth STW – Upgrade: Part 1 (2007)
Amtreat (2007)
North Down & Ards WwTW – Project Omega (2007)
CSOs in a Box Installation (2007)
Malmesbury STW (2007)
Hallam Fields STW Endocrine Investigation (2007)
Kilve STW (2007)
FFD Programme – Esholt & Halifax (2007)
Eign WwTW (2007)
High Royd WwTW (2007)
Derby STW Sludge Digestion (2007)
Hamilton WwTW (2007)
Claudy & Sion Mills WwTW (2007)
Belfast Sewers (2007)
Corfe Mullen STW (2007)
Bromborough & Birkenhead WwTWs Odour Control (2007)
Callington STW (2007)
Bran Sands ETW & RSTC (2007)
Billingham STW – Final Effluent Transfer (2007)
Cross Hands WwTW (2007)
Alva WwTW (2006)
Thurso WwTW (2006)
Wortley STW (2006)
St Ives Flood Alleviation Scheme (2006)
Towngate CSO (2006)
Slough STW (2006)
Rendlesham STW (2006)
(top left) the existing Canklow regulator gate (bottom left) 3D model of the new Canklow Regulator and (right) bathymetry of Woodhouse Mill Washland - Courtesy of JBA-Bentley
Rhymney Valley Sewer (2006)
Trefor WwTW (2006)
Scottish Water Programme Overview 2003-2006 (2006)
(top left) the existing Canklow regulator gate (bottom left) 3D model of the new Canklow Regulator and (right) bathymetry of Woodhouse Mill Washland - Courtesy of JBA-Bentley
Pitscottie WwTW (2006)
Paulton STW (2006)
Mitchell Laithes STW (2006)
North Down & Ards WwTW – Site Selection (2006)
Monkmoor STW (2006)
(top left) the existing Canklow regulator gate (bottom left) 3D model of the new Canklow Regulator and (right) bathymetry of Woodhouse Mill Washland - Courtesy of JBA-Bentley
North Coast Wastewater Treatment Scheme (2006)
Mogden to Perry Oak Sewer (2006)
Methlick WwTW (2006)
Merthyr Dyfan Wastewater Storage Tank (2006)
Margate & Broadstairs WwT Scheme (2006)
Carrickfergus & Whitehouse WwTWs (2006)
Granish (Aviemore) WwTW (2006)
Buxton STW (2006)
Chew Stoke STW (2006)
Coleshill & Roundhill Incinerator Upgrades (2006)
Glasgow Strategic Drainage Plan (2006)
Lands End STW (2006)
Flag Fen WwTW (2006)
Drum Vacuum Sewerage Scheme (2006)
Evesham STW (2006)
Belfast WwTW – Scrubber Plant (2006)
Wrentham WwTW (2005)
Whittlesey & Chatteris STWs (2005)
Wool STW (2005)
West Bretton WwTW (2005)
Wilmslow WwTW (2005)
Yorkshire Water Incinerator Upgrades Part 3 (2005)
UID Programme (2005)
Warrington North STW (2005)
Tay WwTW (2005)
Totley Brook Flood Alleviation Scheme (2005)
Slapton & Torcross STW (2005)
Trent Vale Pumping Station (2005)
St Helens WwTW (2005)
K3 West (2005)
Stoke UIDs (2005)
Scrayingham Ecological WwTW (2005)
Thornbury-Aust Pipeline & Outfall (2005)
Shaftesbury STW (2005)
Phillipshill WwTW (2005)
Perry Oaks – Iver South Sludge Processing Centre (2005)
Ringstead Sewerage Scheme (2005)
Portglenone WwTW (2005)
Mullion & Lizard STW (2005)
Sewage Pumping Station Programme (2005)
Knostrop WwTW – Innovative Storm Tank Cleaning (2005)
Huxley Green UIDs (2005)
Harlech & Llanbedr WwTWs (2005)
Lochgoilhead WwTW (2005)
Linton Falls Sewage Pumping Station (2005)
Lewes Sewerage Improvement Scheme (2005)
Larne WwTW (2005)
Knostrop Sewer (2005)
Kellington Sewer Repair (2005)
Gowerton WwTW (2005)
Gillingham (Dorset) STW (2005)
Culmore WwTW (2005)
Charmouth STW (2005)
Fenham (Moorside South) DG5 Flood Alleviation Scheme (2005)
Darlington (Victoria Road) CSO (2005)
Faversham Creek CSO Wildlife Protection (2005)
Bridgewater UIDs (2005)
Dunoon WwTW (2005)
Ashford STW (2005)
Ballyclare WwTW (2005)
Bath CSOs (2005)
Wick WwTW (2004)
Worksop STW (2004)
Worksop STW Sludge Dryer (2004)
Upwell & Outwell Vacuum Sewerage System (2004)
Teign Estuary CSOs (2004)
Yorkshire Water UID Programme (2004)
Yorkshire Water Incinerator Upgrades Part 2 (2004)
Yorkshire Water West Area IWO Programme (2004)
Taunton (Ham) STW (2004)
Tamerton Foliot Wastewater Storage (2004)
Skinningrove STW (2004)
K3 West (2004)
Stoke UIDs (2004)
Sludge Dewatering Programme (2004)
Southport WwTW (2004)
Seamer WwTW (2004)
Packington STW (2004)
Kinson, Palmersford & Wimbourne STWs – UV Disinfection (2004)
Nether Stowey STW (2004)
Melbourn WwTW (2004)
Radipole Sewage Pumping Station (2004)
Linwood & Johnstone WwTW (2004)
Leigh WwTW (2004)
Kirklevington STW (2004)
Reading STW (2004)
Heckmondwike CSO (2004)
Gelligaled Solar Powered CSO (2004)
Hartshill WwTW (2004)
Holyhead WwTW (2004)
High Wycombe STW (2004)
Hyndburn WwTW (2004)
Glasgow Strategic Drainage Plan (2004)
K3 East (2004)
Hoddesdon Transfer Scheme (2004)
(top left) the existing Canklow regulator gate (bottom left) 3D model of the new Canklow Regulator and (right) bathymetry of Woodhouse Mill Washland - Courtesy of JBA-Bentley
Five Fords WwTW (2004)
Cardigan Catchment Solution (2004)
Ballynacor WwTW – Sludge Reclying Centre (2004)
Anglian Water Sludge Strategy (2004)
Crofton WwTW (2004)
(top left) the existing Canklow regulator gate (bottom left) 3D model of the new Canklow Regulator and (right) bathymetry of Woodhouse Mill Washland - Courtesy of JBA-Bentley
Atwick WwTW (2004)
Croal UID (2004)
Balby WwTW (2004)
Buxton STW (2004)
Bristol Redland CSO (2004)
Bradford UID Improvement Scheme (2004)
Braystones WwTW (2004)
(top left) the existing Canklow regulator gate (bottom left) 3D model of the new Canklow Regulator and (right) bathymetry of Woodhouse Mill Washland - Courtesy of JBA-Bentley
Crossness STW (2004)
(top left) the existing Canklow regulator gate (bottom left) 3D model of the new Canklow Regulator and (right) bathymetry of Woodhouse Mill Washland - Courtesy of JBA-Bentley
Abbey Mills Pumping Station (2004)
(top left) the existing Canklow regulator gate (bottom left) 3D model of the new Canklow Regulator and (right) bathymetry of Woodhouse Mill Washland - Courtesy of JBA-Bentley
Barnstaple & Bideford CSOs (2004)
Taw Torridge STW (2003)
Urchfont STW (2003)
Dartmouth STW (2003)
Yorkshire Water Incinerator Upgrades Part 1 (2003)
Yorkshire Water West Area CSO Programme (2003)
Rye Meads STW – Upgrade (2003)
Porthcawl CSOs (2003)
Plymouth WWT Scheme (2003)
Poole STW – UV Disinfection & Storm Tanks (2003)
Small STWs Programme (2003)
Skipsea WwTW (2003)
CSO Programme (2003)
Sandown WwTW (2003)
Sculthorpe WwTW (2003)
Otterton STW (2003)
Lytchett Minster STW (2003)
Llangefni WwTW (2003)
Llandudno Sewage Flooding Prevention Scheme (2003)
Llangrannog WwTW (2003)
Lynmouth STW (2003)
Frittenden WwTW (2003)
Harrogate North WwTW (2003)
Munlochy & Avoch STW (2003)
Foord Valley (Folkestone) Flood Alleviation Scheme (2003)
Derby STW (2003)
Cromarty & Gairloch Drainage Schemes (2003)
Cawood, Kellfield & Wistow Sewage Treatment Scheme (2003)
Cumbria & Ribble UV Projects (2003)