Search
Nominate/Submit Case Studies
Job Board
Weelsby WTW (2006)
Royal Mile (Edinburgh) Mains Rehabilitation (2006)
Sulby WTW (2006)
Stanborough Reservoir (2006)
Scottish Water Programme Overview 2003-2006 (2006)
Rosebery WTW (2006)
Nitreat at Water Treatment Plants (2006)
Monkton Combe Emergency Water Supply (2006)
New River Aqueduct (2006)
Milford & Bednall WTW (2006)
North Essex Water Abstraction Source (2006)
Clarendon WTW (2006)
Fofanny WTW (2006)
Chingford South WTW – Construction (2006)
Burrows WTW (2006)
Carran Hill WTW (2006)
Hazards Green WTW (2006)
Plumbosolvency (2006)
Loftsome Bridge WTW (2006)
Langsett WTW (2006)
Bridlington Water Rationalisation Strategy (2006)
Layer de la Haye WTW (2006)
Chingford South WTW – Process (2006)
Ford Reservoir (2006)
Llanwrin WTW (2006)
Lyng Forge WTW (2006)
Alnwickhill Clearwater Tanks (2006)
Emergency Water Treatment Works (2005)
Nitrate and Pesticide Reduction Programme (2005)
Semi-Structural Resin Pipe Lining (2005)
South-Mid Ceredigion Water Supply (2005)
Sutton Hall WTW (2005)
Syleham WTW (2005)
Tai Po (Hong Kong) WTW (2005)
Sulby WTW (2005)
Packaged Membranes Plant (2005)
Otterbourne & Arundel Water Supply (2005)
Rosebery WTW (2005)
Prescot WTW (2005)
Iver WTW (2005)
Lane End WTW (2005)
Littlehempston WTW (2005)
Lamoload WTW (2005)
Genetic Algorithms (2005)
Dorchester Water Supply (2005)
Chertsey WTW (2005)
Tottiford Trunk Main (2004)
Thirsk – Northallerton Supply Strategy (2004)
Sulby WTW (2004)
St Saviours WTW (2004)
Swinford WTW (2004)
Out Skerries WTW (2004)
Ormesby WTW (2004)
Melbourne WTW (2004)
Mid-Kent Water Mains Renovation (2004)
North Sussex Bulk Supply & Bewl-Darwell (2004)
Lound WTW (2004)
Invercannie WTW (2004)
Water Mains Rehabilitation (Welsh Water) (2004)
Dublin New Water Resources (2004)
Drellingore Pumping Station (2004)
Fofanny WTW (2004)
East London Resource Development (2004)
Greywell WTW (2004)
Fishmoor WTW (2004)
Handois Lamella Washwater Recovery Plant (2004)
Barrow WTW (2004)
Cumwhinton WTW (2004)
Lough Macrory WTW (2003)
Washburn Valley Reservoirs (2003)
Water Resource Strategy 2002-2030 (2003)
Whitacre High Life Pumping Station (2003)
Wear Valley WTW (2003)
Testwood WTW (2003)
Sutton Hall WTW (2003)
Pontsticill WTW (2003)
Seedy Mill WTW (2003)
Sunderland Groundwater Stations (2003)
North Coast Regional Scheme (2003)
Friar Waddon WTW (2003)
Le Mourier Ultrafiltration & Reverse Osmosis Plant (2003)
Groombridge WTW (2003)
Loch Katrine & Loch Lomond Pilot Plants (2003)
Mourne Aquarius 3 (2003)
Lough Owel WTW (2003)
Mile Oak & Goldstone WTW (2003)
Franklaw WTW (2003)
Chertsey WTW Microfiltration Plant (2003)
Dorney WTW (2003)
Church Wilne & Campion Hills WTW (2003)
Crai Water Supply Refurbishment Project (2003)
Archaeological Finds at Two Major Yorkshire Water Projects (2003)
Broken Scar WTW (2003)
Black Lane (Blandford) WTW (2003)
Bradford Intermediate Ring Main (2003)
Bamford WTW (2003)
Bell Green Water Supply Project (2003)
Broomy Hill WTW (2002)
Chellow Heights WTW (2002)
Bunkers Hill Mains Relining (2002)
Bristol Water Cryptosporidium Barrier (2002)
Caerphilly Water Mains Rehabilitation (2002)
Auchneel WTW (2002)
Derwent Aqueduct Duplication Main (2002)
Enhanced Water Treatment Project (2002)
Forth Valley Rural WTW (2002)
Corfe Mullen WTW (2002)
Dunore Point WTW (2002)
Egham WTW (2002)
Meriden to Highters Heath Main (2002)
Manton Lane Reservoir (2002)
Kempton WTW Steam Plant Project (2002)
Inverness WTW (2002)
Lye Oak Pumping Station (2002)
Katrine Water Supply Project (2002)
Langford Wastewater Recycling Scheme (2002)
Swinford WTW (2002)
Cryptosporidium Barrier (2002)
Pathogen Protection at Groundwater Sources (2002)
Venford to Paignton Mains Rehabilitiation (2002)
Waneroo MIEX WTW (2002)
Plumbosolvency (2002)
Watchgate WTW (2002)
Washpool WTW (2002)
Winscar Reservoir (2002)
Affinity Water Metaldehyde Removal Project (2018)
Island Barn Reservoir Remedial Works (2018)
Upper Chelburn Impounding Reservoir (2018)
Euston 42” Trunk Main Diversion (Phase 1) (2018)
Cowleigh Distribution Service Reservoir & Lower Wyche Pipeline (2018)
South Edinburgh Service Resilience (2018)
Woodgate Hill Service Reservoir No. 2 (2018)
Irton WTW (2018)
BRP – Elan Valley Aqueduct (Nantmel and Frydd Wood) – Birmingham Resilience Project (2018)
Prioress Mill Raw Water Pumping Station (2018)
Lochaline Water Quality Upgrade Project (2018)
Audley Borehole Pumping Station (2018)
BRP – Elan Valley Aqueduct (Severn Siphon) – Birmingham Resilience Project (2018)
Bristol Water Southern Strategic Support Main (2018)
Whittle Dene WTW (2018)
Uttlesford Bridge WTW (2018)
Dalton Piercy WTW (2018)
Cheddar Pumping Station (2018)
Tynywaun WTW (2018)
Rivelin WTW – Sirofloc Replacement: Part 2 (2018)
Ogston WTW (2018)
Usk Spillway Upgrade (2018)
BRP – Treated Water Project – Birmingham Resilience Project (2018)
Glascoed WTW (2018)
BRP – Raw Water Project – Birmingham Resilience Project (2018)
Lockwood Reservoir (2018)
Northcombe WTW GAC Scheme (2018)
Melbourne WTW – Clarification & Coagulation (2018)
New Malden Trunk Mains (2018)
Melbourne WTW – High Lift Pump Sump Bypass (2018)
Gouthwaite Impounding Reservoir (2018)
Trinity Broads Mud Pumping Project (2018)
Lumley Raw Water Pumping Station (2018)
Sheeplands WTW (2018)
Stanford Reservoir Spillway Extension (2018)
Ayrshire Resilience Scheme: Phase 2 Highlees (2018)
DCWW AMP6 Water Quality Zone Improvements (2018)
Manganese North (2018)
Hanchurch Service Reservoir (2018)
Affinity Water Pesticide Removal (2017)
Gorbals Pumping Station and Drumboy Hill DSR (2017)
Farlington WTW (2017)
Woolmans Wood Phase 2 (2017)
Papplewick Borehole Pumping Station (2017)
Island of Iona – Seabed Water Supply Pipeline (2017)
Irvine Bypass Trunk Main (2017)
Bickerstaffe Pumping Station (2017)
Heybridge Sea Gate & Lock Gate Replacement (2017)
Severn Trent DG2 Small Pumps Project (2017)
Trosley to Beech Strategic Mains Renewals (2017)
Ambergate Strategic Service Reservoir Renewal: Phase 2 (2017)
Cowley Trunk Main Project (2017)
Poolend & Highgate pH Correction & Plumbosolvency (2017)
Springs Impounding Reservoir (2017)
Llyn Teifi Spillway Rehabilitation Works (2017)
Outwoods Reservoir (2017)
The PIONEER Optimiser (2017)
Horsley WTW (2017)
Wallgrange Solvents and pH Improvements (2017)
Walton Eel Screens (2017)
Tamar Lakes ‘Q’ Scheme (2017)
Masonry Reservoir Spillway Refurbishment (2017)
Kingston WTW Microfiltration Project (2017)
BRP – Elan Valley Aqueduct (Bleddfa) – Birmingham Resilience Project (2017)
BRP – PAC Dosing System – Birmingham Resilience Project (2017)
Digley IRE Valve Tower Metalwork Replacement (2017)
Tiptree & Langham Pumping Station Refurbishments (2017)
Hoplands Farm WTW (2017)
Butterley Spillway Improvements Works (2017)
Heigham WTW (2017)
Tynywaun WTW (2017)
Malpas Service Reservoir (2017)
Axford & Ogbourne WTWs (2017)
Ballydougan to Newry Strategic Trunk Mains Ph2b (2016)
Farlington WTW (2016)