Donegan Civil Engineering
Back Alley Sewer Replacement – Alwyn Street, Liverpool
Sewer replacement in the back alleys of terraced housing, with full reconstruction of over 20 rear yards
Back Alley Sewer Replacement - Alwyn Street, Liverpool
Client: Amey / United Utilities
Value: Approx. £600,000
Project Description / Main Operations
Replacement of a damaged and blocked sewer running down the back alleys of terraced houses in Liverpool.
To enable the sewer works to be carried out, it was necessary to demolish and subsequently reconstruct over 20 no. back yards, including reconstructing brick walls, fixing new doors, fitting new sheds and laying new patios.
Scope and method:
- Replacement of the damaged and blocked sewer running down the back alleys of the terraced houses.
- Demolition and reconstruction of over 20 no. rear yards.
- Reconstruction of brick walls, fixing of new doors, fitting of new sheds and laying of new patios.
For More Information, contact us at http://www.donegan.co.uk
Twin Storage Shafts - Langdale Way, Frodsham
Two shafts - 20.00m and 9.00m diameter - sunk within the playing field of a primary school
Shafts & Tunnelling
Stormwater Storage
Westminster Road, Macclesfield
Construction of an access chamber onto an existing brick culvert to provide an outfall for surface water
Ground Engineering
Sewers
Stormwater Storage
Weaverham WwTW
Green Asset Lab Enabling Works
Concrete Works
Chester Northgate Tunnelling – Chester City Centre
Client: Vinci PLC / Cheshire West & Chester City Council Value: £2,700,000 Project Description/Main Operations V J Donegan & Co Ltd were approached to work alongside Vinci PLC and Cheshire West & Chester City Council to provide a constructable solution for a new surface water outfall, from the Northgate Development Phase 1 in the heart […]
Ground Engineering
Sewers
Stormwater Storage
Tanks
The Airfields, Deeside
Large-diameter caisson and dewatering for regeneration infrastructure at the former RAF Sealand.
Ground Engineering
Precast Concrete
Stormwater Storage
Temporary Works & Shoring
Medlock CSO Screening
Client: Costain / United Utilities Value: £2,200,000 Project Description/Main Operations V J Donegan and Co Ltd was enlisted to collaborate with Costain in via their MSP Framework in partnership with United Utilities on the Medlock CSO Screening project. This initiative aimed to minimize the environmental impact of combined sewer overflows into the Medlock watercourse, an […]
Ground Engineering
Piling
Sewers
Stormwater Storage
Stormwater Storage
Tanks
Liverpool Waters, Stanley Dock – Civil Engineering Projects, Liverpool
Client: Excalon / Vital Energi Value: £600,000 Project Description/Main Operations V J Donegan & Co Ltd were approached by Excalon to provide a solution for laying 2 no. 710mm dia. gas pipes across Great Howard Street. Due to the high concentration of utility services within Great Howard Street it was deemed that an open-cut technique […]
Ground Engineering
Piling
Precast Concrete
Sewers
Tanks
Fujiclean Tank Installation – South Cheshire
Pioneering the FujiClean wastewater treatment system at Calverhall in collaboration with Costain and United Utilities.
Ground Engineering
Tanks
Temporary Works & Shoring