CSO Chambers and Detention Tank – Aqueduct Road and Bolton Road, Blackburn

Two new CSO chambers and a 650m³ detention tank resolving separate unsatisfactory discharges to the River Darwen

CSO Chambers and Detention Tank - Aqueduct Road and Bolton Road, Blackburn

Client: United Utilities

Project Description / Main Operations

As part of United Utilities’ larger Blackburn UIDs scheme, V J Donegan & Co Ltd were awarded this project to resolve 2 separate unsatisfactory discharges into the River Darwen.

The resultant work ensures that the new combined sewer overflow (CSO) chambers comply with the Environment Agency requirement to reduce the number of spills per year and to screen any spills. The 2 working areas were situated near the junction of Aqueduct Road and Bolton Road in Blackburn.

Scope and method – Aqueduct Road:

  • Construction of a 10.30m internal diameter detention tank with 650m³ storage, including backdrop pipework, storm pumps and rising mains.
  • Modifications to an existing brick CSO chamber, including extending the external walls and constructing internal reinforced weir walls, complete with powered screen.
  • Open-cut pipework ranging from 225mm to 900mm diameter, with manhole chambers ranging from 1200mm to 3000mm diameter.

Scope and method – Bolton Road:

  • Construction of a reinforced CSO chamber complete with powered screen.
  • Open-cut and trenchless pipework ranging from 375mm to 1200mm diameter.
  • Manhole chambers ranging from 1500mm to 3000mm diameter.