Donegan Civil Engineering
Detention Tank and Screened CSO – Darwen WwTW and Clarence Street, Lancashire
A 15.00m diameter caisson detention tank and pumping station with over 1,000m³ capacity, plus a screened CSO chamber underpinned around a live 4.00m tunnel
Detention Tank and Screened CSO - Darwen WwTW and Clarence Street, Lancashire
Client: United Utilities
Project Description / Main Operations
This project was carried out by V J Donegan & Co Ltd direct for United Utilities, resolving unsatisfactory intermittent discharges at Darwen WwTW and Clarence Street.
Scope and method:
- Construction of a 15.00m diameter shaft, sunk by caisson to approx. 15m deep, acting as a detention tank and pumping station with over 1,000m³ capacity for foul water.
- Fit-out of the detention tank with 2 storm pumps and a scavenger pump feeding a set of twin 200mm diameter rising mains approx. 200m in length.
- Underpinning of a 12.50m diameter shaft to approx. 10m depth around an existing 4.00m diameter tunnel, to act as a CSO chamber, within which a powered screen was installed.
- Approx. 500m of open-cut gravity sewers ranging from 450mm to 750mm diameter, up to 4m deep, along with a number of manholes and in-situ reinforced concrete chambers.
- Construction of an outfall structure within the embankment of the river.
For More Information, contact us at http://www.donegan.co.uk
Twin Storage Shafts - Langdale Way, Frodsham
Two shafts - 20.00m and 9.00m diameter - sunk within the playing field of a primary school
Shafts & Tunnelling
Stormwater Storage
Westminster Road, Macclesfield
Construction of an access chamber onto an existing brick culvert to provide an outfall for surface water
Ground Engineering
Sewers
Stormwater Storage
Weaverham WwTW
Green Asset Lab Enabling Works
Concrete Works
Chester Northgate Tunnelling – Chester City Centre
Client: Vinci PLC / Cheshire West & Chester City Council Value: £2,700,000 Project Description/Main Operations V J Donegan & Co Ltd were approached to work alongside Vinci PLC and Cheshire West & Chester City Council to provide a constructable solution for a new surface water outfall, from the Northgate Development Phase 1 in the heart […]
Ground Engineering
Sewers
Stormwater Storage
Tanks
The Airfields, Deeside
Large-diameter caisson and dewatering for regeneration infrastructure at the former RAF Sealand.
Ground Engineering
Precast Concrete
Stormwater Storage
Temporary Works & Shoring
Medlock CSO Screening
Client: Costain / United Utilities Value: £2,200,000 Project Description/Main Operations V J Donegan and Co Ltd was enlisted to collaborate with Costain in via their MSP Framework in partnership with United Utilities on the Medlock CSO Screening project. This initiative aimed to minimize the environmental impact of combined sewer overflows into the Medlock watercourse, an […]
Ground Engineering
Piling
Sewers
Stormwater Storage
Stormwater Storage
Tanks
Liverpool Waters, Stanley Dock – Civil Engineering Projects, Liverpool
Client: Excalon / Vital Energi Value: £600,000 Project Description/Main Operations V J Donegan & Co Ltd were approached by Excalon to provide a solution for laying 2 no. 710mm dia. gas pipes across Great Howard Street. Due to the high concentration of utility services within Great Howard Street it was deemed that an open-cut technique […]
Ground Engineering
Piling
Precast Concrete
Sewers
Tanks
Fujiclean Tank Installation – South Cheshire
Pioneering the FujiClean wastewater treatment system at Calverhall in collaboration with Costain and United Utilities.
Ground Engineering
Tanks
Temporary Works & Shoring