Emergency Sinkhole Stabilisation – Mancunian Way, Manchester

Emergency stabilisation of a large sinkhole in a major dual carriageway, with six segmental shafts and 125m of tunnel in sandstone

Emergency Sinkhole Stabilisation - Mancunian Way, Manchester

Client: Amey / United Utilities

Value: Approx. £4,500,000

Project Description / Main Operations

Emergency stabilising of a large sinkhole which appeared in a major dual carriageway in Manchester, together with the shaft, tunnelling and reinstatement works required to return the highway to service.

Scope and method:

  • Sheet piling and excavation of a cofferdam approx. 11m x 8m x 7m in depth.
  • Construction of 6 no. segmental shafts, up to 8.50m in diameter and up to 15m in depth.
  • Completion works to the above, including reinforced concrete bases, benching, backdrops and precast concrete roof slabs.
  • Construction of an 1800mm diameter tunnel approx. 125m in length in sandstone, by pipejacking techniques using a shield-mounted roadheader tunnelling machine.
  • Reconstruction of the carriageway, including kerb and central reservation replacement.