Project Description / Main Operations
This project was carried out on behalf of Balfour Beatty, for United Utilities. The project was a flood alleviation scheme centred on the construction of a 20.00m diameter shaft acting as a storage tank in times of heavy rainfall.
The upper part of the shaft is supported by pre-driven steel sheet piles, a method employed due to the anticipated unstable ground conditions within the top 9.00m depth of the shaft.
Scope and method:
- Construction of a 20.00m diameter shaft, approx. 20m deep on completion, providing over 5,000m³ – 5 million litres – of storage capacity for storm water.
- Support of the upper part of the shaft by pre-driven steel sheet piles through the top 9.00m of unstable ground.
For More Information, contact us at http://www.donegan.co.uk
Twin Storage Shafts - Langdale Way, Frodsham
Two shafts - 20.00m and 9.00m diameter - sunk within the playing field of a primary school
Shafts & Tunnelling
Stormwater Storage
Westminster Road, Macclesfield
Construction of an access chamber onto an existing brick culvert to provide an outfall for surface water
Ground Engineering
Sewers
Stormwater Storage
Weaverham WwTW
Green Asset Lab Enabling Works
Concrete Works
Chester Northgate Tunnelling – Chester City Centre
Client: Vinci PLC / Cheshire West & Chester City Council Value: £2,700,000 Project Description/Main Operations V J Donegan & Co Ltd were approached to work alongside Vinci PLC and Cheshire West & Chester City Council to provide a constructable solution for a new surface water outfall, from the Northgate Development Phase 1 in the heart […]
Ground Engineering
Sewers
Stormwater Storage
Tanks
The Airfields, Deeside
Large-diameter caisson and dewatering for regeneration infrastructure at the former RAF Sealand.
Ground Engineering
Precast Concrete
Stormwater Storage
Temporary Works & Shoring
Medlock CSO Screening
Client: Costain / United Utilities Value: £2,200,000 Project Description/Main Operations V J Donegan and Co Ltd was enlisted to collaborate with Costain in via their MSP Framework in partnership with United Utilities on the Medlock CSO Screening project. This initiative aimed to minimize the environmental impact of combined sewer overflows into the Medlock watercourse, an […]
Ground Engineering
Piling
Sewers
Stormwater Storage
Stormwater Storage
Tanks
Liverpool Waters, Stanley Dock – Civil Engineering Projects, Liverpool
Client: Excalon / Vital Energi Value: £600,000 Project Description/Main Operations V J Donegan & Co Ltd were approached by Excalon to provide a solution for laying 2 no. 710mm dia. gas pipes across Great Howard Street. Due to the high concentration of utility services within Great Howard Street it was deemed that an open-cut technique […]
Ground Engineering
Piling
Precast Concrete
Sewers
Tanks
Fujiclean Tank Installation – South Cheshire
Pioneering the FujiClean wastewater treatment system at Calverhall in collaboration with Costain and United Utilities.
Ground Engineering
Tanks
Temporary Works & Shoring