Search
Nominate/Submit Case Studies
Job Board

Donegan Civil Engineering

Underground Pumping Station – HMP Featherstone, Wolverhampton

Design, build and installation of an underground pumping station on the extension works at HMP Featherstone

Underground Pumping Station - HMP Featherstone, Wolverhampton

Client: Kier Construction

Project Description / Main Operations

V J Donegan & Co Ltd were appointed by Kier Construction to undertake this specialist subcontract, which included the design, build and installation of an underground pumping station on the extension works to HMP Featherstone.

A 9.00m internal diameter shaft was sunk by caisson method to a depth of approx. 10m in sands and gravels, founded in very weak sandstone.

Scope and method:

  • Sinking of a 9.00m internal diameter shaft by caisson method to approx. 10m depth in sands and gravels, founded in very weak sandstone.
  • Construction of surrounding structures including a valve chamber, flow control chamber, isolation penstock chamber and macerator chamber.
  • Interconnecting pipework, ductile iron backdrop pipework and rising main pipework.

MEICA scope

  • 3 no. variable speed submersible pumps.
  • Rising main pipework and isolating penstock for maintenance purposes.
  • Macerator channel grinder for breaking up solids.
  • All associated electronic control equipment.

For More Information, contact us at http://www.donegan.co.uk

The Airfields, Deeside
Large-diameter caisson and dewatering for regeneration infrastructure at the former RAF Sealand.