Dwr Cymru Welsh Water
Welsh Water provides water supply and sewerage services to over three million people in Wales and some adjoining areas of England.
The company operates 81 reservoirs, 105 water treatment works and supplies an average 900 million litres of water every day through a network comprising 27,000km of water mains, 532 pumping stations and 715 service reservoirs. DCWW also collects wastewater (including surface water and highway drainage) through a network of 19,000km of sewers, 1,700 sewage pumping stations and 3,300 combined sewer overflows. Wastewater is treated at 832 treatment works.
Queensferry WwTW (2024)
Replacement of existing inlet works with new DfMA structure
Wastewater Treatment and Sewerage
Cog Moors Advanced Anaerobic Digestion Facility (2021)
Welsh Water’s sludge strategy is to treat 97% of sludge using advanced anaerobic digestion (AAD) technology. The Cog Moors AAD facility was constructed to supplement the existing facilities at Cardiff and Afan in South Wales along with the recently constructed Five Fords facility in North Wales. AAD gives the benefits of: Meeting the Enhanced Sludge […]
Renewable Energy
Wastewater Treatment and Sewerage
North Wales Sludge Strategy & Five Fords AAD (2018)
Welsh Water set out its vision in its Sewage Sludge Strategy 2040 how it intended to deal with the number one waste management challenge all water utility providers face, the sustainable management and disposal of wastewater sludges. With ever tightening nutrient and heavy metal limits on agricultural usage, and more pressure than ever for companies […]
Renewable Energy
Wastewater Treatment and Sewerage
Five Fords WwTW (2016)
Five Fords WwTW is a sewage works just outside Wrexham in north-east Wales blending passive and activated sludge treatment. The works is named because there are five fords crossing the River Clywedog (Afon Clywedog) locally. The works covers a large area of land and is neighbour to fields leased to local farmers. The sewage treatment […]
Renewable Energy
Wastewater Treatment and Sewerage
Saltney & Kinmel Bay Rising Main Replacements (2014)
Securing long term operational performance and preventing pollution
Wastewater Treatment and Sewerage
Swansea Bay WwTW (2014)
MBBR and DAF solution: an innovative process solution to enhance performance for Dŵr Cymru Welsh Water
Wastewater Treatment and Sewerage
Beachley Sewerage Scheme (2013)
Provision of a new public sewerage system for 110 properties
Wastewater Treatment and Sewerage
Begelly & Kilgetty FAS (2013)
Reduce the risk of localised flooding of properties within the Langdon catchment
Wastewater Treatment and Sewerage
Briton Ferry FAS (2013)
Flood protection provided through a stormwater separation solution
Wastewater Treatment and Sewerage
Gowerton WwTW - Sea Outfall (2013)
Outfall rehabilitation to alleviate pollution in a SSSI and designated shellfish water
Wastewater Treatment and Sewerage
Lampeter STW (2013)
Critical refurbishments needed to improve the quality of the final outlet
Wastewater Treatment and Sewerage
River Rangers (2013)
Dŵr Cymru Welsh Water launches a strategy to identify and reduce sewer pollution
Wastewater Treatment and Sewerage
Specification for SuDS (2013)
Developing and implementing a sustainable drainage planning framework for Dŵr Cymru Welsh Water
Flood Alleviation
Wastewater Treatment and Sewerage
Alwen WTW (2012)
£14m investment to improve disinfection processes and aluminium removal performance
Water Treatment and Supply
Burry Inlet Investigations (2012)
Retrofit SuDS used to reduce CSO spills into protected shellfish water
Wastewater Treatment and Sewerage
Capel Dewi WTW (2012)
Treatment works extension and existing works improvements
Water Treatment and Supply
Carmarthen Wastewater Improvement Scheme (2012)
Dŵr Cymru Welsh Water resolve pollution and sewer collapses in Historic Carmarthen
Wastewater Treatment and Sewerage
Five Fords WwTW (2012)
New anaerobic digestion plant and habitat quality upgrade
Renewable Energy
Wastewater Treatment and Sewerage
Newport Parrog Long Sea Outfall (2012)
New long sea outfall to improve bathing water quality on key Pembrokeshire beach
Wastewater Treatment and Sewerage
Cardiff & Afan AAD Plants (2011)
Dŵr Cymru Welsh Water delivers AD plants early, and moves towards power self-sufficiency in wastewater treatment
Renewable Energy
Wastewater Treatment and Sewerage
Crai WTW (2011)
Upgrade with CoCoDAFF® and existing works refurbishment
Water Treatment and Supply
Whitchurch WwTW (2011)
Programme of improvements to meet new EA consent and habitats drivers
Wastewater Treatment and Sewerage
Cardiff East Control Strategy (2010)
Cardiff East control strategy to low lying flood areas
Wastewater Treatment and Sewerage
Cog Moors STW - Storm UV Disinfection (2010)
Sustainability through new technology and seasonal consenting
Wastewater Treatment and Sewerage
Cwellyn WTW (2010)
Enhancement with DAF, RGF and Ultraviolet Disinfection
Water Treatment and Supply
Llanbedr, Barmouth, Fairbourne & Nefyn WwTWs (2010)
Programme to improve MBR performance in North Wales
Wastewater Treatment and Sewerage
Northumberland Avenue SPS (2010)
3-channel medium pressure UV disinfection plant
Wastewater Treatment and Sewerage
Amlwch WwTW (2009)
£7 million investment at new WTW in North Wales
Wastewater Treatment and Sewerage
Cog Moors STW - Storm UV Disinfection (2009)
An innovative use of UV technology to achieve bathing water compliance
Wastewater Treatment and Sewerage
Penybont WTW (2009)
WTW upgrade with steel tank dissolved air flotation and rapid gravity filtration
Water Treatment and Supply
Steynton (Merlins Bridge) Pumping Station (2009)
Careful planning and commitment lead to success
Wastewater Treatment and Sewerage
Bretton WTW (2008)
Combined quality and capital maintenance project
Water Treatment and Supply
Chester WwTW (2008)
Storm tank discharge and inlet works
Wastewater Treatment and Sewerage
Crynant WwTW (2008)
Largest biological contactor & reed bed in Wales installed
Wastewater Treatment and Sewerage
Ystradyfodwg & Pontypridd - Wedal Road Truck Sewer Duplication (2008)
Trunk sewer duplication - new 250m inverted siphon sewer
Wastewater Treatment and Sewerage
Cross Hands WwTW (2007)
£3m expansion to accommodate food park
Wastewater Treatment and Sewerage
Eign WwTW (2007)
High rate filter replacement
Wastewater Treatment and Sewerage
Morfa Bychan WwTW (2007)
New wastewater treatment works on site of existing headworks
Wastewater Treatment and Sewerage
Merthyr Dyfan Wastewater Storage Tank (2006)
An innovative semi-precast concrete solution
Wastewater Treatment and Sewerage
Plumbosolvency (2006)
“Plumbo” scheme - excellent example of successful alliancing
Water Treatment and Supply
Rhymney Valley Sewer (2006)
Enhanced productivity tools optimise sewerage improvements
Wastewater Treatment and Sewerage
Trefor WwTW (2006)
New £1.2 million WwTW
Wastewater Treatment and Sewerage
Gowerton WwTW (2005)
Upgrade work to meet consents
Wastewater Treatment and Sewerage
Harlech & Llanbedr WwTWs (2005)
“Greenfield” WwTW schemes for coastal communities
Wastewater Treatment and Sewerage
Huxley Green UIDs (2005)
Eliminating UID problem & reducing local flooding
Wastewater Treatment and Sewerage
South-Mid Ceredigion Water Supply (2005)
Curing shortfall now & catering for predicted 25 years growth
Water Treatment and Supply
Cardigan Catchment Solution (2004)
Part of Welsh Water’s £1.2 billion investment programme
Wastewater Treatment and Sewerage
Five Fords WwTW (2004)
Whole catchment solutions challenge the norm
Wastewater Treatment and Sewerage
Gelligaled Solar Powered CSO (2004)
First solar powered combined sewer overflow - UK ‘first’ claim for Gelligaled Park, South Wales
Renewable Energy
Wastewater Treatment and Sewerage
Holyhead WwTW (2004)
Full SBR treatment & environmental benefits to area
Wastewater Treatment and Sewerage
Water Mains Rehabilitation (Welsh Water) (2004)
Dwr Cymru Welsh Water on track to beat this target
Water Treatment and Supply
Crai Water Supply Refurbishment Project (2003)
Major rehabilitation of supply network in Swansea Valley
Water Treatment and Supply
Llandudno Sewage Flooding Prevention Scheme (2003)
Dwr Cymru Welsh Water’s biggest flood protection project
Wastewater Treatment and Sewerage
Llangefni WwTW (2003)
New Biological Nutrient Removal Scheme (BNR) for 30,000 PE
Wastewater Treatment and Sewerage
Llangrannog WwTW (2003)
£1.3m investment at Cardigan Coast village
Wastewater Treatment and Sewerage
Pontsticill WTW (2003)
Solving concrete corrosion problem at DAF plant
Water Treatment and Supply
Porthcawl CSOs (2003)
£5.8m investment cleans up the sea at popular resort
Wastewater Treatment and Sewerage
Broomy Hill WTW (2002)
Extensive upgrade provides essentially new asset
Water Treatment and Supply
Caerphilly Water Mains Rehabilitation (2002)
Water mains rehabilitation DCWW Wales & Hereford Region
Water Treatment and Supply
Colwyn Bay CSO Improvement Scheme (2002)
Combined surface water and CSO improvement scheme
Wastewater Treatment and Sewerage
Garnswilt WwTW (2002)
Combined sewer overflows & waste water treatment works
Wastewater Treatment and Sewerage
Prestatyn & Llanasa WwTW (2002)
New WwTW in constrained site will serve two catchments
Wastewater Treatment and Sewerage