Search
Nominate/Submit Case Studies
Job Board
Maghera & Dungiven WwTWs (2012)
Merstham STW (2012)
Mogden STW – Pasteurisation Plant (2012)
Norfolk Broads – Phosphate Removal (2012)
Overview – Nitreat – Developments in the Control & Design of Nitrate Removal Plants During AMP4 & AMP5 (2012)
Newport Parrog Long Sea Outfall (2012)
Rowden Road Sewage Pumping Station (2012)
Riverside STW (2012)
River Avon Project (2012)
Seafield WwTW (2012)
Yorkshire Water rBWD – Scarborough WwTW (2012)
Sawley Road & Nooning Lane Defective Rising Main (2012)
e5 Programme – Major Projects Overview (2012)
Staplefield WwTW (2012)
Shap WwTW (2012)
Lee Tunnel – Shaft Construction (2012)
Tyneside Sustainable Sewerage Pilot Study (2012)
Trelawney Ave Flood Alleviation Project (2012)
Tarrant Crawford STW (2012)
Asset Optimisation Programme (2012)
Whitehead, Ballcarry & Ballystruder Rationalisation (2012)
Weston-super-Mare STW (2012)
FFD Programme – Woodhouse Mill WwTW (2012)
Willenhall UID (2012)
Columbia Road FAS (2012)
Wallsend Flooding (2015)
e5 Programme – Worksop STW Northern Area Sludge (2015)
(top left) the existing Canklow regulator gate (bottom left) 3D model of the new Canklow Regulator and (right) bathymetry of Woodhouse Mill Washland - Courtesy of JBA-Bentley
Truro DG5 Flooding Scheme (2015)
Torquay (Abbey Park) Bathing Waters (2015)
Winlaton Mill FAS (2015)
Thames Tideway Tunnel – Overview (2015)
Thanet Sewer Rehabilitation Scheme (2015)
Stoneyford Integrated Constructed Wetland (2015)
Sycamore Road Storage Shaft FAS (2015)
St Judes Way (Rainworth) FAS (2015)
Swindon Southern Trunk Sewer Phase 2 (2015)
Swindon STW Network & Growth Upgrade Project (2015)
Swindon STW – Inlet Works (2015)
Private Drain & Sewers (2015)
Ravenfield Sewage Pumping Station (2015)
Portsmouth FAS – Early Warning Scheme (2015)
Portsmouth FAS – Sewer Network Improvements (2015)
Oldham & Royton Integrated Strategy (ORIS) (2015)
Architecture in the Water Industry (2015)
Minworth STW – Biomethane Injection Plant (2015)
Mauchline STW (2015)
Liverpool WwTW (2015)
Lee Tunnel – Tideway Pumping Station (2015)
Lee Tunnel – Secondary Lining (2015)
Ivybridge Bathing Waters (2015)
Herne Hill & Dulwich FAS (2015)
Holywood Sewer Network Improvements Project (2015)
Hulland Ward STW (2015)
Holbeton Bathing Waters (2015)
Holt Drive (Loughborough) FAS (2015)
Phosphorus Removal Scheme (2015)
Deephams STW – Upgrade (2015)
FFD Programme – Castleford WwTW (2015)
Chichester WwTW (2015)
Carlisle WwTW (2015)
Colebrook FAS (2015)
Christchurch STW (2015)
Coningswath Road (Carlton) FAS (2015)
Chamberlayne Road FAS (2015)
Charlton Hayes Interceptor Sewer (2015)
Bellozanne STW (2015)
Yorkshire Water rBWD – Bridlington Stormwater Outfall (2015)
Barrow in Furness WwTW Outfall (2015)
Ash Lane Detention Tank (2015)
Berry Hill STC & Taunton STW (2015)
Annagher Wastewater Pumping Station (2015)
Boat of Garten WwTW (2015)
Precast Sewage Pumping Station Programme (2011)
Whitchurch WwTW (2011)
Water Reflections & Visions (2011)
Whitby (Endeavour Wharf) Sewer Repair (2011)
Toome & Creagh WwTW Scheme (2011)
AMP5 Overview (2011)
Sudbourne Road (Brixton) FAS (2011)
Yorkshire Water rBWD – Revised Bathing Water Improvement Programme (2011)
One-Step Anammox Process (2011)
Poole STW – Control Equipment (2011)
Newtownbreda WwTW (2011)
Rural Wastewater Improvement Programme (2011)
Minworth STW – Sludge Dewatering (2011)
Minworth STW – Sludge Screening Efficiency (2011)
Meden Vale FAS (2011)
Moneymore & Coagh WwTW (2011)
Magherafelt WwTW (2011)
Longbenton FAS (2011)
Loch Ryan Wastewater Treatment Scheme (2011)
Thames Tideway Tunnel – Overview (2011)
Long Reach STW (2011)
Llangadfan Catchment Pumping Stations (2011)
Leamington Sewerage Strategy (2011)
Hastings WwTW (2011)
Hendon STW Sludge Dewatering (2011)
Gobowen Pumping Station & Rising Main (2011)
Falmouth STW (2011)
Forth Replacement Crossing (2011)
Deephams STW – Improvements (2011)
Dunoon WwTW (2011)
Davyhulme WwTW (2011)
Clapham, Austwick & Newby WwTW (2011)
Castlecaulfield WwTW (2011)
Cranleigh, Woking, Farnham & Earlswood STWs (2011)
Carbarns WwTW (2011)
FFD Programme – Calder Vale STW (2011)
Cardiff & Afan AAD Plants (2011)
Brighton & Hove WwTW (2011)
Biological Nutrient Removal (2011)
Anglian Water AMP5 Biosolids Special Projects (2011)
Ashton Avenue Pumping Station (2011)
Whitlingham & Great Billing Sludge Treatment Centres (2010)
Tyne South Bank CSOs (2010)
Workington WwTW (2010)
Troqueer WwTW (2010)
Whitley Bay Flood Alleviation Scheme (2010)
Solway Cluster (Glasson) WwTW (2010)
Salisbury STW (2010)
Stressholme STW (2010)
River Tame UPMs (2010)
Pocklington WwTW (2010)
Park Avenue FAS (2010)
Northumberland Avenue SPS (2010)
Llanbedr, Barmouth, Fairbourne & Nefyn WwTWs (2010)
Leigh WwTW (2010)
Mersey Valley Process Centre – SHARON Plant (2010)
Maidstone – Woolley Road SuDS (2010)
Mogden STW (2010)
Fullerton STW (2010)
Hamiltonsbawn WwTW (2010)
(top left) the existing Canklow regulator gate (bottom left) 3D model of the new Canklow Regulator and (right) bathymetry of Woodhouse Mill Washland - Courtesy of JBA-Bentley
Hemingbrough WwTW (2010)
Fleetwood WwTW (2010)
FFD Programme – Huddersfield & Spen Valley WwTWs (2010)
Chichester WwTW (2010)
Chelmsford WwTW (2010)
Cog Moors STW – Storm UV Disinfection (2010)
Canterbury Sewerage Scheme (2010)
Eastney Pumping Station (2010)
Derrylin WwTW (2010)
Cardiff East Control Strategy (2010)
Enniskillen WwTW (2010)
Evershot STW (2010)
Bushmills WwTW (2010)
Brighton & Hove WwTW (2010)
Ashford Sludge Treatment Centre (2010)
Ashton under Lyne WwTW (2010)
Belfast Sewers Project (2010)
Antrim WwTW (2010)
Wigan WwTW (2009)
West Ham FAS (2009)
Steynton (Merlins Bridge) Pumping Station (2009)
The Limes Flood Prevention Scheme (2009)
UID Programme 2008-2009 (2009)
Princess Parkway, Rossendale and Wyre Estuary UIDs (2009)
Mersey Valley Process Centre – Shell Green Extension (2009)
Minworth STW – Upgrade: Part 3 (2009)
Rural Wastewater Investment Programme (2009)
Melbourne WwTW (2009)
North Queensferry WwTW (2009)
Peregrine Close (Swindon) FAS (2009)
Kendal WwTW (2009)
Loch Ewe Bank First Time Provision (2009)
Kirkcaldy WwTW (2009)
(top left) the existing Canklow regulator gate (bottom left) 3D model of the new Canklow Regulator and (right) bathymetry of Woodhouse Mill Washland - Courtesy of JBA-Bentley
Kenilworth Sewerage Strategy (2009)
FFD Programme – Harrogate South, Nabern & Spen Valley WwTWs (2009)
Holt & Gaunts Common Sewerage Schemes (2009)
Glenstall & Ballymoney WwTW (2009)
Great Yarmouth FAS (2009)
Bran Sands RSTC Advanced Digestion (2009)
Basildon WwTW (2009)
Blackburn WwTW Scheme – Nabs Head Inlet & Smithfold Main Works (2009)
Cog Moors STW – Storm UV Disinfection (2009)
Biddulph WwTW (2009)
Carlisle Flood Alleviation Project (2009)
Bristol City Flood Alleviation (2009)
Barrow Flood Relief Scheme (2009)
Amlwch WwTW (2009)
Albrighton FWS Flood Alleviation (2009)
Ystradyfodwg & Pontypridd – Wedal Road Truck Sewer Duplication (2008)
Windermere WwTW (2008)
Strongford STW (2008)
Scunthorpe (Ashby South Grange) UID (2008)
Seamer & Skirlaugh WwTW (2008)
Ratfyn STW (2008)
North Coast Wastewater Treatment Scheme (2008)
Mountmellick WwTW (2008)
Minworth STW – Upgrade: Part 2 (2008)
Peel Common STW (2008)
Monkton Colliery WwTW (2008)
Plimsoll CSO (2008)
Poole STW – Upgrade (2008)
North Kessock Wastewater Transfer Scheme (2008)
FFD Programme – Knostrop & Nelley (2008)
Kings Lynn & Cotton Valley Sludge Treatment Centres (2008)
Loughborough STW (2008)
Dartmouth South Town Outfall Removal (2008)
Crynant WwTW (2008)
Denaby, Mexborough & Burcroft WwTW (2008)