Scottish Water
Scotland has an area of 79,000 square kilometres and a coastline of over 11,000 kilometres. With a small and relatively dispersed population a large number of small water and waste water treatment works are required.
The company is the sole provider of water and waste water services to around 5 million customers in 2.4 million households. Thousands of assets are operated and maintained – over 47,000 kilometres of water pipes, 50,000 kilometres of sewer pipes, 1,837 waste water treatment works and 297 water treatment works plus pumping stations, sludge treatment centres, and reservoirs. Each day the company supplies 1.3 billion litres of clean water and nearly 1 billion litres of wastewater is taken away and treated before being returned to the rivers and seas.
![](https://waterprojectsonline.com/wp-content/uploads/water_companies/main_image/scottish_01.jpg)
![](https://waterprojectsonline.com/wp-content/uploads/article_photos/2016/2016_scottish_shieldhall_07.jpg)
![](https://waterprojectsonline.com/wp-content/uploads/article_photos/2019/2019_paisley_01.jpg)
![](https://waterprojectsonline.com/wp-content/uploads/article_photos/2019/2019_scottish_ness_04.jpg)
![](https://waterprojectsonline.com/wp-content/uploads/article_photos/2019/2019_scottish_stromness_02.jpg)
![](https://waterprojectsonline.com/wp-content/uploads/article_photos/2019/2019_scottish_stromness_01.jpg)
![](https://waterprojectsonline.com/wp-content/uploads/article_photos/2019/2019_scottish_stromness_03.jpg)
![](https://waterprojectsonline.com/wp-content/uploads/article_photos/2016/2016_scottish_shieldhall_09.jpg)
![](https://waterprojectsonline.com/wp-content/uploads/article_photos/2016/2016_scottish_elmvale_01.jpg)
![](https://waterprojectsonline.com/wp-content/uploads/article_photos/2017/2017_scottish_gorbals_01.jpg)
![](https://waterprojectsonline.com/wp-content/uploads/article_photos/2019/2019_scottish_lochmaddy_01.jpg)
![](https://waterprojectsonline.com/wp-content/uploads/article_photos/2024-edition/hamilton-energy-01.jpg)
Hamilton WwTW (2024)
Installation of the UK’s first containerised mid-process hydroelectric turbine on a wastewater treatment works
Hydro Electric
Renewable Energy
Wastewater Treatment and Sewerage
Wastewater Treatment Works
![](https://waterprojectsonline.com/wp-content/uploads/article_photos/2023/whitehall_res_01.jpg)
Whitehall Distribution Service Reservoir (2023)
Whitehall Distribution Service Reservoir (DSR) is located on Stronsay, one of the north isles in Orkney, located 25 miles to the north of the Orkney mainland. The isle is home to 350 residents and is accessible by public ferry and plane. The Stronsay WTW that feeds the DSR is 300m to the south of the […]
Raw Water Source
Reservoirs and Storage
Water Treatment and Supply
![](https://waterprojectsonline.com/wp-content/uploads/article_photos/2023/winchburgh_01.jpg)
Winchburgh WwTW (2023)
Winchburgh is located five miles west of Edinburgh Airport and the existing wastewater treatment works lies to the south-east of the town, approximately 200m from the nearest residential street. The site access road runs adjacent to the main Glasgow to Edinburgh railway line, the top of the embankment being a couple of metres from the […]
Sludge Treatment
Wastewater Treatment and Sewerage
Wastewater Treatment Works
![](https://waterprojectsonline.com/wp-content/uploads/article_photos/2021/beadersaig_01.jpg)
Bedersaig WTW (2021)
The small villages of Huisinis and Gobhaig on the Isle of Harris each consist of a few households, but in the summer months the local beach is inundated with campers and campervans. This means that the water demand fluctuates dramatically through the year. The two villages were served by single, basic supplies: Huisinis by a […]
Pipelines
Water Treatment and Supply
Water Treatment Works
![](https://waterprojectsonline.com/wp-content/uploads/article_photos/2021/craighead_11.jpg)
Craighead WTW (2021)
Craighead WTW is a new water treatment works located on a greenfield site close to the existing works in the north-east of Scotland. The project objective is to improve the treatment of water to the customers of the town of Huntley and surrounding areas. The existing Craighead WTW has reached the end of its economic […]
Water Treatment and Supply
Water Treatment Works
![](https://waterprojectsonline.com/wp-content/uploads/article_photos/2021/rosebery_02.jpg)
Rosebery WTW (2021)
Located in Temple, near Gorebridge, in Midlothian, Scotland, Rosebery WTW treats raw water sourced from Megget and Gladhouse Reservoirs which is blended at the works inlet. The blended raw water is generally low in turbidity (2.0 NTU 95%ile), moderate colour (63 mg/l Pt/Co 95%ile), with average to high metals concentrations (55 to 300ug/l Mn, Al, […]
Water Treatment and Supply
Water Treatment Works
![](https://waterprojectsonline.com/wp-content/uploads/article_photos/2020/2020_invercannie_01.jpg)
Invercannie WTW (2020)
Located to the West of the town of Banchory, Aberdeenshire, Scottish Water’s Invercannie WTW is currently a 49 Ml/d water treatment works which serves the local population as well as providing raw and treated water to Mannofield WTW in Aberdeen via two 28km aqueducts (one laid in 1866 and the other in 1924). The treatment […]
Water Treatment and Supply
Water Treatment Works
![](https://waterprojectsonline.com/wp-content/uploads/article_photos/2020/2020_tarbert_01.jpg)
Tarbert WTW (2020)
Tarbert WTW is located on the edge of Loch Fyne, an inland sea loch, west of the small village of Tarbert in Argyll & Bute. The water treatment works is supplied from the Loch a’ Chaorainn located 5 miles north-west of the treatment works, serving a population of approximately 3,000. To remove the risk of […]
Water Treatment and Supply
Water Treatment Works
![](https://waterprojectsonline.com/wp-content/uploads/article_photos/2020/2020_uig_01.jpg)
Uig WTW (2020)
Uig WTW is located on the west coast of Lewis and provides potable water to the community of around 500 residents, with a significant tourist increase in the summer months. The works are gravity-fed by a high-level loch around 2km from the site. Treated water is then pumped from the water treatment works to a […]
Water Treatment and Supply
Water Treatment Works
![](https://waterprojectsonline.com/wp-content/uploads/article_photos/2019/2019_scottish_ardersier_01.jpg)
Ardersier WwTW (2019)
Ardersier is located on the Moray Firth some 11 miles east of Inverness. The wastewater treatment works serves the town of Ardersier and the surrounding area including Inverness Airport and Fort George Barracks. It currently serves a population of less than 2,000 but there are significant developments planned in the area with a long-term future […]
Sewage Pumping Stations
Sludge Treatment
Stormwater Storage
Wastewater Treatment and Sewerage
Wastewater Treatment Works
![](https://waterprojectsonline.com/wp-content/uploads/article_photos/2019/2019_scottish_bradan_01-2.jpg)
Bradan WTW (2019)
Located in South Ayrshire, Scotland, Bradan Water Treatment Works (WTW) has a capacity of 120 Ml/day, with an output of approximately 70 Ml/day. The existing treatment processes comprise aluminium sulphate coagulation, dissolved air flotation, primary filtration, manganese contactors, orthophosphate dosing, lime and disinfection. The works supplies a large area along the west coast of Scotland, […]
Water Treatment and Supply
Water Treatment Works
![](https://waterprojectsonline.com/wp-content/uploads/article_photos/2019/2019_scottish_glenlatterach_01.jpg)
Glenlatterach WTW (2019)
Located south of the town of Elgin in the north east of Scotland, Scottish Water’s Glenlatterach WTW is situated in the heart of Speyside, home to some of Scotland’s most beautiful scenery as well as roughly half of all of the whisky distilleries operating in Scotland. Raw water is abstracted from the Glenlatterach Reservoir and […]
Water Treatment and Supply
Water Treatment Works
![](https://waterprojectsonline.com/wp-content/uploads/article_photos/2019/2019_scottish_inverurie_01.jpg)
Inverurie WwTW (2019)
Inverurie Wastewater Treatment Works lies on the banks of the River Don in Aberdeenshire, at the confluence with the River Urie, and serves a current population of approximately 28,000 people with substantial future growth within the catchment forecasted. This project has been initiated by Scottish Water to provide compliance with new nutrient discharge consents under […]
Sludge Treatment
Wastewater Treatment and Sewerage
Wastewater Treatment Works
![](https://waterprojectsonline.com/wp-content/uploads/article_photos/2019/2019_scottish_ness_01.jpg)
Loch Ness Regional WTW (2019)
Loch Ness Regional is a new multi-site £22m water treatment works and infrastructure project for Scottish Water improving the water supply to their customers from the villages of Fort Augustus and Invermoriston, both to the south of Inverness. Located on the banks of Loch Ness, the project’s objective is to improve the treatment of water […]
Pipelines
Pumping Stations
Water Treatment and Supply
Water Treatment Works
![](https://waterprojectsonline.com/wp-content/uploads/article_photos/2019/2019_scottish_lochmaddy_01.jpg)
Lochmaddy WTW (2019)
Lochmaddy is the main town located on North Uist, which is one of the islands forming part of the Western Isles. This project involved the design, installation, construction and commissioning of a new water treatment works (WTW) on a greenfield site beside the existing site. Additionally, some of the works were within South Lewis, Harris […]
Water Treatment and Supply
Water Treatment Works
![](https://waterprojectsonline.com/wp-content/uploads/article_photos/2019/2019_paisley_01.jpg)
Paisley Tunnel Project (2019)
Scottish Water’s £17m Paisley Environmental Project, which started in October 2016, is the largest of its kind that Scottish Water has ever made in Renfrewshire. The project is part of the company’s £250m, six-year programme of work, launched in 2013, to improve river water quality and the natural environment and tackle flooding across the Greater […]
Sewer Flood Alleviation
Sewers
Stormwater Storage
Wastewater Treatment and Sewerage
![](https://waterprojectsonline.com/wp-content/uploads/article_photos/2019/2019_scottish_stromness_01.jpg)
Stromness Wastewater Network (2019)
Stromness is a town situated around the sheltered bay of Hamnavoe on the west of Orkney’s mainland. It has a population of approximately 2200 inhabitants and a population equivalent (PE) of 2,600, due to the local industry; which is expected to grow to 3,600 in the years ahead. The town has a dramatic and unique […]
Outfalls
Sewage Pumping Stations
Sewers
Wastewater Treatment and Sewerage
Wastewater Treatment Works
![](https://waterprojectsonline.com/wp-content/uploads/article_photos/2018/2018_scottish_inverurie_01.jpg)
Inverurie WwTW (2018)
Inverurie WwTW is located in Aberdeenshire in the north-east of Scotland and provides sewage treatment for Inverurie and the surrounding area including Blackburn, Kintore and Port Elphinstone. It currently serves a population of 28,000, but Inverurie is one of the most rapidly growing towns in terms of population in the UK, with an estimated population […]
Sludge Treatment
Wastewater Treatment and Sewerage
Wastewater Treatment Works
![](https://waterprojectsonline.com/wp-content/uploads/article_photos/2018/2018_scottish_lochaline_01.jpg)
Lochaline Water Quality Upgrade Project (2018)
The Lochaline Water Quality Upgrade Project required the design and delivery of a whole new water treatment works at Lochaline in the remote Morven Peninsula. A modern and compact membrane based treatment technology was selected which would support a rapid and efficient delivery strategy. The key to the delivery strategy was an on off-site modular […]
Water Treatment and Supply
Water Treatment Works
![](https://waterprojectsonline.com/wp-content/uploads/article_photos/2018/2018_scottish_swinstie_01.jpg)
Swinstie Pipe Bridge Replacement (2018)
The existing Swinstie Pipe Bridge is located near Cleland, North Lanarkshire, and the structure supports a 450mm diameter iron gravity sewer pipe across the narrow, steep sided river valley of the Swinstie Burn towards Swinstie WwTW. The existing pipe bridge dates from the 1950s and has exhibited signs of severe distress for a number of […]
Sewer Flood Alleviation
Sewers
Wastewater Treatment and Sewerage
![](https://waterprojectsonline.com/wp-content/uploads/article_photos/2017/2017_scottish_gorbals_01.jpg)
Gorbals Pumping Station and Drumboy Hill DSR (2017)
Scottish Water has undertaken a £120m drinking water improvement scheme in Ayrshire to meet water quality compliance objectives and provide increased resilience of supply to five operational areas. The scheme involves the transfer of water from the Milngavie WTW located north of Glasgow to the Ayrshire region southwest of the city. The scheme makes use […]
Pumping Stations
Reservoirs and Storage
Water Treatment and Supply
![](https://waterprojectsonline.com/wp-content/uploads/article_photos/2016/2016_scottish_elmvale_01.jpg)
Elmvale Row Sewer Flooding Prevention Scheme (2016)
Elmvale Row is located in the Springburn area in the North of Glasgow City and is comprised of three and four storey residential tenement buildings and residential parking. Land use in the surrounding area includes commercial, residential, parkland and a primary school. The topography of the area and capacity of the existing sewer system has […]
Sewer Flood Alleviation
Stormwater Storage
Wastewater Treatment and Sewerage
![](https://waterprojectsonline.com/wp-content/uploads/article_photos/2016/2016_development_centre_01-1.jpg)
Scottish Water Development Centres (2016)
Scotland’s first dedicated water and wastewater technology testing facilities
Wastewater Treatment and Sewerage
Water Treatment and Supply
![](https://waterprojectsonline.com/wp-content/uploads/article_photos/2016/2016_scottish_shieldhall_09.jpg)
Shieldhall Tunnel (2016)
Construction of the Shieldhall Tunnel, the biggest investment in the Glasgow wastewater network since Victorian times, is well underway. Once complete, it will improve river water quality and the natural environment of the River Clyde and its tributaries, enable the Greater Glasgow area to grow and develop, alleviate sewer flooding key locations and deal with […]
Sewers
Stormwater Storage
Wastewater Treatment and Sewerage
![](https://waterprojectsonline.com/wp-content/uploads/article_photos/2015/2015_boat_garden.jpg)
Boat of Garten WwTW (2015)
First below ground structures using DfMA including pre-installed M&E kit & corporate responsibility/environmental best practice
Wastewater Treatment and Sewerage
Wastewater Treatment Works
![](https://waterprojectsonline.com/wp-content/uploads/article_photos/2015/2015_forehill.jpg)
Forehill WTW (2015)
Off site MEICA Construction
Water Treatment and Supply
Water Treatment Works
![](https://waterprojectsonline.com/wp-content/uploads/article_photos/2015/2015_loch_arklet.jpg)
Loch Arklet Reservoir (2015)
Largest anchoring scheme for Scottish Water
Reservoirs and Storage
Water Treatment and Supply
![](https://waterprojectsonline.com/wp-content/uploads/article_photos/2015/2015_mauchline.jpg)
Mauchline STW (2015)
Fully innovative design for manufacture & assembly approach to new assets
Wastewater Treatment and Sewerage
Wastewater Treatment Works
![](https://waterprojectsonline.com/wp-content/uploads/article_photos/2015/2015_penwhapple.jpg)
Penwhapple Reservoir (2015)
First ever precast spillway for Scottish Water
Reservoirs and Storage
Water Treatment and Supply
![](https://waterprojectsonline.com/wp-content/uploads/article_photos/2014/2014-Cowdenbeath-Wetlands-1.jpg)
Cowdenbeath Wetlands (2014)
A sustainable wetland provides Scottish Water with an asset that treats stormwater overflows & provides a habitat for a wide variety of wildlife
Stormwater Storage
Wastewater Treatment and Sewerage
Wastewater Treatment Works
![](https://waterprojectsonline.com/wp-content/uploads/article_photos/2014/2014-Laigh-Shieldpark-Dalamarnock.jpg)
Laigh, Shieldpark & Dalamarnock STWs -Bundle 25A (2014)
Scottish Water’s Bundle 25A project improves water quality of the River Clyde and its tributaries
Wastewater Treatment and Sewerage
Wastewater Treatment Works
![](https://waterprojectsonline.com/wp-content/uploads/article_photos/2014/2014-Scottish-Water-Supply-Demand-Balance-South-Programme.jpg)
Supply Demand Balance South Programme (2014)
Scottish Water’s measures to ensure resilience of supply for customers in Dumfries and Galloway
Reservoirs and Storage
Water Treatment and Supply
![](https://waterprojectsonline.com/wp-content/uploads/article_photos/2014/2014-Talla-Aqueduct.jpg)
Talla Aqueduct (2014)
Overflow chamber stabilisation
Pipelines
Water Treatment and Supply
![](https://waterprojectsonline.com/wp-content/uploads/article_photos/2013/2013-Black-Esk-Reservoir.jpg)
Black Esk Reservoir Dam Raising (2013)
Raising the height of a reservoir and bell-mouth spillway required innovative thinking
Reservoirs and Storage
Water Treatment and Supply
![](https://waterprojectsonline.com/wp-content/uploads/article_photos/2013/2013-Carron-Valley.jpg)
Carron Valley Mains (2013)
Improving water quality in central Scotland
Pipelines
Water Treatment and Supply
![](https://waterprojectsonline.com/wp-content/uploads/article_photos/2013/2013-Cumbernauld.jpg)
Cumbernauld SuDS (2013)
New SuDS detention ponds to treat surface water from an industrial park to improve water quality
Stormwater Storage
Wastewater Treatment and Sewerage
![](https://waterprojectsonline.com/wp-content/uploads/article_photos/2013/2013-Fyne-Process.jpg)
Fyne Process (2013)
Ultra-filtration technology for the treatment of variable surface water quality
Water Treatment and Supply
Water Treatment Works
![](https://waterprojectsonline.com/wp-content/uploads/article_photos/2013/2013-Katrine.jpg)
Katrine Aqueduct Refurbishment (2013)
Essential capital maintenance refurbishment of a strategic raw water supply
Pipelines
Water Treatment and Supply
![](https://waterprojectsonline.com/wp-content/uploads/article_photos/2013/2013-Meadowhead-Steventon.jpg)
Meadowhead & Stevenston Stormwater Transfer (2013)
New stormwater drainage systems improve quality of rivers and bathing water in Kilmarnock & Irvine
Stormwater Storage
Wastewater Treatment and Sewerage
![](https://waterprojectsonline.com/wp-content/uploads/article_photos/2012/2012_ardberg_bannatyne.jpg)
Ardbeg & Port Bannatyne Sewerage Scheme (2012)
£6m Scottish Water project to remove untreated sewage sea outfalls on the Isle of Bute
Outfalls
Sewage Pumping Stations
Sewers
Stormwater Storage
Wastewater Treatment and Sewerage
![](https://waterprojectsonline.com/wp-content/uploads/article_photos/2012/2012_glencorse.jpg)
Glencorse WTW (2012)
Edinburgh’s new £130m WTW is a feat of modern construction methods and sustainable engineering
Water Treatment and Supply
Water Treatment Works
![](https://waterprojectsonline.com/wp-content/uploads/article_photos/2012/2012_scottish_hydropower.jpg)
Hydropower Generating Scheme (2012)
Hydro project will provide Scottish Water with self-generated power for their assets
Hydro Electric
Renewable Energy
![](https://waterprojectsonline.com/wp-content/uploads/article_photos/2012/2012_package_membrane.jpg)
Package Membrane Plants for Remote Areas (2012)
Fyne process removes colour and impurities from raw surface water with no environmental impact
Water Treatment and Supply
Water Treatment Works
![](https://waterprojectsonline.com/wp-content/uploads/article_photos/2012/2012_river_avon_project.jpg)
River Avon Project (2012)
Significant upgrades to 5 WwTWs to protect the natural environment & deliver long term benefits
Wastewater Treatment and Sewerage
Wastewater Treatment Works
![](https://waterprojectsonline.com/wp-content/uploads/article_photos/2012/2012_seafield.jpg)
Seafield WwTW (2012)
Inlet works and odour improvement projects at the largest WwTW in East Scotland
Wastewater Treatment and Sewerage
Wastewater Treatment Works
![](https://waterprojectsonline.com/wp-content/uploads/article_photos/2011/2011_scottish_dw5_ayrshire.jpg)
Ayrshire Bradan A Water Mains DW5 (2011)
Quality enhancements to 1,200km of water mains in Ayrshire through a variety of intervention techniques
Pipelines
Water Treatment and Supply
![](https://waterprojectsonline.com/wp-content/uploads/article_photos/2011/2011_carbarns.jpg)
Carbarns WwTW (2011)
Project to provide growth, quality & capital maintenance improvements
Wastewater Treatment and Sewerage
Wastewater Treatment Works
![](https://waterprojectsonline.com/wp-content/uploads/article_photos/2011/2011_dunoon.jpg)
Dunoon WwTW (2011)
£34m investment in new sewerage collection, transfer & treatment scheme on the Cowal Peninsula
Wastewater Treatment and Sewerage
Wastewater Treatment Works
![](https://waterprojectsonline.com/wp-content/uploads/article_photos/2011/2011_forth_outfall.jpg)
Forth Replacement Crossing (2011)
Relocation of the Port Edgar long sea outfall
Outfalls
Sewers
Wastewater Treatment and Sewerage
![](https://waterprojectsonline.com/wp-content/uploads/article_photos/2011/2011_loch_ryan.jpg)
Loch Ryan Wastewater Treatment Scheme (2011)
£28m investment to deliver a wastewater solution for Stranraer and the surrounding villages
Outfalls
Sewage Pumping Stations
Sewers
Stormwater Storage
Wastewater Treatment and Sewerage
Wastewater Treatment Works
![](https://waterprojectsonline.com/wp-content/uploads/article_photos/2010/2010-Assynt.jpg)
Assynt WTW (2010)
New water treatment works for the Inverness region
Water Treatment and Supply
Water Treatment Works
![](https://waterprojectsonline.com/wp-content/uploads/article_photos/2010/2010-Burncrooks.jpg)
Burncrooks WTW (2010)
Alternative to secondary treatment plant saves millions
Reservoirs and Storage
Water Treatment and Supply
Water Treatment Works
![](https://waterprojectsonline.com/wp-content/uploads/article_photos/2010/2010-Glencorse.jpg)
Glencorse WTW (2010)
£125m investment to improve water supply to Scotland’s capital
Water Treatment and Supply
Water Treatment Works
![](https://waterprojectsonline.com/wp-content/uploads/article_photos/2010/2010-Hawick-Cluster-Water-Supply.jpg)
Hawick Cluster Water Supply (2010)
A £10m integrated solution to improve drinking water quality in the Scottish Borders
Water Treatment and Supply
Water Treatment Works
![](https://waterprojectsonline.com/wp-content/uploads/article_photos/2010/2010-Scottish-Water-Park-Avenue-FAS.jpg)
Park Avenue FAS (2010)
£2.4m project sets a new benchmark within Scottish Water for customer care and delivery
Sewer Flood Alleviation
Stormwater Storage
Wastewater Treatment and Sewerage
![](https://waterprojectsonline.com/wp-content/uploads/article_photos/2010/2010-Tiree.jpg)
Tiree WTW (2010)
Protecting unique habitat key focus for island project team
Water Treatment and Supply
Water Treatment Works
![](https://waterprojectsonline.com/wp-content/uploads/article_photos/2010/2010-Troqueer.jpg)
Troqueer WwTW (2010)
£10m scheme to deliver capital maintenance, growth and odour control
Wastewater Treatment and Sewerage
Wastewater Treatment Works
![](https://waterprojectsonline.com/wp-content/uploads/article_photos/2010/2010-Turret.jpg)
Turret WTW (2010)
£24m upgrade & refurbishment project
Water Treatment and Supply
Water Treatment Works
![](https://waterprojectsonline.com/wp-content/uploads/article_photos/2009/2009-Badentinan.jpg)
Badentinan WTW (2009)
Improved water treatment in the Elgin and east coastal area
Water Treatment and Supply
Water Treatment Works
![](https://waterprojectsonline.com/wp-content/uploads/article_photos/2009/2009-Ballater.jpg)
Ballater WTW (2009)
Capital investment programme to upgrade existing water treatment works
Water Treatment and Supply
Water Treatment Works
![](https://waterprojectsonline.com/wp-content/uploads/article_photos/2009/2009-Clatto.jpg)
Clatto WTW (2009)
£5.1m scheme to secure and improve water treatment for Dundee area
Water Treatment and Supply
Water Treatment Works
![](https://waterprojectsonline.com/wp-content/uploads/article_photos/2009/2009-Glencorse.jpg)
Glencorse WTW (2009)
Pipe production facility bringing major benefits to Edinburgh scheme
Water Treatment and Supply
Water Treatment Works
![](https://waterprojectsonline.com/wp-content/uploads/article_photos/2009/2009-Glenfarg.jpg)
Glenfarg WTW (2009)
£4.3m upgrade scheme to improve water treatment in Fife
Water Treatment and Supply
Water Treatment Works
![](https://waterprojectsonline.com/wp-content/uploads/article_photos/2009/2009-Invercannie-Mannofield.jpg)
Invercannie & Mannofield WTWs (2009)
£41m scheme to improve water treatment for Aberdeen
Water Treatment and Supply
Water Treatment Works
![](https://waterprojectsonline.com/wp-content/uploads/article_photos/2009/2009-Kirkcaldy.jpg)
Kirkcaldy WwTW (2009)
£4.4m scheme to tackle odour issues in Fife town
Wastewater Treatment and Sewerage
Wastewater Treatment Works
![](https://waterprojectsonline.com/wp-content/uploads/article_photos/2009/2009-Loch-Ewe-Bank.jpg)
Loch Ewe Bank First Time Provision (2009)
£15.4m scheme to provide first time sewerage in Scottish Highlands
Sewers
Wastewater Treatment and Sewerage
Wastewater Treatment Works
![](https://waterprojectsonline.com/wp-content/uploads/article_photos/2009/2009-North-Queensferry.jpg)
North Queensferry WwTW (2009)
£1.95m project to replace dilapidated works
Wastewater Treatment and Sewerage
Wastewater Treatment Works
![](https://waterprojectsonline.com/wp-content/uploads/article_photos/2009/2009-Scottish-Water-UID-Programme.jpg)
UID Programme 2008-2009 (2009)
£30m scheme to reduce environmental impact in central belt of Scotland
Sewer Flood Alleviation
Wastewater Treatment and Sewerage
![](https://waterprojectsonline.com/wp-content/uploads/article_photos/2008/2008-Corsehouse.jpg)
Corsehouse WTW (2008)
£7.5m project to upgrade water quality in Ayrshire
Water Treatment and Supply
Water Treatment Works
![](https://waterprojectsonline.com/wp-content/uploads/article_photos/2008/2008-Dunbar.jpg)
Dunbar WwTW (2008)
A new treatment works for a historic coastal town
Wastewater Treatment and Sewerage
Wastewater Treatment Works
![](https://waterprojectsonline.com/wp-content/uploads/article_photos/2008/2008-Fort-William.jpg)
Fort William WTW (2008)
Improved water treatment in the West Highlands
Water Treatment and Supply
Water Treatment Works
![](https://waterprojectsonline.com/wp-content/uploads/article_photos/2008/2008-Katrine.jpg)
Katrine WTW (2008)
700,000 residents of Greater Glasgow delighted with new works
Water Treatment and Supply
Water Treatment Works
![](https://waterprojectsonline.com/wp-content/uploads/article_photos/2008/2008-Kilmelford.jpg)
Kilmelford WTW (2008)
£2.2m project improves Highlands water quality
Water Treatment and Supply
Water Treatment Works
![](https://waterprojectsonline.com/wp-content/uploads/article_photos/2008/2008-Kyle-Lochalsh.jpg)
Kyle & Lochalsh Water Supply (2008)
£5.5 million regional water supply project
Pipelines
Water Treatment and Supply
![](https://waterprojectsonline.com/wp-content/uploads/article_photos/2008/2008-Lomond-Hills.jpg)
Lomond Hills WTW (2008)
£7.6m project to bring water quality improvements to Fife
Water Treatment and Supply
Water Treatment Works
![](https://waterprojectsonline.com/wp-content/uploads/article_photos/2008/2008-North-Kessock.jpg)
North Kessock Wastewater Transfer Scheme (2008)
£4m solution for environmentally sensitive area
Sewage Pumping Stations
Sewers
Wastewater Treatment and Sewerage
![](https://waterprojectsonline.com/wp-content/uploads/article_photos/2008/2008-Tyndrum.jpg)
Tyndrum WTW (2008)
£5.2m scheme brings improved treatment in Scottish Highlands
Water Treatment and Supply
Water Treatment Works
![](https://waterprojectsonline.com/wp-content/uploads/article_photos/2007/2007-Hamilton.jpg)
Hamilton WwTW (2007)
£5m project is final part of scheme to clean up River Clyde
Wastewater Treatment and Sewerage
Wastewater Treatment Works
![](https://waterprojectsonline.com/wp-content/uploads/article_photos/2007/2007-Invercannie-Mannofield.jpg)
Invercannie & Mannofield WTWs (2007)
£38m scheme to improve water supplies in Aberdeen
Water Treatment and Supply
Water Treatment Works
![](https://waterprojectsonline.com/wp-content/uploads/article_photos/2007/2007-Loch-Eck.jpg)
Loch Eck WTW (2007)
£8.4 investment improves quality
Water Treatment and Supply
Water Treatment Works
![](https://waterprojectsonline.com/wp-content/uploads/article_photos/2007/2007-Port-Wemyss.jpg)
Port Wemyss & Portnahaven STW (2007)
£2.2m project has environmental benefits for island community
Sewers
Wastewater Treatment and Sewerage
Wastewater Treatment Works
![](https://waterprojectsonline.com/wp-content/uploads/article_photos/2007/2007-Stewarton.jpg)
Stewarton WwTW (2007)
£1.1m project enhances water quality in west of Scotland
Wastewater Treatment and Sewerage
Wastewater Treatment Works
![](https://waterprojectsonline.com/wp-content/uploads/article_photos/2007/2007-Stirling.jpg)
Stirling WwTW (2007)
Site clearance & plant diversions prior to SBR installation
Wastewater Treatment and Sewerage
Wastewater Treatment Works
![](https://waterprojectsonline.com/wp-content/uploads/article_photos/2007/2007-Tobermory.jpg)
Tobermory STW (2007)
£6.8m provides new wastewater, collection, transfer & treatment
Sewers
Wastewater Treatment and Sewerage
Wastewater Treatment Works
![](https://waterprojectsonline.com/wp-content/uploads/article_photos/2006/2006-Alnwickhill.jpg)
Alnwickhill Clearwater Tanks (2006)
Rectifying low-level bacterial failures
Water Treatment and Supply
Water Treatment Works
![](https://waterprojectsonline.com/wp-content/uploads/article_photos/2006/2006-Alva.jpg)
Alva WwTW (2006)
Final cost achieved £1.836m opposed to Capital provision £3.2m
Wastewater Treatment and Sewerage
Water Treatment and Supply
![](https://waterprojectsonline.com/wp-content/uploads/article_photos/2006/2006-Drum-Vacuum.jpg)
Drum Vacuum Sewerage Scheme (2006)
First time scheme for rural community
Sewers
Wastewater Treatment and Sewerage
![](https://waterprojectsonline.com/wp-content/uploads/article_photos/2006/2006-Glasgow-Strategic-drainage.jpg)
Glasgow Strategic Drainage Plan (2006)
Dealing with the legacy and providing for the future
Sewer Flood Alleviation
Wastewater Treatment and Sewerage
![](https://waterprojectsonline.com/wp-content/uploads/article_photos/2006/2006-Granish-aviemore.jpg)
Granish (Aviemore) WwTW (2006)
£7m allocated for new works in top tourist area
Wastewater Treatment and Sewerage
Wastewater Treatment Works
![](https://waterprojectsonline.com/wp-content/uploads/article_photos/2006/2006-Methlick.jpg)
Methlick WwTW (2006)
Providing new WwTW with minimum disruption
Wastewater Treatment and Sewerage
Wastewater Treatment Works
![](https://waterprojectsonline.com/wp-content/themes/wpo-2023/images/post-type-default-image.png)
Pitscottie WwTW (2006)
Underground SAF solves rural WwTW problem
Wastewater Treatment and Sewerage
Wastewater Treatment Works
![](https://waterprojectsonline.com/wp-content/uploads/article_photos/2006/2006-Rosebery.jpg)
Rosebery WTW (2006)
£8.6m budgeted project at critical works
Water Treatment and Supply
Water Treatment Works
![](https://waterprojectsonline.com/wp-content/uploads/article_photos/2006/2006-Royal-Mile.jpg)
Royal Mile (Edinburgh) Mains Rehabilitation (2006)
Water mains renewals – a challenge in historic centre
Pipelines
Water Treatment and Supply
![](https://waterprojectsonline.com/wp-content/uploads/article_photos/2006/2006-Thurso.jpg)
Thurso WwTW (2006)
£12.56m project completed within 14 months – under budget
Wastewater Treatment and Sewerage
Wastewater Treatment Works
![](https://waterprojectsonline.com/wp-content/uploads/article_photos/2005/2005-Dunoon.jpg)
Dunoon WwTW (2005)
£18m scheme aids SW’s operational & environmental objectives
Wastewater Treatment and Sewerage
Wastewater Treatment Works
![](https://waterprojectsonline.com/wp-content/uploads/article_photos/2005/2005-Lochgoilhead.jpg)
Lochgoilhead WwTW (2005)
£1.9m scheme to protect the environment
Wastewater Treatment and Sewerage
Wastewater Treatment Works
![](https://waterprojectsonline.com/wp-content/uploads/article_photos/2005/2005-Packaged-Membranes-plant.jpg)
Packaged Membranes Plant (2005)
Fyne membrane plant in a pre-fab building speeds installation
Water Treatment and Supply
![](https://waterprojectsonline.com/wp-content/uploads/article_photos/2005/2005-Phillipshill.jpg)
Phillipshill WwTW (2005)
Increasing treatment capacity & curing overloading problems
Wastewater Treatment and Sewerage
Wastewater Treatment Works
![](https://waterprojectsonline.com/wp-content/themes/wpo-2023/images/post-type-default-image.png)
Rosebery WTW (2005)
Intensified DAF process helps increase capacity
Water Treatment and Supply
Water Treatment Works
![](https://waterprojectsonline.com/wp-content/uploads/article_photos/2005/2005-Tay.jpg)
Tay WwTW (2005)
Ensuring estuary bound effluent meets new SEPA requirement
Wastewater Treatment and Sewerage
Wastewater Treatment Works
![](https://waterprojectsonline.com/wp-content/uploads/article_photos/2004/2004-Glasgow-Strategic-.jpg)
Glasgow Strategic Drainage Plan (2004)
Study to end flooding, improve environment & amenities
Sewer Flood Alleviation
Wastewater Treatment and Sewerage
![](https://waterprojectsonline.com/wp-content/uploads/article_photos/2004/2004-Invercannie-.jpg)
Invercannie WTW (2004)
£10.5m membrane plant improves Aberdeen water quality
Water Treatment and Supply
Water Treatment Works
![](https://waterprojectsonline.com/wp-content/uploads/article_photos/2004/2004-Linwood.jpg)
Linwood & Johnstone WwTW (2004)
£20.6m aids Scottish Water’s operational & environmental objectives
Wastewater Treatment and Sewerage
Wastewater Treatment Works
![](https://waterprojectsonline.com/wp-content/uploads/article_photos/2004/2004-Out-Skerries.jpg)
Out Skerries WTW (2004)
Tough challenge on remote Scottish Island
Water Treatment and Supply
Water Treatment Works
![](https://waterprojectsonline.com/wp-content/uploads/article_photos/2004/2004-Wick.jpg)
Wick WwTW (2004)
First time WwTW on exposed headland for Highland town
Wastewater Treatment and Sewerage
Wastewater Treatment Works
![](https://waterprojectsonline.com/wp-content/uploads/article_photos/2003/2003-Cromarty-v2.jpg)
Cromarty & Gairloch Drainage Schemes (2003)
Scottish Water brings high-tech to the Highlands
Wastewater Treatment and Sewerage
Wastewater Treatment Works
![](https://waterprojectsonline.com/wp-content/uploads/article_photos/2003/2003-Esk-Valley-v2.jpg)
Esk Valley CSOs (2003)
Major scheme to improve quality of water courses, access areas
Sewer Flood Alleviation
Sewers
Wastewater Treatment and Sewerage
![](https://waterprojectsonline.com/wp-content/uploads/article_photos/2003/2003-Loch-Katrine-and-Loch-Lomond-v2.jpg)
Loch Katrine & Loch Lomond Pilot Plants (2003)
Investigating feasibility of blending waters of two lochs
Water Treatment and Supply
Water Treatment Works
![](https://waterprojectsonline.com/wp-content/uploads/article_photos/2003/2003-Munlochy-v2.jpg)
Munlochy & Avoch STW (2003)
Upgrade & remediation of Scottish Highland RBC plant
Wastewater Treatment and Sewerage
Wastewater Treatment Works
![](https://waterprojectsonline.com/wp-content/uploads/article_photos/2003/2003-North-Coast-regional-v2.jpg)
North Coast Regional Scheme (2003)
£28.5 regional scheme improves water quality in NE corner of UK
Pipelines
Water Treatment and Supply
Water Treatment Works
![](https://waterprojectsonline.com/wp-content/uploads/article_photos/2002/aberdeen_2002.jpg)
Aberdeen Nigg STC (2002)
Large thermal hydrolysis plant for Nigg STC
Renewable Energy
Sludge Treatment
Thermal Hydrolysis
Wastewater Treatment and Sewerage
Wastewater Treatment Works
![](https://waterprojectsonline.com/wp-content/uploads/article_photos/2002/auchneel_2002.jpg)
Auchneel WTW (2002)
Auchneel WTW is situated just to the north west of Stranraer and treats soft upland waters from three reservoirs, Upper and Lower Dindinnie and Knockquhassan Reservoirs
Water Treatment and Supply
Water Treatment Works
![](https://waterprojectsonline.com/wp-content/uploads/article_photos/2002/benbecula_2002.jpg)
Benbecula STW (2002)
New STW & sewerage for Scots island township
Sewers
Wastewater Treatment and Sewerage
Wastewater Treatment Works
![](https://waterprojectsonline.com/wp-content/uploads/article_photos/2002/coastal_communities_2002.jpg)
Coastal Communities Stormwater Management (2002)
Storm water management in small west coast communities
Sewers
Wastewater Treatment and Sewerage
![](https://waterprojectsonline.com/wp-content/uploads/article_photos/2002/cramond_2002.jpg)
Cramond Wastewater Improvement Scheme (2002)
£4.5m project to end untreated discharge into Firth of Forth
Sewers
Wastewater Treatment and Sewerage
![](https://waterprojectsonline.com/wp-content/uploads/article_photos/2002/rural_2002.jpg)
Forth Valley Rural WTW (2002)
Remote rural WTWs using membrane plants
Water Treatment and Supply
Water Treatment Works
![](https://waterprojectsonline.com/wp-content/uploads/article_photos/2002/inverness_2002.jpg)
Inverness WTW (2002)
New ultra filtration process provides cryptosporidium barrier
Water Treatment and Supply
Water Treatment Works
![](https://waterprojectsonline.com/wp-content/uploads/article_photos/2002/katrine_2002.jpg)
Katrine Water Supply Project (2002)
£100m ‘flagship’project to upgrade water supply for 700,000
Water Treatment and Supply
Water Treatment Works
![](https://waterprojectsonline.com/wp-content/uploads/article_photos/2002/kirkwall_2002.jpg)
Kirkwall WwTW (2002)
Novel SBR system for Orkney Island plant
Wastewater Treatment and Sewerage
Wastewater Treatment Works
![](https://waterprojectsonline.com/wp-content/uploads/article_photos/2002/meadowhead_2002.jpg)
Meadowhead, Stevenston & Inverclyde STWs (2002)
Three sewage treatment plants come on line in one single project
Wastewater Treatment and Sewerage
Wastewater Treatment Works
![](https://waterprojectsonline.com/wp-content/uploads/article_photos/2002/moray_2002.jpg)
Moray Watewater Project (2002)
£60m capital investment in the far north of Scotland
Wastewater Treatment and Sewerage
Wastewater Treatment Works
![](https://waterprojectsonline.com/wp-content/uploads/article_photos/2002/pathogen_2002.jpg)
Pathogen Protection at Groundwater Sources (2002)
Pathogen protection using ultrafiltration at rural ground water supply
Raw Water Source
Water Treatment and Supply
Water Treatment Works
![](https://waterprojectsonline.com/wp-content/uploads/article_photos/2002/penicuik_2002.jpg)
Penicuik WwTW (2002)
Extension/upgrade presented many challenges
Wastewater Treatment and Sewerage
Wastewater Treatment Works
![](https://waterprojectsonline.com/wp-content/uploads/article_photos/2002/stirling_2002.jpg)
Stirling WwTW (2002)
New pumping station & associated works
Wastewater Treatment and Sewerage
Wastewater Treatment Works