Search
Nominate/Submit Case Studies
Job Board
Clarifier and CoMagĀ® tank precast installation - Courtesy of Glanua
Blackburn Meadows STW (2024)
Drone photograph of completed site (May 2024) - Courtesy of DAWSON-WAM Ltd
Lower Woodburn WwPS (2024)
Burnley WwTW Catchment Strategy (2023)
Glenboi Flood Alleviation Project (2023)
Ards North Wastewater Improvement Scheme (2023)
Stroud Sewerage Strategy Project: Part 2 (2023)
Sherston S101a – First Time Sewerage Scheme (2023)
Stratton SPS to Helebridge STW Rising Main (2023)
Guildford STW (2023)
Marhamchurch SPS (2023)
Thankes Park Sewage Pumping Station (2023)
Detention tank shaft construction: (left) jacking ring and (right) roof beams installation - Courtesy of United Utilities
High Frequency Risk Reduction: Rock View (2022)
Stroud Sewerage Strategy Project: Part 1 (2022)
Aerial view of the Blackburn Nereda plant and tertiary treatment plant at Blackburn WwTW - Courtesy of United Utilities
Blackburn and Darwen WwTWs (2022)
Burnley WwTW: integration of new works into constrained site including earth bund of excavated material - Courtesy of United Utilities & Advance-plus
Burnley WwTW Catchment Strategy (2022)
3 (No.) 1.27MVA generators and transformer kiosk - Courtesy of Arup
Cardiff Western District SPS (2022)
SWELL – Strabane WwTW (2021)
SWELL – Newpoint Terminal WwPS (2021)
SWELL – Shared Waters Enhancement & Loughs Legacy Project (2021)
Telscombe Lower Portobello PS & Screening Works (2021)
Blackburn and Darwen WwTWs (2021)
Tideway East – TBM Delivery (2021)
Ringsend Main Lift Pumping Station (2021)
Tideway Central – Watertightness Testing (2021)
Burnley WwTW Catchment Strategy (2021)
West Huntspill WRC Bathing Waters Improvements (2021)
Tideway Central – Albert Embankment Foreshore (2021)
Tideway Central – Main Tunnel Primary Lining (2021)
Tideway Central – Main Tunnel Secondary Lining (2021)
Tideway Central – Junctions (2021)
Tideway Central – Blackfriars Bridge Foreshore (2021)
Tideway Central – Falconbrook PS CSO Shaft (2021)
Tideway Central – Vortex Pipes (2021)
Walton S101a – First Time Sewerage Connection (2021)
Wolsingham STW (2021)
Tideway Central – Falconbrook Pumping Station (2020)
Counters Creek Flood Alleviation Scheme (2020)
Tideway Central – Marine Works (2020)
Tideway Central – Chelsea Embankment Foreshore (2020)
Tideway Central – Albert Embankment Foreshore (2020)
Blackburn and Darwen WwTWs (2020)
Northumberland & Halfway SPS (2020)
Portaferry Road Newtownards Wastewater Pumping Station (2020)
Oldham & Royton Integrated Strategy (ORIS) (2020)
Nottingham, Shakespeare Street, Flood Alleviation (2020)
Zouch S101a – First Time Sewerage Scheme (2020)
Cropwell Bishop STW (2019)
Kiln Road Sewage Pumping Station (2019)
Anchorsholme Outfall Pumping Station (2019)
Rennyā€™s Lane Foul Sewer Rising Main Replacement (2019)
Tideway East – Hydraulic Modelling (2019)
Blackburn and Darwen WwTWs (2019)
Barston STW (2019)
Quay Road Charlestown DG5 Flooding Scheme (2019)
Ardersier WwTW (2019)
Stocksbridge WwTW (2019)
Tideway West – Hammersmith PS (2019)
Crankley Point Terminal Pumping Station (2019)
Sheet piled cofferdam for open-dig section of 1200mm combined sewer and 900mm overflow pipelines - Courtesy of DAWSON-WAM Ltd
Ormeau Avenue Sewerage Upgrade (2019)
Stromness Wastewater Network (2019)
Barnby Moor SPS (2013)
Bewsey Bridge SPS (2013)
Benone Area Sewerage Scheme (2013)
Briton Ferry FAS (2013)
Eltham Road SPS & Rising Main (2013)
Hartridge UID Scheme (2013)
(top left) the existing Canklow regulator gate (bottom left) 3D model of the new Canklow Regulator and (right) bathymetry of Woodhouse Mill Washland - Courtesy of JBA-Bentley
Seaham SPS (2013)
Sewage Pumping Station Programme (2014)
Preston 7 UIDs (2014)
Newry Road Wastewater Pumping Station (2014)
Wastewater Pumping Stations Upgrade Project (2014)
Harlow Network Upgrade (2014)
Ellen’s Green Sewage Pumping Station (2014)
Eastney Pumping Station (2014)
Drumbeg Drive Wastewater Pumping Station (2014)
Abbey Mills Pumping Station (2014)
Ardbeg & Port Bannatyne Sewerage Scheme (2012)
Carmarthen Wastewater Improvement Scheme (2012)
Langdon Road Sewage Pumping Station (2012)
Rowden Road Sewage Pumping Station (2012)
Yorkshire Water rBWD – Scarborough WwTW (2012)
Whitehead, Ballcarry & Ballystruder Rationalisation (2012)
Thames Tideway Tunnel – Overview (2015)
Swindon STW Network & Growth Upgrade Project (2015)
Private Drain & Sewers (2015)
Ravenfield Sewage Pumping Station (2015)
Portsmouth FAS – Early Warning Scheme (2015)
Lee Tunnel – Tideway Pumping Station (2015)
Ash Lane Detention Tank (2015)
Annagher Wastewater Pumping Station (2015)
Precast Sewage Pumping Station Programme (2011)
Loch Ryan Wastewater Treatment Scheme (2011)
Llangadfan Catchment Pumping Stations (2011)
Leamington Sewerage Strategy (2011)
Gobowen Pumping Station & Rising Main (2011)
Ashton Avenue Pumping Station (2011)
Northumberland Avenue SPS (2010)
Canterbury Sewerage Scheme (2010)
Eastney Pumping Station (2010)
Steynton (Merlins Bridge) Pumping Station (2009)
(top left) the existing Canklow regulator gate (bottom left) 3D model of the new Canklow Regulator and (right) bathymetry of Woodhouse Mill Washland - Courtesy of JBA-Bentley
Kenilworth Sewerage Strategy (2009)
North Coast Wastewater Treatment Scheme (2008)
North Kessock Wastewater Transfer Scheme (2008)
New Romney & Greatstone First Time Sewerage Scheme (2007)
(top left) the existing Canklow regulator gate (bottom left) 3D model of the new Canklow Regulator and (right) bathymetry of Woodhouse Mill Washland - Courtesy of JBA-Bentley
North Coast Wastewater Treatment Scheme (2006)
Slapton & Torcross STW (2005)
Trent Vale Pumping Station (2005)
Sewage Pumping Station Programme (2005)
Linton Falls Sewage Pumping Station (2005)
Darlington (Victoria Road) CSO (2005)
Teign Estuary CSOs (2004)
Radipole Sewage Pumping Station (2004)
(top left) the existing Canklow regulator gate (bottom left) 3D model of the new Canklow Regulator and (right) bathymetry of Woodhouse Mill Washland - Courtesy of JBA-Bentley
Abbey Mills Pumping Station (2004)
Taw Torridge STW (2003)
Lytchett Minster STW (2003)
Cawood, Kellfield & Wistow Sewage Treatment Scheme (2003)
Hornsea & Mappleton UWwTD Schemes (2002)
Holybourne Pumping Station (2002)
Rye Meads STW – Storm Pumping Station (2002)
Royal Oak Pumping Station (2002)
Blackpool South Surface Water Strategy (2018)
Galgorm Wastewater Pumping Station Upgrade (2018)
Nine Elms, Battersea Growth & SuDS (2018)
Pebworth-Long Marston-Stratford upon Avon Transfer (2018)
Tideway Central – Overview (2018)
Margate & Broadstairs Wastewater Pumping Stations (2017)
Littlemore Sewage Pumping Station (2017)
Flamborough Head Sewage Pumping Station (2017)
Bynea Sewage Pumping Station (2017)
Tideway Central – Vessel Relocation (2017)
Bristol Road Sewer Pumping Station (2017)
Highbridge SPS Stormwater UV Disinfection (2016)
Tideway East – Challenges (2016)
Sotshole (Heage) Sewage Pumping Station (2016)
Botley Park Trunk Sewer (2016)
Gloves Lane (Blackwell) Terminal Pumping Station (2016)
Lee Tunnel – Introduction (2011)