Severn Trent
Severn Trent supplies water to 7.4 million people, and sewerage services to 8.5 million people over an area of 21,000 square kilometres in central England and mid-Wales.
The company operates 181 water treatment works and 1,017 sewage treatment works and has 46,000 km of water mains and 54,000 km of sewers. Every day the company supplies approximately 1,900 million litres of water, and treats around 2,500 million litres of wastewater.
Lower Gornal STW (2024)
Tertiary treatment upgrades implemented to achieve tightened phosphorus and ammonia consents
Wastewater Treatment and Sewerage
Monkmoor STW (2024)
UK’s first large-scale installation of MABR technology to enhance ammonia removal
Wastewater Treatment and Sewerage
Newthorpe STW (2024)
Improving sustainability & resilience of sewage treatment in the Erewash Valley
Wastewater Treatment and Sewerage
Witches Oak Raw Water Pumping Station (2024)
Severn Trent’s Green Recovery Programme: combining natural solutions with conventional infrastructure
River Work
Water Treatment and Supply
Finham Advanced Anaerobic Digestion (2023)
Finham STW, situated near Coventry in the West Midlands, is Severn Trent’s fifth largest wastewater treatment works and treats over 115 megalitres of effluent a day from half a million people. The works processes indigenous sludge on site as well as accepting exports from local, satellite sites, producing final effluent, ‘cake’ and biogas as outputs. […]
Renewable Energy
Wastewater Treatment and Sewerage
Cannock STW (2022)
Enhanced river quality by utilising CoMag® ballasted enhanced settlement technology to remove phosphorus
Wastewater Treatment and Sewerage
Stoke Bardolph STW - Anaerobic Digestion (2022)
Stoke Bardolph Sewage Treatment Works (STW) is Severn Trent’s second largest STW and serves a population of c. 620,000. The site is also a major regional sludge centre, meaning it takes a high volume of sludge imports from other sites in the region. Stoke Bardolph has a sludge treatment capacity equivalent to a population of […]
Renewable Energy
Wastewater Treatment and Sewerage
Strongford STW - THP & LTP (2022)
Strongford STW is a major sewage treatment works serving the population equivalent of circa 350,000 from Newcastle-under-Lyme and Stoke-on-Trent. The site’s sludge treatment facility provides a major centre for regional operations. Based on a forecast increase in population, it was identified that an increase in treatment capacity would be required to accommodate the local growth. […]
Renewable Energy
Wastewater Treatment and Sewerage
Brancote Sludge Treatment Centre (2020)
Located to the east of Stafford, Severn Trent’s Brancote Sewage Treatment Works (STW) catchment will see an increase in population from 78,075 current population equivalent (PE) to 85,532 by 2028. The site is split into two distinct areas with the STW processing the sewage flows from within its own catchment and the sludge treatment centre […]
Renewable Energy
Wastewater Treatment and Sewerage
Newark Waste and Water Improvement Project (2020)
Severn Trent have made a £60m investment in Newark-on-Trent upgrading the sewers and water supply network throughout the town. The project provided relief to some 400 homes and businesses from sewer flooding, and provided a robust water supply system which will serve the town for many years to come. The project included a 2.8km segmental […]
Wastewater Treatment and Sewerage
Water Treatment and Supply
Coleshill FWAD Biomethane Scheme (2019)
The Coleshill Food Waste Anaerobic Digestion Plant processes 48,500 tonnes per annum of food waste collected generally within 30 miles of the site. The site has been in continuous operation since January 2015 when it first received commercial customers. It is currently estimated that this project can deliver 5.5GWh per annum (electrical equivalence) of new […]
Renewable Energy
Wastewater Treatment and Sewerage
Strongford STW - THP (2018)
Strongford STW is located at the north west end of Severn Trent’s region and covers a significant catchment in and around Stoke-on-Trent with a population equivalent of 350,000. The Strongford digestion plant currently processes 34 tonnes dry solid per day (tds/day) indigenous; and 14 tds/day liquid imports which includes 7 tds/day from the recently closed […]
Renewable Energy
Wastewater Treatment and Sewerage
Coningswath Road (Carlton) FAS (2015)
£2.3m project to alleviate foul and surface water sewer flooding
Wastewater Treatment and Sewerage
Hulland Ward STW (2015)
Installation of a constructed wetland as a full treatment facility using the Phragmifiltre® system
Wastewater Treatment and Sewerage
Minworth STW - Biomethane Injection Plant (2015)
Improving the efficiency of energy generation from sewage sludge by cleaning and injecting biogas into the National Grid network
Renewable Energy
Wastewater Treatment and Sewerage
Private Drain & Sewers (2015)
Delivering upgrades to pumping stations in preparation for legislation change in 2016
Wastewater Treatment and Sewerage
Ravenfield Sewage Pumping Station (2015)
A complete overhaul of an operational site on time, on budget and with zero defects
Wastewater Treatment and Sewerage
Billesdon (Church St) FAS (2014)
An acrylic polymer injection system was utilized in areas of running sand to improve ground conditions
Wastewater Treatment and Sewerage
e5 Programme - Clay Mills STW (2014)
Optimising the sludge treatment facilities with an innovative ‘bagel’ acid phase digester
Renewable Energy
Wastewater Treatment and Sewerage
Cressbrook STW (2014)
A technically challenging project, with significant ecological, environmental and geographic constraints
Wastewater Treatment and Sewerage
Derwent Valley Aqueduct (2014)
Delivering resilience to Severn Trent Water’s strategic grid
Water Treatment and Supply
Edale STW (2014)
Reducing the impact of a large tourist population whilst ensuring that consent was not compromised
Wastewater Treatment and Sewerage
Emergency UV Treatment Plant (2014)
Standardised modular approach to UV disinfection
Water Treatment and Supply
Hassop Sewerage Scheme (2014)
First time sewerage within the Derbyshire village including gravity sewers and a new RBC treatment plant
Wastewater Treatment and Sewerage
Shelton WTW UV Scheme (2014)
Standardised modular approach to UV disinfection
Water Treatment and Supply
e5 Programme - Strongford STW (2014)
Restoring digestion efficiency and achieve phosphorus permit compliance
Wastewater Treatment and Sewerage
e5 Programme - Wanlip STW - Sludge Project (2014)
New sludge digestion facility with an increased treatment capacity
Wastewater Treatment and Sewerage
Welshpool STW (2014)
Reducing risk and maximising the gains of innovation in the delivery of a new oxidation ditch plant
Wastewater Treatment and Sewerage
Armthorpe STW (2013)
IFAS process within an existing structure removed the need for extensive new build
Wastewater Treatment and Sewerage
Barnby Moor SPS (2013)
Refurbishing an existing asset that had reached the end of its working life presented a number of core challenges
Wastewater Treatment and Sewerage
Birdlip STW (2013)
Construction upgrade encompassing the installation of new RBC and aerated reed beds in Gloucestershire
Wastewater Treatment and Sewerage
Birmingham Water Treatment (2013)
Ensuring Birmingham’s water supply is always on and good to drink
Water Treatment and Supply
e5 Programme - Clay Mills STW (2013)
Innovative approach to design and construction of the new Bio-P activated sludge plant
Wastewater Treatment and Sewerage
Coventry Road (Hinckley) FAS (2013)
Large scale initiative of advance customer communication & stakeholder management is key to success
Wastewater Treatment and Sewerage
Hassop WwTW (2013)
A new single-piece plant to meet Severn Trent Water’s extremely stringent requirements
Wastewater Treatment and Sewerage
e5 Programme - Rushmoor STW (2013)
An e5 alliance major projects programme scheme to upgrade the existing sewage treatment works
Wastewater Treatment and Sewerage
e5 Programme - Stoke Bardolph STW - Phosphorus Removal (2013)
A holistic approach to meet future phosphorus consents
Wastewater Treatment and Sewerage
Bamford WTW (2012)
An innovative and considerate treatment enhancements project to maintain water quality
Water Treatment and Supply
Coalport STW (2012)
Primary treatment and activated sludge plant improvements
Wastewater Treatment and Sewerage
Coundon Reservoir (2012)
A reservoir within a reservoir to improve Coventry’s water quality
Water Treatment and Supply
e5 Programme - Major Projects Overview (2012)
Severn Trent Water’s innovative programme delivery models
Wastewater Treatment and Sewerage
Minworth STW - Anammox Plant (2012)
The first UK Anammox® plant to yield an environmentally friendly biological phosphorous solution
Wastewater Treatment and Sewerage
Willenhall UID (2012)
Major water quality improvements to the River Tame catchment, focusing on innovation and sustainability
Wastewater Treatment and Sewerage
Derwent Valley Aqueduct (2011)
Improving resilience of the Severn Trent Water strategic supply grid
Water Treatment and Supply
Gobowen Pumping Station & Rising Main (2011)
New sewage pumping station and rising main increases capacity and reliability
Wastewater Treatment and Sewerage
Leamington Sewerage Strategy (2011)
Strategic project to increase capacity, alleviate the risk of sewer flooding & improve water quality
Wastewater Treatment and Sewerage
Llangadfan Catchment Pumping Stations (2011)
New pumping stations and mains to replace an outdated system in mid-Wales
Wastewater Treatment and Sewerage
Meden Vale FAS (2011)
Innovative techniques and products reduce flooding, and health, safety & environmental risks
Wastewater Treatment and Sewerage
Minworth STW - Sludge Dewatering (2011)
An environmentally friendly revenue stream for Severn Trent Water
Wastewater Treatment and Sewerage
Minworth STW - Sludge Screening Efficiency (2011)
S:Max installation to increase sludge screening efficiency
Wastewater Treatment and Sewerage
River Tame UPMs (2010)
Foxton Road & Sir Johns Road CSOs – working to deliver innovative solutions
Wastewater Treatment and Sewerage
Frankley WTW (2009)
Quality water for Birmingham delivered through teamwork
Water Treatment and Supply
Kenilworth Sewerage Strategy (2009)
Sewerage strategy to remove flooding from different sources
Wastewater Treatment and Sewerage
Minworth STW - Upgrade: Part 3 (2009)
£145 million upgrade – A Beacon Project for the Capital Delivery Programme
Wastewater Treatment and Sewerage
Loughborough STW (2008)
Activated sludge plant conversion & capital maintenance
Wastewater Treatment and Sewerage
Minworth STW - Upgrade: Part 2 (2008)
Collaborative alliance drives value & programme
Wastewater Treatment and Sewerage
Scunthorpe (Ashby South Grange) UID (2008)
Two key CSO overflows that had UID’s within catchment
Wastewater Treatment and Sewerage
Strongford STW (2008)
Submerged aerated filter looking after the past, the present & the future
Wastewater Treatment and Sewerage
Derby STW Sludge Digestion (2007)
Extension to sludge digestion facilities
Renewable Energy
Wastewater Treatment and Sewerage
Hallam Fields STW Endocrine Investigation (2007)
Endocrine Disrupting Chemicals (EDC) scale pilot plants in Ilkeston, Derbyshire
Wastewater Treatment and Sewerage
Minworth STW - Upgrade: Part 1 (2007)
£100m upgrading scheme for Severn Trent’s largest STW
Wastewater Treatment and Sewerage
Stanton by Bridge Booster Pumping Station (2007)
Treated water and chlorination AMP4 improvements
Water Treatment and Supply
Stoke on Tern WTW (2007)
Installation of new nitrate treatment plant
Water Treatment and Supply
Wanlip STW (2007)
£58m investment by Severn Trent Water
Wastewater Treatment and Sewerage
Buxton STW (2006)
Demolition of decommissioned STW & land reinstatement
Wastewater Treatment and Sewerage
Coleshill & Roundhill Incinerator Upgrades (2006)
Upgrade to meet waste incineration directive
Wastewater Treatment and Sewerage
Evesham STW (2006)
Phosphorus removal and tertiary treatment plant
Wastewater Treatment and Sewerage
Llanwrin WTW (2006)
Replacement disinfection scheme
Water Treatment and Supply
Milford & Bednall WTW (2006)
Iron and manganese removal scheme
Water Treatment and Supply
Monkmoor STW (2006)
£11.7m scheme upgrades performance of STW for Shrewsbury
Wastewater Treatment and Sewerage
Stoke UIDs (2005)
‘No dig’ methods reduced impact on local community
Wastewater Treatment and Sewerage
Trent Vale Pumping Station (2005)
Part of UID AMP3 solutions in Stoke-on-Trent
Wastewater Treatment and Sewerage
Buxton STW (2004)
New £12.5m Membrane Bio-reactor to meet Fisheries consent
Wastewater Treatment and Sewerage
Hartshill WwTW (2004)
£6.5m project to renew, expand & meet new ammonia consent
Wastewater Treatment and Sewerage
Melbourne WTW (2004)
Rising mains renewal after several bursts
Water Treatment and Supply
Packington STW (2004)
New oxidation ditches and inlet works
Wastewater Treatment and Sewerage
Sludge Dewatering Programme (2004)
Delivery of sludge dewatering plant projects – Severn Trent Water’s AMP3 Programme
Wastewater Treatment and Sewerage
Stoke UIDs (2004)
A collaborative approach to delivery
Wastewater Treatment and Sewerage
Worksop STW (2004)
Phosphorus removal & tertiary treatment plant
Wastewater Treatment and Sewerage
Worksop STW Sludge Dryer (2004)
£3 million ‘Centridry’ plant is first in the UK
Wastewater Treatment and Sewerage
Bamford WTW (2003)
Major asset renewal & quality improvements at key WTW
Water Treatment and Supply
Bewdley Sewer Diversion - Phase 1A (2003)
Sewer diversion works for Phase 1 EA scheme
Wastewater Treatment and Sewerage
Church Wilne & Campion Hills WTW (2003)
Water quality improvements at major works
Water Treatment and Supply
Derby STW (2003)
New works for old to serve PE of 500,000
Wastewater Treatment and Sewerage
Small STWs Programme (2003)
Delivery of small sewage treatment works projects
Wastewater Treatment and Sewerage
Whitacre High Life Pumping Station (2003)
Automation maintains city water reserves at precise levels
Water Treatment and Supply
Cryptosporidium Barrier (2002)
Improving water quality at groundwater sources
Water Treatment and Supply
Enhanced Water Treatment Project (2002)
Severn Trent develop arsenic removal technology for boreholes
Water Treatment and Supply
Flow Measurement at Sewage Treatment Works (2002)
Ensuring accuracy to meet standards & requirements
Wastewater Treatment and Sewerage
Meriden to Highters Heath Main (2002)
27km link main Meriden to Highters Heath
Water Treatment and Supply