Search
Water Companies
Water & Wastewater
Water Supply Only
Flood Protection & Alleviation
Other
Case Studies
Wastewater Treatment & Sewerage
Water Treatment & Supply
Flood Alleviation
Renewable Energy
River Work
Energy Management
Industrial
Innovations
Process Plant & Equipment
Process Technologies
Smart Systems/Optimisation
Supply Chain
Civil Engineering
Consultants
Plant & Equipment
Process Engineering
Digital Flipbooks
Jobs Board
Civil Engineering
MEICA
Process/Chemical
Water Resources
Mini Case Studies
Company News
Login
Sign In
Sign Up
Nominate/Submit Case Studies
Become a Featured Company
Job Board
Case Study Category:
Wastewater Treatment and Sewerage
Waterworks Bridge Reconstruction (2019)
Paisley Tunnel Project (2019)
Thanet Sewer Rehabilitation Scheme – Phase 2 (2019)
Cropwell Bishop STW (2019)
Earl Shilton STW (2019)
Kiln Road Sewage Pumping Station (2019)
Coleshill FWAD Biomethane Scheme (2019)
Codsall STW (2019)
Scaynes Hill WwTW (2019)
Anchorsholme Outfall Pumping Station (2019)
Gulson Road (Coventry) Sewer Diversion (2019)
Medlock Quality Programme (2019)
Inverurie WwTW (2019)
Renny’s Lane Foul Sewer Rising Main Replacement (2019)
Goscote STW (2019)
Tideway East – Hydraulic Modelling (2019)
Davyhulme WwTW Modernisation Project (2019)
Walsall Wood STW (2019)
Slimbridge Infiltration Reduction (2019)
Blackburn and Darwen WwTWs (2019)
Barston STW (2019)
Quay Road Charlestown DG5 Flooding Scheme (2019)
Ardersier WwTW (2019)
Stocksbridge WwTW (2019)
Flass Vale (Durham) Sewerage Scheme (2019)
Woolston WwT Scheme – Part 4 (2019)
Kendal WwTW (2019)
Tideway West – Hammersmith PS (2019)
Crankley Point Terminal Pumping Station (2019)
Uttoxeter STW (2019)
Boughton STW (2019)
Pegswood STW (2019)
Ingoldisthorpe Water Recycling Centre (2019)
Alum Waters Sewer Flooding Alleviation Scheme (2019)
Morecambe WwTW Catchment Strategy: Part 2 (2019)
Ormeau Avenue Sewerage Upgrade (2019)
Minworth STW – Curdworth Sludge Lagoons (2019)
Finham STW Activated Sludge Plant (2019)
Mansfield, Gunthorpe Court, Flood Alleviation (2019)
Queens Bridge Siphons (2019)
Stromness Wastewater Network (2019)
Knostrop Sludge Treatment Facility (2019)
Rothera Research Station (Antarctica) WwTW (2019)
Acklam Road Screening Structure (2013)
Barnby Moor SPS (2013)
Armthorpe STW (2013)
Beckton STW (2013)
Begelly & Kilgetty FAS (2013)
Beachley Sewerage Scheme (2013)
Bewsey Bridge SPS (2013)
Benone Area Sewerage Scheme (2013)
Bellozanne STW – Sludge Treatment (2013)
Birdlip STW (2013)
Bloomfield Road (Blackpool) Tunnel Sleeving (2013)
Blackburn Meadows WwTW – Bio-Energy Digester (2013)
Brighton & Hove WwTW (2013)
Briton Ferry FAS (2013)
Chilthorne Domer STW (2013)
e5 Programme – Clay Mills STW (2013)
Coventry Road (Hinckley) FAS (2013)
Crossness STW (2013)
Cumbernauld SuDS (2013)
Cudworth WwTW (2013)
Specification for SuDS (2013)
River Rangers (2013)
Davyhulme WwTW (2013)
Deephams STW – Quality Upgrades (2013)
Dukinfield (Wharf Street) UIDs (2013)
Deephams STW – Innovations (2013)
Esholt WwTW – Bio-Energy Installation (2013)
Eltham Road SPS & Rising Main (2013)
Gowerton WwTW – Sea Outfall (2013)
Guernsey Airport Groundwater Improvement (2013)
Hassop WwTW (2013)
Hartridge UID Scheme (2013)
Holdenhurst STW – Inlet Works (2013)
Heswall WwTW – Shellfish Waters (2013)
Lampeter STW (2013)
Knightcott to Banwell (M5) Sewer Repair (2013)
Lee Tunnel – TBM Launch (2013)
Liverpool WwTW (2013)
Millom WwTW – Stormwater UV (2013)
Meadowhead & Stevenston Stormwater Transfer (2013)
Mogden STW (2013)
Newcastle WwTW (2013)
Nuns Moor Pilot Sustainability Study (2013)
Oxford STW – Thermal Hydrolysis Plant (2013)
Pennington WwTW (2013)
Poole STW – Inlet Works (2013)
Preston 32 UIDs (2013)
Rochdale AMP5 UIDs (2013)
River Medina Rising Main Crossing (2013)
Runcorn WwTW (2013)
e5 Programme – Rushmoor STW (2013)
Yorkshire Water rBWD – Scarborough WwTW (2013)
Phosphate Removal Batch Schemes (2013)
Seaham SPS (2013)
Shepton Mallet STW (2013)
e5 Programme – Stoke Bardolph STW – Phosphorus Removal (2013)
Trowbridge STW – Acid Phase Digestion Plant (2013)
Whitehaven (Parton) Long Sea Outfall (2013)
FFD Programme – Woodhouse Mill WwTW (2013)
Welshpool STW (2014)
Electro Scan (2014)
e5 Programme – Wanlip STW – Sludge Project (2014)
e5 Programme – Wanlip STW – Inlet Works (2014)
Walton-le-Dale WwTW (2014)
Phosphorus Removal AMP5 Programme (2014)
Lee Tunnel – TBM Drive & Tunnel Lining (2014)
Torbay Sewer Rehabilitation Scheme (2014)
Taunton STW (2014)
Swansea Bay WwTW (2014)
Swindon Networks Upgrade Project (2014)
e5 Programme – Strongford STW (2014)
Sutton WwTW (2014)
e5 Programme – Stoke Bardolph STW – Centrate Project (2014)
Singleton Park (Swansea) 5 CSOs Scheme (2014)
Sewage Pumping Station Programme (2014)
Saltney & Kinmel Bay Rising Main Replacements (2014)
SAL 172 Stormwater Storage: Part 1 (2014)
Preston 7 UIDs (2014)
Peel Common STW (2014)
Oxford STW – Sludge Stream Upgrade (2014)
Overseal STW (2014)
Newry Road Wastewater Pumping Station (2014)
Wastewater Pumping Stations Upgrade Project (2014)
Morestead Road (Winchester) WwTW (2014)
Mersey Valley Sludge Main River Irwell Crossing (2014)
Millbrook WwTW (2014)
Maida Vale FAS (2014)
Londonderry Drainage Area Plan Implementation (2014)
Liverpool WwTW (2014)
Llanelli – Retro Fit Green Infrastructure (2014)
Liverpool WwTW – Outfall Extension (2014)
Laigh, Shieldpark & Dalamarnock STWs -Bundle 25A (2014)
Keynsham Requisition Sewer (2014)
Knitsley STW (2014)
Kennington Road FAS (2014)
Huyton WwTW (2014)
Hassop Sewerage Scheme (2014)
Harlow Network Upgrade (2014)
Greenstreets at Counters Creek SuDS Retrofit Pilot Scheme (2014)
Glyncoed Terrace FAS (2014)
Fort Cumberland Storm Tank (2014)
Ellen’s Green Sewage Pumping Station (2014)
Eastney Pumping Station (2014)
Edale STW (2014)
Drumbeg Drive Wastewater Pumping Station (2014)
Cressbrook STW (2014)
Crossness STW – Architectural Design (2014)
Cowdenbeath Wetlands (2014)
Colchester Advanced Digestion Project (2014)
Clifton Rising Main (2014)
e5 Programme – Clay Mills STW (2014)
Chester Brick Sewer Rehabilitation (2014)
Budds Farm WwTW (2014)
Brighton & Hove WwTW (2014)
Bristol (Avonmouth) STW – Additional Screening (2014)
Yorkshire Water rBWD – Bridlington (2014)
Blackmill Rainscape Strategy Scheme (2014)
Blackburn WwTW UIDs (2014)
Blackburn UID Scheme (2014)
Beckton & Crossness THPs (2014)
Billesdon (Church St) FAS (2014)
Beckton & Crossness STWs (2014)
Barkers Haugh STW – Procurement & Construction (2014)
Barrow WwTW (2014)
Barkers Haugh STW – Concept & Planning (2014)
Bangor Sewerage Improvement Scheme (2014)
Alltwen-Pontardawe Combined Sewer River Crossing (2014)
Abbey Mills Pumping Station (2014)
Airdrie Environmental Project (2012)
Ardbeg & Port Bannatyne Sewerage Scheme (2012)
Basingstoke & Bracknell STWs – NVZ Schemes (2012)
Beckton STW – Upgrade (2012)
Beckton STW – Odour Control (2012)
Botany Bay Road Sewer Improvement Scheme (2012)
FFD Programme – Blackburn Meadows WwTW (2012)
Blackburn Meadows WwTW – Bio-energy Digester (2012)
Brighton & Hove WwTW (2012)
Botley Sewer Renewal (2012)
Burry Inlet Investigations (2012)
Buxton Critical Sewer Rehabilitation Scheme (2012)
Camberley, Chertsey & Crawley STWs – NVZ Schemes (2012)
Carmarthen Wastewater Improvement Scheme (2012)
Crossness STW (2012)
Crowlas Sewer Replacement (2012)
Coalport STW (2012)
Dunmurry WwTW (2012)
Five Fords WwTW (2012)
Deephams STW – Discfilters (2012)
Deephams STW – Phosphorus Removal (2012)
Esholt STW – Thermal Hydrolysis Plant (2012)
Howdon & Bran Sands STWs – AD Plants (2012)
Harlow Surface Water Flooding (2012)
Keady WwTW (2012)
Long Reach STW (2012)
Liverpool WwTW (2012)
Langdon Road Sewage Pumping Station (2012)
Minworth STW – Anammox Plant (2012)
Posts navigation
Previous page
Page
1
Page
2
Page
3
…
Page
5
Next page