Customize Consent Preferences

We use cookies to help you navigate efficiently and perform certain functions. You will find detailed information about all cookies under each consent category below.

The cookies that are categorized as "Necessary" are stored on your browser as they are essential for enabling the basic functionalities of the site. ... 

Always Active

Necessary cookies are required to enable the basic features of this site, such as providing secure log-in or adjusting your consent preferences. These cookies do not store any personally identifiable data.

No cookies to display.

Functional cookies help perform certain functionalities like sharing the content of the website on social media platforms, collecting feedback, and other third-party features.

No cookies to display.

Analytical cookies are used to understand how visitors interact with the website. These cookies help provide information on metrics such as the number of visitors, bounce rate, traffic source, etc.

No cookies to display.

Performance cookies are used to understand and analyze the key performance indexes of the website which helps in delivering a better user experience for the visitors.

No cookies to display.

Advertisement cookies are used to provide visitors with customized advertisements based on the pages you visited previously and to analyze the effectiveness of the ad campaigns.

No cookies to display.

Search
Nominate/Submit Case Studies
Job Board

MGF Ltd

Derby Hydro Power House

Design and support for a hydro power house and turbine chamber in centre of Derby

Courtesy of MGF Ltd

Scope of works

The purpose of the job was to design and supply temporary and permanent support for a hydro power house and turbine chamber (plus associated inlet channel and tailrace) constructed at the side of an existing weir on the banks of the River Derwent in the centre of Derby.

Issues & solutions

The design incorporated a single level of modular 406UC Hydraulic Brace system in conjunction with Larssen piles up to 10m in length, toed in mudstone, covering a perimeter of over 150m.

MGF’s design allowed early removal of the brace by using a permanent concrete base slab as a low propped cantilever. The design had to take into consideration the complicated construction sequence; and the location of a large crane during installation and removal of the river piles.

During the project Balfour Beatty and MGF collaborated to develop the Stairsafe system (the UK’s first temporary steel stair system designed specifically for excavations). The system proved a great success in providing rapid and safe access into excavations leading to greater site productivity. The system is now being used throughout the UK on excavations up to 6.5m in depth.

Courtesy of MGF Ltd

Courtesy of MGF Ltd

Project details

  • Sector: Energy & Waste
  • Client: Derby County Council
  • Contractor: Balfour Beatty
  • Consulting engineer: Atkins
  • MGF Depot: Midlands – Rugeley
  • Product hired: 406UC Hydraulic Brace, 10M Larssen Piles

The verdict

From early in the tender process MGF have been heavily involved with Balfour Beatty to develop an innovative, cost effective and highly complicated cofferdam design; which helped make Balfour Beatty’s tender attractive to the client, Derby City Council.

Michael Rummens, Balfour Beatty Site Agent, commented:

MGF were brought in at tender stage to assist in the value engineering of the cofferdam and support frames. Upon contract award, MGF’s technical team were extremely proactive in producing a workable design in line with the projects requirements. The professional, amenable and expedient attitude continued throughout the process from design, technical support, plant hire and delivery and site assistance.”

 


 

For more information: MGF Ltd | +44 (0)1942 402700 | www.mgf.co.uk