Installation of fish exclusion intake screen compliant with the Eels Regulations
Glanua was contracted by Uisce Eireann (Irish Water) to design and build a new Wastewater Treatment Plant (WWTP) under the Early Contractor Involvement (ECI) programme.
KEE Process design upgrade solution for Anglian Water using NuDisc® technology
Hydro International’s UK Wastewater Services, M&N, cuts OPEX costs and carbon footprint
KEE uses ‘Fixed Film’ technology to meet Northern Ireland Waters’ discharge standards at Derrylin
Wastewater pumping solution for industrial lorry park – Dutypoint Ltd deliver outstanding solutions
Yorkshire Water secures cost savings, pollution reduction, energy use reduction and carbon reduction at problematic pumping station site
Aeration & IFAS installation
KEE Process design and manufacture extended NuDisc® 2000 RBC Installation for Spanish village
Mecana pile cloth media filtration Installation – largest 2-stage Mecana installation in the world
MNSS combined screen protects a Thames Water treatment works from rag carry over
SAVECO Environmental are supplying 3 (No.) 57m travelling bridges to Laing O’Rourke for the Beckton STW inlet works grit removal plant
Sulzer supports Ross-shire Engineering Ltd in the delivery of the new filtration standards
LDPE PF Detect leak detectable dual contained hose
LDPE Protectaflex dual contained hose
KEE Process design a single piece plant to meet Severn Trent’s extremely stringent requirements in Hassop
HUBER Technology recently completed the installation and commissioning at Melton Mowbray STW
KEE Process collaborate with Northern Ireland Water on a £5m investment to construct one of the largest RBC sites in Europe
Combined Terminodour™ & Regenerative Thermal Oxidiser odour control system in Malta
Installation of new Triton® aeration and mixing units from KEE Process to reduce the carbon footprint and improve plant performance
RPVC & PTFE Protectaflex
Terminodour™ Odour Control System in the Kingdom of Saudi Arabia
Glanua undertake two projects to upgrade Affinity Water’s treatment infrastructure in Northmoor and Amersham to address risks from HS2 construction affecting the chalk aquifer
Phosphorus removal solution for a water utilities company – QuadraTANK™ helps enhance water quality
PBJ Engineering undertook a pivotal 3-month design & install project for a state-of-the-art reverse osmosis system in Greater London
Eel Regulations compliance by upgrading the intake with a maximum bar-spacing on the intake of 2mm and water velocity at the screen not exceeding 0.25m/s
Trant Engineering progress first stages of £15m upgrade for Southern Water
LDPE PF detect leak detectable dual contained hose
Terminodour™ and Kombi Skrub odour control system
The first Mecana installation in Severn Trent to treat Nereda discharge
KEE Process design and manufacture a gravity NuDisc® wastewater treatment plant to replace a decades old treatment system