Van Voskuilen Woudenberg B.V. has recently completed a mains renewal project for Vitens, The Netherlands, with the help of Steve Vick International (SVI) equipment
Air pigging technology commissioned for UK aqueduct project
Wessex Water Services Ltd has used the Steve Vick International (SVI) Hexi Trailer to insert 800m of new PE pipe into an old cast iron main, saving time, money and disruption to road users.
Installation of a surface water drainage system to alleviate the flooding at Beaumaris Castle
College Avenue WTW supports the Maidenhead water supply infrastructure. It is a strategically important production site and must run constantly and without outages to supply several thousand customers
Design and support for a hydro power house and turbine chamber in centre of Derby
TSL Ltd utilise the slide rail temporary works shoring system from National Trench Safety to achieve rapid progress on the groundworks and civils package
Installing soil nails
Steve Vick International’s Contract Service team gifted their time and resources to assist The Friends of Gedling Country Park on an overspill tank installation project
Structural rehabilitation of man-entry GRP culvert relining project
FLI Precast Solutions construct blending chamber and PFET for Welsh Water
Replacement and reinforcement of Harrogate’s water supply infrastructure
FT Pipeline Systems supplied steel pipes with a 3-layer PE external coating and DWI approved internal coating to MMB and United Utilities for the Hallbank Tunnel Replacement Project
Providing support for the installation of a new foul pumping chamber tank in Jersey
A South East Water fresh water reservoir near Sittingbourne in Kent was in need of some repairs to resolve water ingress and extend the life of the structure.
A temporary works solution for major sewer upgrades in Auckland, New Zealand
Upgrade the Water Supply GRID for Bridgewater with a challenging design
Providing a remote location with a continuous water supply
Installing sheet piles for sewer and water system upgrade
Installing steel sheet piles for sewer and water system upgrade
Resilient stormwater management
A three-year project to provide National Grid with a 5km long, 3.65m diameter tunnel bored 30m under the river bed
Trant Engineering progress first stages of £15m upgrade for Southern Water
Sheet piled cofferdam for the Birmingham Resilience Project
Xypex was used the western section of the tunnel and as the sole waterproofer for the Hammersmith Connection Tunnel. The Western Section runs from Acton to Carnworth Road in Fulham.
Specialist welding solutions