Search
Water Companies
Water & Wastewater
Water Supply Only
Flood Protection & Alleviation
Other
Case Studies
Wastewater Treatment & Sewerage
Water Treatment & Supply
Flood Alleviation
Renewable Energy
River Work
Energy Management
Industrial
Innovations
Asset Maintenance & Rehabilitation
Process Plant & Equipment
Process Technologies
Smart Systems/Optimisation
Supply Chain
Digital Flipbooks
Jobs Board
Mini Case Studies
Company News
Login
Sign In
Sign Up
Nominate/Submit Case Studies
Become a Featured Company
Job Board
Case Study Category:
Wastewater Treatment and Sewerage
Linwood & Johnstone WwTW (2004)
Leigh WwTW (2004)
Kirklevington STW (2004)
Reading STW (2004)
Heckmondwike CSO (2004)
Gelligaled Solar Powered CSO (2004)
Hartshill WwTW (2004)
Holyhead WwTW (2004)
High Wycombe STW (2004)
Hyndburn WwTW (2004)
Glasgow Strategic Drainage Plan (2004)
K3 East (2004)
Hoddesdon Transfer Scheme (2004)
Five Fords WwTW (2004)
Cardigan Catchment Solution (2004)
Ballynacor WwTW – Sludge Reclying Centre (2004)
Anglian Water Sludge Strategy (2004)
Crofton WwTW (2004)
Atwick WwTW (2004)
Croal UID (2004)
Balby WwTW (2004)
Buxton STW (2004)
Bristol Redland CSO (2004)
Bradford UID Improvement Scheme (2004)
Braystones WwTW (2004)
Crossness STW (2004)
Abbey Mills Pumping Station (2004)
Barnstaple & Bideford CSOs (2004)
Taw Torridge STW (2003)
Urchfont STW (2003)
Dartmouth STW (2003)
Yorkshire Water Incinerator Upgrades Part 1 (2003)
Yorkshire Water West Area CSO Programme (2003)
Rye Meads STW – Upgrade (2003)
Porthcawl CSOs (2003)
Plymouth WWT Scheme (2003)
Poole STW – UV Disinfection & Storm Tanks (2003)
Small STWs Programme (2003)
Skipsea WwTW (2003)
CSO Programme (2003)
Sandown WwTW (2003)
Sculthorpe WwTW (2003)
Otterton STW (2003)
Lytchett Minster STW (2003)
Llangefni WwTW (2003)
Llandudno Sewage Flooding Prevention Scheme (2003)
Llangrannog WwTW (2003)
Lynmouth STW (2003)
Frittenden WwTW (2003)
Harrogate North WwTW (2003)
Munlochy & Avoch STW (2003)
Foord Valley (Folkestone) Flood Alleviation Scheme (2003)
Derby STW (2003)
Cromarty & Gairloch Drainage Schemes (2003)
Cawood, Kellfield & Wistow Sewage Treatment Scheme (2003)
Cumbria & Ribble UV Projects (2003)
Eastwood WwTW (2003)
Esk Valley CSOs (2003)
Calder Vale STW (2003)
Croyde STW (2003)
Chapel en le Frith WwTW (2003)
Crewkerne East STW (2003)
Bath CSOs (2003)
Ballynacor WwTW – Sludge Reclying Centre (2003)
Bexhill & Hastings WwTW (2003)
Bewdley Sewer Diversion – Phase 1A (2003)
Bristol (Avonmouth) STW – CHP (2003)
Barton, Pilling & Ingleton WwTWs (2003)
Ballymena WwTW (2003)
Bristol (Avonmouth) STW – Storm Tanks (2003)
Banbridge WwTW (2003)
Camborne STW (2002)
Bristol WwTW (2002)
Coastal Communities Stormwater Management (2002)
Broughton WwTW (2002)
Avonmouth WwTW (2002)
Aberdeen Nigg STC (2002)
Benbecula STW (2002)
Falmouth CSO Improvements (2002)
Dover & Folkestone WwTW Upgrade (2002)
Cork Main Drainage Scheme (2002)
Flow Measurement at Sewage Treatment Works (2002)
Colwyn Bay CSO Improvement Scheme (2002)
Dublin Strategic Drainage Study (2002)
Cramond Wastewater Improvement Scheme (2002)
Cromer WwTW (2002)
Eastbourne WwTW (2002)
Hornsea & Mappleton UWwTD Schemes (2002)
Meadowhead, Stevenston & Inverclyde STWs (2002)
Kirkwall WwTW (2002)
Holybourne Pumping Station (2002)
Moray Watewater Project (2002)
Hastings WwTW (2002)
Garnswilt WwTW (2002)
Prestatyn & Llanasa WwTW (2002)
Penicuik WwTW (2002)
Stirling WwTW (2002)
Rye Meads STW – Storm Pumping Station (2002)
Poundbury STW (2002)
Riverside STW (2002)
Redacre WwTW (2002)
Shoreham WwTW (2002)
UV Disinfection Programme (2002)
Rye Meads STW – Lagoon Remediation (2002)
Royal Oak Pumping Station (2002)
Newry WwTW (2002)
Westbury STW (2002)
Wigan WwTW (2002)
Worthing WwTW (2002)
Torbay STW (2002)
Sludge Pathogen Removal (2002)
Knostrop Sludge Treatment Facility (2018)
Highworth WwTW (2018)
Woolston WwT Scheme – Part 3 (2018)
King’s Scholars’ Pond Sewer (2018)
Christchurch STW Inlet Rising Main Renovation (2018)
Minworth STW – Thermal Hydrolysis Plant (2018)
Strongford STW – THP (2018)
Bellozanne STW (2018)
Blackpool South Surface Water Strategy (2018)
Morecambe WwTW Catchment Strategy: Part 1 (2018)
Countess Wear Stormwater UV Irradiation Plant (2018)
Station Road (Queensbury) Sewer Flooding (2018)
Swinstie Pipe Bridge Replacement (2018)
Galgorm Wastewater Pumping Station Upgrade (2018)
Preston WwTW (2018)
South West Water Shellfish Waters NEP AMP6 Programme (2018)
Royton WwTW (2018)
Nine Elms, Battersea Growth & SuDS (2018)
Chalton WRC (2018)
Stanbridgeford STW (2018)
Hayle STW – Inlet Refurbishment Works (2018)
Frome Valley Relief Sewer (2018)
Blackburn and Darwen WwTWs (2018)
Hagley (Newfield Road) Flood Alleviation (2018)
Ballycastle Wastewater Project (2018)
Chorley WwTW (2018)
Inverurie WwTW (2018)
Plymouth Central STW Stormwater UV Irradiation (2018)
Great Dunmow Water Recycling Centre (2018)
Pebworth-Long Marston-Stratford upon Avon Transfer (2018)
Bournemouth CIS Tunnel Renovation (2018)
Ashford WwTW Sludge Treatment Centre (2018)
East Tanfield STW (2018)
Killingworth & Longbenton Water Management (2018)
North Wales Sludge Strategy & Five Fords AAD (2018)
Llanfaethlu WwTW (2018)
Deephams STW – A630 Major Upgrade (2018)
Tideway Central – Overview (2018)
Minworth STW – ICA Enablers Scheme (2018)
Fluxton & Ottery St Mary STWs (2017)
Northumbrian Water Wastewater Minor Works Programme (2017)
Margate & Broadstairs Wastewater Pumping Stations (2017)
Blackburn and Darwen WwTWs (2017)
Basingstoke Sludge Treatment Centre (2017)
Littlemore Sewage Pumping Station (2017)
Cambrian RainScape (2017)
Linnet Rise Flood Alleviation scheme (2017)
Netheridge STW (2017)
Flamborough Head Sewage Pumping Station (2017)
Marsh Mills WwTW (2017)
Heanor Breach Road Flood Alleviation Scheme (2017)
Avonmouth Acid Phase Digestion Remedials (2017)
MAC Extensometer (2017)
Innovative Groundwater Control (2017)
Minworth STW – Thermal Hydrolysis Plant (2017)
Retford STW (2017)
Beckton to Riverside Sludge Mains Refurbishment (2017)
United Utilities CIP2 & P1 Trials (2017)
Oldham & Royton Integrated Strategy (ORIS) (2017)
DCWW Coastal Investigations Programme (2017)
DCWW Wastewater Treatment Works Rationalisation (2017)
Maltsters Rising Main (2017)
Davyhulme WwTW Modernisation Project (2017)
Bynea Sewage Pumping Station (2017)
Wicklow Wastewater Upgrade Bundle (2017)
Olympia Leisure Centre and Windsor Park Storm Sewer Project (2017)
Saltend WwTW (2017)
Foreness Point Intertidal Habitat Enhancement Plan (2017)
Wheatcroft Long Sea Outfall (2017)
East Worthing WwTW (2017)
Salford Priors S101a – First Time Sewerage Scheme (2017)
Allonby WwTW (2017)
Tideway Central – Vessel Relocation (2017)
Nereda in Ireland (2017)
Mogden STW (2017)
Shirebrook STW (2017)
Bristol Road Sewer Pumping Station (2017)
Hesketh Bank WwTW (2017)
Whitburn Spill Reduction (2017)
Woolston WwT Scheme – Part 2 (2017)
Highbridge SPS Stormwater UV Disinfection (2016)
Tideway East – Challenges (2016)
Military Road Rising Main Replacement Scheme (2016)
SAL 172 Stormwater Storage: Part 2 (2016)
Portbury Wharf STW (2016)
Garendon Green (Loughborough) Flood Alleviation (2016)
Salcombe Sewer Flood Alleviation (2016)
Beckton STW (2016)
Kelham Road (Newark) Flood Alleviation Scheme (2016)
Posts navigation
Previous page
Page
1
…
Page
4
Page
5
Page
6
Next page