Search
Nominate/Submit Case Studies
Job Board
Glass-coated steel stormwater storage tanks - Courtesy of @one Alliance
Cotton Valley WRC (2024)
New storm tank with control panel and access staircase - Courtesy of Galliford Try
Hawkchurch STW (2024)
Drone photograph of completed site (May 2024) - Courtesy of Dawson WAM
Lower Woodburn WwPS (2024)
(left) Isolators and (right) new flow meters within chamber - Courtesy of Galliford Try
Offwell Storm Tank (2024)
Inside the Galmpton stormwater storage tank - Courtesy of Galliford Try
Galmpton Catchment (2024)
(left) A view of works underway at night, (middle) secondary lining complete, and (right) view from the base of the CSO drop shaft - Courtesy of Barhale
Tideway Central – Victoria Embankment (2024)
Burnley WwTW Catchment Strategy (2023)
Glenboi Flood Alleviation Project (2023)
Tideway West – Barn Elms CSO Connection Tunnel (2023)
Ards North Wastewater Improvement Scheme (2023)
Warrenpoint WwTW (2023)
Stroud Sewerage Strategy Project: Part 2 (2023)
Guildford STW (2023)
Marhamchurch SPS (2023)
Meadow Road Stormwater Tank (2023)
Brook Street (Dawlish) CSO (2023)
St Augustines Road Flood Alleviation (2023)
Horwich WwTW above-ground 8m high precast storm detention tank - Courtesy of A-Consult Ltd
Horwich WwTW (2022)
Carlisle STW: Looking from inlet works with storm management area and tertiary treatment are - Courtesy of J Murphy & Sons
Carlisle WwTW (2022)
Construction of the new main storm overflow shaft - Courtesy of Esh-Stantec JV
Johnson Street Storm Overflow Screening Project (2022)
Tideway East – Earl Pumping Station (2022)
Aerial of detention tank construction - Courtesy of United Utilities
High Frequency Risk Reduction: Moor Road (2022)
Detention tank shaft construction: (left) jacking ring and (right) roof beams installation - Courtesy of United Utilities
High Frequency Risk Reduction: Rock View (2022)
Stroud Sewerage Strategy Project: Part 1 (2022)
Aerial view of the Blackburn Nereda plant and tertiary treatment plant at Blackburn WwTW - Courtesy of United Utilities
Blackburn and Darwen WwTWs (2022)
Burnley WwTW: integration of new works into constrained site including earth bund of excavated material - Courtesy of United Utilities & Advance-plus
Burnley WwTW Catchment Strategy (2022)
Carlisle WwTW (2021)
SWELL – Warrenpoint WwTW (2021)
Blackburn and Darwen WwTWs (2021)
Tideway East – TBM Delivery (2021)
Tideway Central – Watertightness Testing (2021)
Burnley WwTW Catchment Strategy (2021)
Tideway Central – Albert Embankment Foreshore (2021)
Tideway Central – Main Tunnel Primary Lining (2021)
Tideway Central – Main Tunnel Secondary Lining (2021)
Tideway Central – Junctions (2021)
Tideway Central – Blackfriars Bridge Foreshore (2021)
Tideway Central – Vortex Pipes (2021)
Lowdham, Gunthorpe Road, Flood Alleviation (2021)
Wolsingham STW (2021)
Maryville Avenue, Belfast, Flood Alleviation Project (2021)
Toome Road, Ballymena, Flood Alleviation Project (2021)
Tideway Central – Falconbrook Pumping Station (2020)
Counters Creek Flood Alleviation Scheme (2020)
Tideway Central – Marine Works (2020)
Tideway Central – Chelsea Embankment Foreshore (2020)
Morecambe WwTW Catchment Strategy: Part 3 (2020)
Tideway Central – Albert Embankment Foreshore (2020)
Blackburn and Darwen WwTWs (2020)
Northumberland & Halfway SPS (2020)
Portaferry Road Newtownards Wastewater Pumping Station (2020)
Oldham & Royton Integrated Strategy (ORIS) (2020)
Nottingham, Shakespeare Street, Flood Alleviation (2020)
Hookstone Road CSO (2020)
Kirk Hallam, Abbott Road, Flood Alleviation Scheme (2020)
Paisley Tunnel Project (2019)
Thanet Sewer Rehabilitation Scheme – Phase 2 (2019)
Medlock Quality Programme (2019)
Tideway East – Hydraulic Modelling (2019)
Blackburn and Darwen WwTWs (2019)
Barston STW (2019)
Ardersier WwTW (2019)
Flass Vale (Durham) Sewerage Scheme (2019)
Tideway West – Hammersmith PS (2019)
Crankley Point Terminal Pumping Station (2019)
Alum Waters Sewer Flooding Alleviation Scheme (2019)
Morecambe WwTW Catchment Strategy: Part 2 (2019)
Mansfield, Gunthorpe Court, Flood Alleviation (2019)
Bloomfield Road (Blackpool) Tunnel Sleeving (2013)
Briton Ferry FAS (2013)
Cumbernauld SuDS (2013)
Heswall WwTW – Shellfish Waters (2013)
Lee Tunnel – TBM Launch (2013)
Millom WwTW – Stormwater UV (2013)
Meadowhead & Stevenston Stormwater Transfer (2013)
Preston 32 UIDs (2013)
Yorkshire Water rBWD – Scarborough WwTW (2013)
Lee Tunnel – TBM Drive & Tunnel Lining (2014)
SAL 172 Stormwater Storage: Part 1 (2014)
Preston 7 UIDs (2014)
Newry Road Wastewater Pumping Station (2014)
Maida Vale FAS (2014)
Londonderry Drainage Area Plan Implementation (2014)
Harlow Network Upgrade (2014)
Fort Cumberland Storm Tank (2014)
Drumbeg Drive Wastewater Pumping Station (2014)
Cowdenbeath Wetlands (2014)
Blackburn WwTW UIDs (2014)
Barrow WwTW (2014)
Airdrie Environmental Project (2012)
Ardbeg & Port Bannatyne Sewerage Scheme (2012)
Burry Inlet Investigations (2012)
Langdon Road Sewage Pumping Station (2012)
Yorkshire Water rBWD – Scarborough WwTW (2012)
Lee Tunnel – Shaft Construction (2012)
Willenhall UID (2012)
Torquay (Abbey Park) Bathing Waters (2015)
Thames Tideway Tunnel – Overview (2015)
Sycamore Road Storage Shaft FAS (2015)
Lee Tunnel – Tideway Pumping Station (2015)
Lee Tunnel – Secondary Lining (2015)
Ivybridge Bathing Waters (2015)
Herne Hill & Dulwich FAS (2015)
Holbeton Bathing Waters (2015)
Ash Lane Detention Tank (2015)
Sudbourne Road (Brixton) FAS (2011)
Longbenton FAS (2011)
Loch Ryan Wastewater Treatment Scheme (2011)
Thames Tideway Tunnel – Overview (2011)
Whitley Bay Flood Alleviation Scheme (2010)
Park Avenue FAS (2010)
Maidstone – Woolley Road SuDS (2010)
Canterbury Sewerage Scheme (2010)
West Ham FAS (2009)
Steynton (Merlins Bridge) Pumping Station (2009)
Great Yarmouth FAS (2009)
Bristol City Flood Alleviation (2009)
Albrighton FWS Flood Alleviation (2009)
Bristol City Flood Alleviation (2008)
Towngate CSO (2006)
Merthyr Dyfan Wastewater Storage Tank (2006)
UID Programme (2005)
Knostrop WwTW – Innovative Storm Tank Cleaning (2005)
Huxley Green UIDs (2005)
Bridgewater UIDs (2005)
Tamerton Foliot Wastewater Storage (2004)
Stoke UIDs (2004)
Cardigan Catchment Solution (2004)
Croal UID (2004)
Bradford UID Improvement Scheme (2004)
Barnstaple & Bideford CSOs (2004)
Porthcawl CSOs (2003)
Plymouth WWT Scheme (2003)
Poole STW – UV Disinfection & Storm Tanks (2003)
Bristol (Avonmouth) STW – Storm Tanks (2003)
Bristol WwTW (2002)
Falmouth CSO Improvements (2002)
Colwyn Bay CSO Improvement Scheme (2002)
Garnswilt WwTW (2002)
Bellozanne STW (2018)
Blackpool South Surface Water Strategy (2018)
Morecambe WwTW Catchment Strategy: Part 1 (2018)
Station Road (Queensbury) Sewer Flooding (2018)
Galgorm Wastewater Pumping Station Upgrade (2018)
Preston WwTW (2018)
Royton WwTW (2018)
Nine Elms, Battersea Growth & SuDS (2018)
Blackburn and Darwen WwTWs (2018)
Ballycastle Wastewater Project (2018)
Tideway Central – Overview (2018)
Blackburn and Darwen WwTWs (2017)
Cambrian RainScape (2017)
Linnet Rise Flood Alleviation scheme (2017)
Heanor Breach Road Flood Alleviation Scheme (2017)
Oldham & Royton Integrated Strategy (ORIS) (2017)
Tideway Central – Vessel Relocation (2017)
Tideway East – Challenges (2016)
SAL 172 Stormwater Storage: Part 2 (2016)
Garendon Green (Loughborough) Flood Alleviation (2016)
Kelham Road (Newark) Flood Alleviation Scheme (2016)
Fellgate Surface Water Management (2016)
Shieldhall Tunnel (2016)
Anchorsholme Park Storage (2016)
Gloves Lane (Blackwell) Terminal Pumping Station (2016)
Elmvale Row Sewer Flooding Prevention Scheme (2016)
Fleetwood WwTW Stormwater Storage (2015)
Lee Tunnel – Introduction (2011)