Search
Nominate/Submit Case Studies
Job Board
View across Burnside Square, Campbeltown - Courtesy of DAWSON-WAM Ltd
Campbeltown Flood Protection Scheme (2024)
Stormwater storage shaft under construction - Courtesy of Whitehouse Studios and (right) Inside the tank - Courtesy of George Leslie Ltd
Braidholm Road Sewer Flood Alleviation (2024)
Construction of the high-level inlet works structure - Courtesy of Bam Nuttall Ltd
Guildford STW (2024)
Installation of temporary bypass pipework - Courtesy of Paul Milligan & Caledonia Water Alliance
Saltcoats Rising Main (2024)
Vanderkamp UK’s overpumping pipework - Courtesy of Anglian Water’s @one Alliance
Ise Valley Sewer Rehabilitation (2024)
Vanderkamp UK’s overpumping pipework - Courtesy of Anglian Water’s @one Alliance
Grays Sewer Rehabilitation (2024)
View of Ravenhill Avenue & Ravenhill Road from Edge of Ormeau Park - Courtesy of GEDA Construction
Ravenhill Avenue, Belfast, Flood Alleviation Project (2024)
Inside the Galmpton stormwater storage tank - Courtesy of Galliford Try
Galmpton Catchment (2024)
Red Doles CSO (2024)
(left) A view of works underway at night, (middle) secondary lining complete, and (right) view from the base of the CSO drop shaft - Courtesy of Barhale
Tideway Central – Victoria Embankment (2024)
Ards North Long Sea Outfall (2023)
Hathershaw Fields CSO & Bardsley WwPS (2023)
Tideway West – Barn Elms CSO Connection Tunnel (2023)
Ards North Wastewater Improvement Scheme (2023)
Arklow Long Sea Outfall (2023)
Norton, Presteigne & Weobley WwTWs (2023)
Newthorpe STW (2023)
Potters Way Sewer Rehabilitation (2023)
Stroud Sewerage Strategy Project: Part 2 (2023)
Sherston S101a – First Time Sewerage Scheme (2023)
Stratton SPS to Helebridge STW Rising Main (2023)
Site overview: BIM model of new Guildford STW - Courtesy of BAM Enpure JV
Guildford STW (2023)
Marhamchurch SPS (2023)
Chilton Foliat STW Flow Compliance (2023)
Brook Street (Dawlish) CSO (2023)
St Augustines Road Flood Alleviation (2023)
North London Heat & Power Sewer Diversion (2022)
Tideway East – Earl Pumping Station (2022)
Aerial of detention tank construction - Courtesy of United Utilities
High Frequency Risk Reduction: Moor Road (2022)
Detention tank shaft construction: (left) jacking ring and (right) roof beams installation - Courtesy of United Utilities
High Frequency Risk Reduction: Rock View (2022)
Gravity sewer pipe from Funke Gruppe - Courtesy of Envolve Infrastructure
Chippenham Gateway Sewer (2022)
Stroud Sewerage Strategy Project: Part 1 (2022)
Aerial view of the Blackburn Nereda plant and tertiary treatment plant at Blackburn WwTW - Courtesy of United Utilities
Blackburn and Darwen WwTWs (2022)
Teversal S101a – First Time Sewerage Scheme (2022)
Ravenhill Avenue, Belfast, Flood Alleviation Project (2022)
Waverley Growth (2021)
Holloway Storm Relief Sewer (2021)
Blackburn and Darwen WwTWs (2021)
Tideway East – TBM Delivery (2021)
Tideway Central – Watertightness Testing (2021)
Tideway Central – Albert Embankment Foreshore (2021)
Tideway Central – Main Tunnel Primary Lining (2021)
Tideway Central – Main Tunnel Secondary Lining (2021)
Tideway Central – Junctions (2021)
Tideway Central – Blackfriars Bridge Foreshore (2021)
Tideway Central – Falconbrook PS CSO Shaft (2021)
Tideway Central – Vortex Pipes (2021)
Walton S101a – First Time Sewerage Connection (2021)
River Parrett Twin CIPP Pressure Lining Renovation (2021)
Withernsea Long Sea Outfall – Part 2 (2021)
Lowdham, Gunthorpe Road, Flood Alleviation (2021)
Maryville Avenue, Belfast, Flood Alleviation Project (2021)
Ashbourne STW (2021)
Roundknowe CRFP (2020)
Tideway Central – Falconbrook Pumping Station (2020)
Tideway Central – Marine Works (2020)
Tideway Central – Chelsea Embankment Foreshore (2020)
Morecambe WwTW Catchment Strategy: Part 3 (2020)
Withernsea Long Sea Outfall – Part 1 (2020)
Tideway Central – Albert Embankment Foreshore (2020)
Upperwood S101a – First Time Sewerage Scheme (2020)
Blackburn and Darwen WwTWs (2020)
Northumberland & Halfway SPS (2020)
Portaferry Road Newtownards Wastewater Pumping Station (2020)
Oldham & Royton Integrated Strategy (ORIS) (2020)
Nottingham, Shakespeare Street, Flood Alleviation (2020)
Hookstone Road CSO (2020)
Kirk Hallam, Abbott Road, Flood Alleviation Scheme (2020)
Zouch S101a – First Time Sewerage Scheme (2020)
Phillipson Street CSO Scheme (2020)
Re–Rounder (2020)
Anchorsholme Long Sea Outfall (2019)
Waterworks Bridge Reconstruction (2019)
Paisley Tunnel Project (2019)
Thanet Sewer Rehabilitation Scheme – Phase 2 (2019)
Kiln Road Sewage Pumping Station (2019)
Gulson Road (Coventry) Sewer Diversion (2019)
Medlock Quality Programme (2019)
Renny’s Lane Foul Sewer Rising Main Replacement (2019)
Tideway East – Hydraulic Modelling (2019)
Slimbridge Infiltration Reduction (2019)
Blackburn and Darwen WwTWs (2019)
Barston STW (2019)
Quay Road Charlestown DG5 Flooding Scheme (2019)
Stocksbridge WwTW (2019)
Tideway West – Hammersmith PS (2019)
Morecambe WwTW Catchment Strategy: Part 2 (2019)
Sheet piled cofferdam for open-dig section of 1200mm combined sewer and 900mm overflow pipelines - Courtesy of DAWSON-WAM Ltd
Ormeau Avenue Sewerage Upgrade (2019)
Mansfield, Gunthorpe Court, Flood Alleviation (2019)
Construction of new siphon chamber reinforced concrete base - Courtesy of DAWSON-WAM Ltd
Queens Bridge Siphons (2019)
Stromness Wastewater Network (2019)
Acklam Road Screening Structure (2013)
Beachley Sewerage Scheme (2013)
Benone Area Sewerage Scheme (2013)
Coventry Road (Hinckley) FAS (2013)
River Rangers (2013)
Eltham Road SPS & Rising Main (2013)
Gowerton WwTW – Sea Outfall (2013)
Knightcott to Banwell (M5) Sewer Repair (2013)
Lee Tunnel – TBM Launch (2013)
Nuns Moor Pilot Sustainability Study (2013)
Preston 32 UIDs (2013)
Rochdale AMP5 UIDs (2013)
River Medina Rising Main Crossing (2013)
Yorkshire Water rBWD – Scarborough WwTW (2013)
Whitehaven (Parton) Long Sea Outfall (2013)
Electro Scan (2014)
Lee Tunnel – TBM Drive & Tunnel Lining (2014)
Torbay Sewer Rehabilitation Scheme (2014)
Swindon Networks Upgrade Project (2014)
Singleton Park (Swansea) 5 CSOs Scheme (2014)
Saltney & Kinmel Bay Rising Main Replacements (2014)
Preston 7 UIDs (2014)
Newry Road Wastewater Pumping Station (2014)
Mersey Valley Sludge Main River Irwell Crossing (2014)
Maida Vale FAS (2014)
Londonderry Drainage Area Plan Implementation (2014)
Llanelli – Retro Fit Green Infrastructure (2014)
Liverpool WwTW – Outfall Extension (2014)
Keynsham Requisition Sewer (2014)
Hassop Sewerage Scheme (2014)
Harlow Network Upgrade (2014)
Greenstreets at Counters Creek SuDS Retrofit Pilot Scheme (2014)
Glyncoed Terrace FAS (2014)
Clifton Rising Main (2014)
Chester Brick Sewer Rehabilitation (2014)
Blackmill Rainscape Strategy Scheme (2014)
Blackburn UID Scheme (2014)
Billesdon (Church St) FAS (2014)
Bangor Sewerage Improvement Scheme (2014)
Alltwen-Pontardawe Combined Sewer River Crossing (2014)
Airdrie Environmental Project (2012)
Ardbeg & Port Bannatyne Sewerage Scheme (2012)
Botany Bay Road Sewer Improvement Scheme (2012)
Botley Sewer Renewal (2012)
Burry Inlet Investigations (2012)
Buxton Critical Sewer Rehabilitation Scheme (2012)
Carmarthen Wastewater Improvement Scheme (2012)
Crowlas Sewer Replacement (2012)
Newport Parrog Long Sea Outfall (2012)
Yorkshire Water rBWD – Scarborough WwTW (2012)
Sawley Road & Nooning Lane Defective Rising Main (2012)
Lee Tunnel – Shaft Construction (2012)
Tyneside Sustainable Sewerage Pilot Study (2012)
Columbia Road FAS (2012)
Wallsend Flooding (2015)
(top left) the existing Canklow regulator gate (bottom left) 3D model of the new Canklow Regulator and (right) bathymetry of Woodhouse Mill Washland - Courtesy of JBA-Bentley
Truro DG5 Flooding Scheme (2015)
Torquay (Abbey Park) Bathing Waters (2015)
Winlaton Mill FAS (2015)
Thames Tideway Tunnel – Overview (2015)
Thanet Sewer Rehabilitation Scheme (2015)
Sycamore Road Storage Shaft FAS (2015)
St Judes Way (Rainworth) FAS (2015)
Swindon Southern Trunk Sewer Phase 2 (2015)
Swindon STW Network & Growth Upgrade Project (2015)
Private Drain & Sewers (2015)
Portsmouth FAS – Early Warning Scheme (2015)
Portsmouth FAS – Sewer Network Improvements (2015)
Lee Tunnel – Tideway Pumping Station (2015)
Lee Tunnel – Secondary Lining (2015)
Ivybridge Bathing Waters (2015)
Herne Hill & Dulwich FAS (2015)
Holywood Sewer Network Improvements Project (2015)
Holbeton Bathing Waters (2015)
Colebrook FAS (2015)
Coningswath Road (Carlton) FAS (2015)
Chamberlayne Road FAS (2015)
Charlton Hayes Interceptor Sewer (2015)
Yorkshire Water rBWD – Bridlington Stormwater Outfall (2015)
Barrow in Furness WwTW Outfall (2015)
Whitby (Endeavour Wharf) Sewer Repair (2011)
Sudbourne Road (Brixton) FAS (2011)
Yorkshire Water rBWD – Revised Bathing Water Improvement Programme (2011)
Loch Ryan Wastewater Treatment Scheme (2011)
Thames Tideway Tunnel – Overview (2011)
Leamington Sewerage Strategy (2011)
Forth Replacement Crossing (2011)
Tyne South Bank CSOs (2010)
River Tame UPMs (2010)
Cardiff East Control Strategy (2010)
Belfast Sewers Project (2010)
West Ham FAS (2009)
The Limes Flood Prevention Scheme (2009)
Princess Parkway, Rossendale and Wyre Estuary UIDs (2009)
Peregrine Close (Swindon) FAS (2009)
Loch Ewe Bank First Time Provision (2009)
(top left) the existing Canklow regulator gate (bottom left) 3D model of the new Canklow Regulator and (right) bathymetry of Woodhouse Mill Washland - Courtesy of JBA-Bentley
Kenilworth Sewerage Strategy (2009)
Holt & Gaunts Common Sewerage Schemes (2009)
Great Yarmouth FAS (2009)
Albrighton FWS Flood Alleviation (2009)
Ystradyfodwg & Pontypridd – Wedal Road Truck Sewer Duplication (2008)
Scunthorpe (Ashby South Grange) UID (2008)
North Coast Wastewater Treatment Scheme (2008)
Plimsoll CSO (2008)
North Kessock Wastewater Transfer Scheme (2008)
Dartmouth South Town Outfall Removal (2008)
Bristol City Flood Alleviation (2008)
Acomb Crescent FAS (2008)
Tobermory STW (2007)
Yeovil Storm Sewer Renovation (2007)