Search
Nominate/Submit Case Studies
Job Board
Constructed pump-skid with Grundfos pumps and bottom-entry MCC within the security-rated kiosk - Courtesy of Mott MacDonald Bentley
Sluvad WTW (2024)
The completed Kerse Treated Water Storage Tank (May 2024) - Courtesy of ESD JV
Kerse Treated Water Storage Tank (2024)
Installing the drawdown siphons at Gouthwaite Reservoir - Courtesy of Jifmar Group
Gouthwaite Reservoir (2024)
C19 ceramic membrane vessel - Courtesy of Scottish Water
Bonnycraig WTW (2024)
Llyn y Fan Fach Reservoir - Courtesy of Arup
Llyn y Fan Fach Reservoir (2024)
Clean backwash pumping station - Courtesy of Mott MacDonald Bentley
Embsay WTW (2024)
Lining head - Courtesy of Yorkshire Water
Stockton Lane, York, Mains Rehabilitation (2024)
West Hallington Reservoir (2024)
Stithians WTW (2023)
Usk Reservoir (2023)
Wooler WTW (2023)
Parkmore Pumping Station & Trunk Main (2023)
Whitehall Distribution Service Reservoir (2023)
Bourn Reservoir (2023)
Clough Bottom Impounding Reservoir (2023)
Birds Park Impounding Reservoir (2023)
Tophill Low WTW (2023)
Rivington Upper Impounding Reservoir (2023)
Seedy Mill WTW (2023)
Durleigh WTC (2023)
Lee Road Water Treatment Plant (2023)
Hanningfield WTW – Washwater System (2023)
Alderney WTW (2023)
Green Recovery: Decarbonising Water Resources (2023)
Derg WTW (2023)
Tees & Central Strategic Pipeline: Phases 1 & 2 (2023)
Littlehempston WTW (2023)
Lluest Wen Reservoir (2023)
Wells to Glastonbury Pipeline (2023)
Isle of Wight South Strategic Optimisation (2023)
Layer to Langford Pipeline (2023)
King George V Reservoir (2023)
River Lyd Pumping Station (2023)
Lower Barden Reservoir (2023)
Faringdon to Blunsdon Trunk Main Phase 2 (2023)
Ufton Nervet WTW (2023)
Kinnerley WTW (2023)
Hingston Down Reservoir (2023)
Anglian Water’s Strategic Pipeline Alliance: Norwich to Wymondham Pipeline (2023)
Ovingham Raw Water Pumping Station (2023)
Hampton Loade WTW (2023)
Northern Resilience Phase 3 (2022)
(left) In Mosswood’s smallest dry wells, GMS flooring was installed by FSE to provide safe access and (right) Successful pipework and reactor installation at Mosswood by Fluid Sealing & Engineering (FSE) - Courtesy of MMB
Mosswood & Lumley WTWs (2022)
Severn Trent Borehole Capital Maintenance (2022)
United Utilities Filtration System Replacement (2022)
Matchams Raw Water Intake - Courtesy of South West Water
Matchams Riverbank Stabilisation (2022)
Installation of the twin pipe siphon system at Dean Clough Reservoir - Courtesy of Costain
Dean Clough Lower Impounding Reservoir (2022)
Completed liner system installation - Courtesy of Costain
Heaton Park Reservoir Liner Improvements (2022)
(top left) Construction of the original weir gates, (top right) weir gates following flood event, (bottom left) the weir gates prior to upgrade and (bottom right) the new weir gates - Courtesy of NI Water
Faughan Raw Water Pumping Station (2022)
Drone image showing strung out pipes for the Lincoln to Grantham pipeline - Courtesy of David Clarke/SkyCam East Lincolnshire
Anglian Water’s Strategic Pipeline Alliance (2022)
United Utilities Maintenance Service Provider Framework (2022)
Fontburn site viewed from dam wall - Courtesy of Northumbrian Water Group
Fontburn WTW (2022)
Queen Elizabeth II Reservoir (2022)
Riding Mill Raw Water Pumping Station (2022)
Hampton Loade eel screen arrays in the River Severn - Courtesy of Integrated Water Services (M&E) Ltd
Hampton Loade WTW – Eel Screens (2022)
Alston Spade Mill Pipeline under construction - Courtesy of Advance-plus
Alston Spade Mill Pipeline (2022)
The new Hanningfield washwater tanks - Courtesy of Essex & Suffolk Water
Hanningfield WTW – Washwater System (2022)
Southern Water Eel Screens Programme – Construction (2022)
Drumaroad CWB - Courtesy of NI Water
Drumaroad Clear Water Basin (2022)
Plas Uchaf Reservoir (2022)
Ynys-y-Fro Lower Reservoir (2022)
Pant-Yr-Eos Reservoir (2022)
London skyline from view at top of embankment - Courtesy of MWH Treatment
Maiden Lane Reservoir (2022)
Papplewick Borehole Pumping Station (2022)
Wing WTW (2022)
Swinsty Impounding Reservoir (2022)
Overall site layout rendered in 3D - Courtesy of Stantec UK
Layer WTW (2022)
Dewatering system to drawdown the water table below the construction of an ASP tank - Courtesy of OGI Groundwater Specialists Ltd
Groundwater Resource Management During Dewatering for Infrastructure Construction (2021)
Durleigh WTC (2021)
Bedersaig WTW (2021)
C1a Project (2021)
Rosebery WTW (2021)
Craighead WTW (2021)
Ludham Licence Reinvestment (2021)
Severn Trent Eels Regulation Compliance (2021)
Sunderland Groundwater Stations (2021)
Lower Neuadd Reservoir (2021)
Dolwen Reservoir (2021)
Beenhams Heath WTW (2021)
Belaugh & Waveney Raw Water Intakes (2021)
Maerdy WTW (2021)
Service Reservoir Isolation Programme (2021)
River Itchen Eel Screens Project (2021)
Poolend Borehole Capital Maintenance (2021)
Mosswood WTW (2021)
Haweswater Aqueduct, Hallbank Tunnel Replacement (2021)
Uckington Water Treatment Scheme (2021)
Heigham WTW (2021)
Bray Keleher WTW (2020)
Durleigh WTC (2020)
Tarbert WTW (2020)
Uig WTW (2020)
Invercannie WTW (2020)
Battersea Shaft Pumping Station (2020)
Keele University Water Management Plan (2020)
Blackmoorfoot Reservoir (2020)
Smart Flushing (2020)
LED UV Water Treatment (2020)
Stratford St Mary Pumping Station (2020)
Langsett WTW (2020)
Leased Lines Replacement Project (2020)
HS2 Impact Assessment (2020)
Barrow Hill Shaft (2020)
Murton WTW (2020)
Ardsbeg WTW (2020)
Ketford Borehole Pumping Station (2020)
BRP – Elan Valley Aqueduct – Birmingham Resilience Project (2020)
College Avenue Contact Tank (2020)
Llyn Brenig Reservoir (2020)
Affinity Water Metaldehyde Removal Project (2020)
Syleham WTW (2020)
Southern Water Eel Screens Programme – Design (2020)
Church Wilne WTW (2020)
Newark Waste and Water Improvement Project (2020)
Childrey Warren WTW Abstraction Closure (2020)
Langford WTW (2020)
BRP – Raw Water Project – Birmingham Resilience Project (2020)
Lough Fea Clear Water Basin South (2020)
BRP – Treated Water Project – Birmingham Resilience Project (2020)
Billericay, Danbury & Hollingsworth Road Water Towers (2020)
Rathlin Island Borehole Project – Ion Exchange Plant (2020)
Bewdley Bank Service Reservoir (2020)
Hazards Green WTW – Eel Screens (2019)
Garreglwyd Raw Water Supply Main (2019)
River Yare Pipeline Crossing & Tunnel Decommissioning (2019)
Chlorine and Sulphur Dioxide Gas Removal (2019)
Bradan WTW (2019)
Glenlatterach WTW (2019)
Lochmaddy WTW (2019)
Juas WTW (2019)
Aubrey Street Reservoir (2019)
Mythe WTW (2019)
Warland Impounding Reservoir (2019)
Cotherstone Pipe Bridge & Mains Refurbishment (2019)
Talybont Reservoir (2019)
BRP – Treated Water Project – Birmingham Resilience Project (2019)
Brantham Pumping Station (2019)
Grands Vaux Reservoir Pumping Station (2019)
Bryn Cowlyd WTW (2019)
Otterbourne WTW (2019)
Bray Keleher WTW (2019)
Loch Ness Regional WTW (2019)
Loftsome Bridge WTW – Intake (2019)
Ten Acre Impounding Reservoir (2019)
Water Supply GRID – Conclusion (2019)
Childrey Warren WTW Abstraction Closure (2019)
Thames Water AMP6 Pressure Management Programme (2019)
Abberton Pipeline Project (2013)
Abberton Scheme – Wormingford Pumping Station (2013)
Birmingham Water Treatment (2013)
Birmingham (A45) Water Mains Diversions (2013)
Black Esk Reservoir Dam Raising (2013)
Bristol Resilience – Durdham Down Combined Main (2013)
Carron Valley Mains (2013)
Coed Dolwyd Service Reservoir (2013)
Elsham WTW (2013)
Eyton Nitrates Blending Scheme (2013)
Fyne Process (2013)
Friston to Folkington Mains Transfer Scheme (2013)
Hawkridge Dam (2013)
Hanningfield WTW – Sludge Treatment Reed Beds (2013)
High Lane Service Reservoir (2013)
Highwood Bankside Storage Reservoir (2013)
Katrine Aqueduct Refurbishment (2013)
Knight & Bessborough Reservoirs – Inlet Mains (2013)
London Victorian Mains Replacement (2013)
Lostock WTW (2013)
London Strategic Model (2013)
Maple Brook Pumping Station (2013)
Water Mains Rehabilitation (NI Water) (2013)
Trunk Mains Cleaning Part 2 (2013)
Overton WSW – Nitrate Removal Plant (2013)
Rivelin WTW – Manganese Removal: Part 1 (2013)
River Ashop & River Noe Silt Issues (2013)
Reservoir SEMD Upgrade Project (2013)
AMP5 Capital Programme (2013)
Advanced Pressure Management (2013)
Shiffords Bridge Nitrate Improvement Scheme (2013)
Heavily Modified Water Directive Assessments (2013)
WaterSupply GRID – Corfe Mullen to Salisbury Transfer Main (2013)
Water Supply GRID – Eliminination of Standalone Sources (2013)
Wimbleball Dam Grouting Project (2014)
Water Supply GRID – Update (2014)
Vyrnwy Aqueduct Refurbishment (2014)
Throckley WTW Abandonment Scheme (2014)
Talla Aqueduct (2014)
Taunton Operation Clean and Clear (2014)
Speen WTW Transfer Mains (2014)
Cryptosporidium Inactivation Projects (2014)
Shelton WTW UV Scheme (2014)
Emergency UV Treatment Plant (2014)
Supply Demand Balance South Programme (2014)
River Strule Abstraction Project (2014)
Royal Oak WTW – Southport DMZ Phase 1 (2014)
Pebley Reservoir (2014)
Newton Poppleford Mains Replacement Scheme (2014)
Val De La Mare Dam – Fibre Optic Monitoring (2014)
Huntington WTW (2014)
Haweswater Aqueduct – Tunnels & Conduits Refurbishment (2014)
Hardham WSW (2014)